Confirmation of Action Ltr 89-08 Re Actions to Be Taken Prior to Unit 2 Restart to Resolve Matl Defects Associated W/Pressurizer Penetrations.Mgt Meeting Will Be Held W/Nrc Re Results of near-term Corrective Actions
ML20247L374
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/25/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
References
CAL-89-08, CAL-89-8, NUDOCS 8906020150
Download: ML20247L374 (3)


Text

____ ,

y: M r

> ;;-3 4

_'f ' '

MAY 251989 o

l p ,

' Docket Nos.: 50-317 L

.50-318~

CAL No'.: 89-08 Baltimore' Gas ~and Electric' Company ATTN: Mr. George C.' Creel-E , Vice President Nuclear Energy Calvert Cliffs: Nuclear Power Plant l MD'Rts. 2 & 4

' Post Office Box 1535-Lusby, Maryland 20657 Gentlemeni Subject': Confirmatory Action Letter 89-08; Restart Commitments

.. Pursuant to your letter of. May 23,11989, it is our understanding that the following actions will be accomplished:

' 1. Prior to restart' of Unit 2, determine and resolve the apparent material i

' defects associated with the pressuri2.er penetrations, and prior to restart of Unit 1, provide the basis for a determination that the. issue either. is not applicable to Unit 1 or, if applicable, that the issue has been resolved such that the unit can be safely operated.

2. Prior to restart of either unit, determhe and correct the root cause(s) of the problems which have been manifested as weaknesses in:

'a. -Control of system status,

b. Control of work activities, and I
c. Procedure use and control of procedure changes.

)

It Lis recognized that some longer term corrective actions may be imple-mented as part of your overall Performance Improvement Plan.

3. Prior to restart of the first unit participate in a management meeting with NRC in order to - present the results of your near-term corrective action and efforts you have taken to provide adequate assurance that such problems will not recur.

m  ;

89060 1M E ho hPNV 17 PDR G

0FFICIAL RECORD COPY i l CALVERT CLIFFS CAL - 0001.0.0 05/23/89 f

h

)

l

\

m -

\ ,

b

( Baltimore Gas and Electric Company 2 MAY 251989 )

i i

Finally, it is understood that the agreement of the Regional Administrator, j Region I, will be obtained prior to restart of the first unit.

Issuance of the Confirmatory Action Letter does not preclude the issuance of an Order formalizing the above commitments. If your understanding differs i from that set forth above, please call me immediately, j i

i Sincerely, I

Origir.at signed By 1 d ator cc:

W. J. Lippold, General Supervisor, Technical Services Engineering T. Magette, Administrator, Nuclear Evaluations Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2) bec:

Region I Docket Room (with concurrences)

J. Taylcr, DEDR J. Lieberman, OE L. Chandler, OGC J. Partlow, NRR B. Boger, NRR R. Capra, NRR R. Wessman, NRR S. McNeil, NRR W. Russell, RI D. Holody, RI W. Kane, RI S. Collins, RI J. Wiggins, RI L. Tripp, RI D. Limroth, RI M. Miller, RI K. Abraham, RI 0FFICIAL RECORD COPY CALVERT CLIFFS CAL - 0002.0.0 05/23/89 I

. l i

a Baltimore Gas and Electric Company 3 i

- k 1

MAY 251989 {

l i

r l

l

- l l

ojW RI:DRP RI:DRP RI:E0 4RR RR l OLimroth/mjd LTripp DHolody R ra B . er 5/9D/89 5/ /89 5/t)/89 5 9 / 9  !

RI:DRP JWigg is kb RI:RA e WRussell Shi /89 5/j/89 5/9 /89 5/yf/89 0FFICIAL RECORD COPY CALVERT CLIFFS CAL - 0003.0.0 _

05/23/89 i