Forwards Insp Repts 50-317/90-25 & 50-318/90-25 on 900916-1020.One Noncited Violation Noted
ML20217A013
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/09/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20217A019 List:
References
NUDOCS 9011200158
Download: ML20217A013 (3)


See also: IR 05000317/1990025

Text

r

il,

'

,

-

7

' '

'

.. &

'

b. . .

l

i

s NOV 0 91990

.

IDocket/ License Nos.: 50-317/DPR-53

50-318/DPR-69  :

Baltimore Gas and Electric Company.

A'ITN: Mr. George C. Creel'

.Vice President - Nuclear Energy

Calvert Cliffs Nuclear Power Plant

. MD Routes 2 and 4

~ Post Office Box 1535

Lusby, Maryland 20657

'

Gentlemen:

Subjecti NRC Region I Resident Inspection Report Nos, 50-317/90-25 and ,

50-318/90 25 (September 16,1990 to October 20,1990)  ;

This report transmits the findings of the routine resident inspection conducted at the Calvert

'

Cliffs Nuclear Power Plant. - At the conclusion of the inspection, these findings were discussed.

'

3; 3

~ with Mr. Denton of your staff.

Areas examined during this inspection are described in the NRC Region I Inspection Report

swhich is enclosed ~with this letter. Within these areas, the inspection' consisted of selective e

examinations of procedures and representative records, interviews with personnel, and

-

J

"

observations by the inspectors.

i

Within' the scope of this inspection, one- non-cited violation was observed. In addition, several y

operational events were observed that, when considered with the events that occurred during the

' '

,

previous resident inspection period (Report Nos. 50-317/90 23 and 50-318/90-23), are cause for

>

' concern regarding the control of plant equipment and activities. We understand that you have-

an ongoing investigation to review the events and identify any common root causes.

-

' We are interested in the findings of this investigation as well as any corrective actions you have

p taken or plan to take. Therefore, we request that you respond to this letter within thirty days

addressing these matters.

,

i

l

l

OFFICIAL RECORD COPY

,

.c

s ,e,J

9011200158 901109

PDR

G

ADOCK 05000317

PNV f604

y

[E ,

l( ,. ,

n.

l

-

.NOV 0 91990

,

Baltimore Gas and Electric Company 2

-

2

Your cooperation with us is appreciated.

4

Sincerely, )

l

l

l

,

0 4 G:I M L stGfri o s y

Robert M. Gallo, Acting Chief

Reactor Projects Branch No.1

l

Enclosure: NRC Region I Resident Inspection Report Nos. 50-317/90-25 and -

50-318/90-25

cc w/ encl:

R. McLean, Power Plant Siting, Nuclear Evaluation

'

G.' Adams, Licensing (CCNPP)

.

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

P.'Birnie, Maryland Safe Energy Coalition

.Public Document Room (PDR)

'

L Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) i

NRC Resident Inspector

State of Maryland (2) .

K. Abraham, PAO-RI (2) +

,

'

l '.

t

..

l.

3

OFFICIAL RECORD COPY

!

- _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _

.-.

Ie

a 'I&

.',

I

f *):, +

,

l

. i

G y Baltimore Gas and Electric Company 3

NOV 0 91990- l

t! bec w/ encl:

p. - Region I Docket Room (with concurrences) l

Management Assistant, DRMA (w/o encl)  !

R. Bellamy, DRSS

,

J. Linville, DRP

',  ; C. Cowgill, DRP l

R. Summers, DRP'

l

( D. Vito, DRP j

F. Lyon, DRP -

,j R. Capra, NRR. 1

D. Mcdonald, NRR

E

~ J. Caldwell, EDO  !

M. Callahan, OCA }

bec w/ Letter and Executive Summary Only:

,

,

W. Hodges, DRS

, ,

J. Durr, DRS-
L. Bettenhausen, DRS

M. Knapp, DRSS

11. Joyner, DRSS

W. Hehl, DRP

- J. Wiggins, DRP  :

1

2

i

RI:D . P ,

LNicholson/mjd allo

11/$/90 11/ 90 j

,

OFFICIAL RECORD COPY