Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams
ML20207G863
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/25/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20207G868 List:
References
50-317-99-301OL, 50-318-99-301OL, NUDOCS 9903120185
Download: ML20207G863 (3)


See also: IR 05000317/1999301

Text

f

.n

j

February 25, 1999

Mr. Charles H. Cruse

Vice president- Nuclear Energy

l Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, MD 20657 - 4702

i SUBJECT: CALVERT CLIFFS UNIT 1 AND UNIT 2 REACTOR AND SENIOR REACTOR

' OPERATOR INITIAL EXAMINATION REPORT NOS. 50-317/99-301(OL) AND

' 50-318/99-301(OL) .

4

Dear Mr. Cruse:

~ This report transmits the results of the subject operator licensing examinations. These

examinations addressed areas important to public health and safety and were developed and

ridministered in accordance with the guidelines of the Examination Standards for Power

' Rectors (NUREG 1021, Interim Revision 8). All segments of the examination were developed

~ by Baltimore Gas and Electric Company personnel, while the NRC provided oversight and final

approval prior to the administration of the examinations. The operational portion licensing

examinations were conducted by NRC examir.ers during the period of January 25-29,1999,

i'

and the written examinstion was administered by your staff on January 22,1999, at the Calvert

. Cliffs Nuclear Power Facility. The preliminary major findings and conclusions findings, as a

result of the examinations, were discussed with your staff via a telephone conference call on

February 12,1999.

Based on the results of tne examinations, all applicants passed all portions of the examinations.

Overall quality of the 'nitial submittal was acceptable. Exam development problems were noted

' particularly in the tvalk-through tests reflecting a weak attention to detail by the facility.

In accordance with 10 CFR 2.790 of the NRC's "o utes of Paactice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room. 1

\

j

'

. i

'

Y*El PMt7

V POR

(>

J j

r j

C. C:use 2 L

No reply to this letter is required, but should you have any questions regarding this examination

report, pleare contact me at 610-337-5183, or by E-mail at RJC@NRC. GOV.

Sincerely,

ORIGINAL SIGNED BY: l

s  !

J

Richard J. Conte, Chief

Human Performance & Emergency

Preparedness Branch

Division of Reactor Safety

D.*cket Nos. 50-317; 50-318

Enclosure: Initial Examination Report Nos. 50-317/99-301(OL) and 50-318/99-301(OL)

w/ Attachments 1 through 2

cc w/ encl: w/ Attachments 1-2:

N. Winters, Training Manager

cc w/ encl: w/o Attachments 1-2:

B. Montgomery, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Oche, Maryland Safe Energy Coalition

State of Maryland (2)

!

l

1

l

l

I

i

- - .-. .- . - . . . ~ . . . .

t

,

C. Cruse 3

Distribution w/enci and w/ Attachments 1-2:

DRS Master Exam File <

l PUBLIC

Nuclear Safety Information Center (NSIC)

l l

Distribution w/ encl: w/o Attachments 1-2: *

Region I Docket Room (with concurrences)

W. Lanning, DRS  ;

W. Ruland, DRS '

'

R. Conte, DRS

J. Williams, Chief Examiner, DRS ,

. NRC Resident inspector

DRS OL Facility File (V. Curley) '

DRS File

H. Miller, RA/J. Wiggins, DRA (1)  !

D. Serenci, PAO, .

-

S. Barber, DRP l

W. Cook, DRP  !

!

R. Junod, DRP

Distribution w/ encl: w/o Attachments 1-2 (VIA E-MAIL):

G. Shear, RI EDO Coordinator-

S. Stewart - Calvert Cliffs

S. Bajwa, NRR

A. Dromerick, NRR

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

DOCDESK i

i

i

l

l

DOCUMENT NAME: G:\HPEPB\ WILLIAMS \CC9201.OL '

Te receive a copy of this document. Indicate in the box: C" = Copy without attachtnent/encbsure *E" = Copy with attachment / enclosure "N" = No copy

OFFICE Rl/DRS OM l Rl/DRS - _/l @ lA) l l ,

NAME JWilliams I RConte/'V C O!u k ,

'

DATE 2SL99 2&/99 t/2flW O2/ /99

OFFICIAL RECORD COPY