Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves
ML20199F410
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/08/1999
From: Dromerick A
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20199F418 List:
References
GL-95-07, GL-95-7, TAC-M93444, TAC-M93445, NUDOCS 9901210313
Download: ML20199F410 (4)


Text

l. January 8, 1999 i

- - Mr. Chrrles H. Cruse

  • l Vica Pr:sid:nt- Nuclzr En:rgy B ltimora G:s cnd El:ctric Comp:ny Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER 95-07, .

" PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. M93444 AND M93445) 1

Dear Mr. Cruse:

On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

In a letter dated February 13,1996, Baltimore Gas and Electric Company submitted its 180-day response to GL 95-07 for Calvert Cliffs Nuclear Power Plant, Unit Nos.1 and 2. The l Nuclear Regulatory Commission (NRC) staff reviewed the licensee's submittal and requested I additional information in a letter dated June 18,1996. In a letter dated July 25,1996, the l licensee provided the additionalinformation. The NRC staff performed two inspections to I review specific aspects of information summarized in the licensee's responses to GL 95-07.

These inspections are documented in NRC Inspection Reports 50-317,318/97-02 and 50-317, 318/98-09. In a letter dated December 2,1998, the licensee supplemented its 180-day response to GL 95-07.

The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed safety evaluation. This completes our efforts on TAC Nos. M93444 and M93445.

Sincerely,

, Original signed by:

Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 9901210313 990108 ,

Division of Reactor Projects - l/11 PDR ADOCK 05000317 P PDR Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Safety Evaluation lf cc w/ encl: See next page . - . -

r-^~' s so I DISTRIBUTION: - JU~J p Docket Filej J. Zwolinski A. Dromerick T. Harris (e-mail SE)

PUBLIC S. Bajwa R. Eaton OGC PDI-1 R/F S. Little S. Tingen ACRS C. Hehl, RGN I DOCUMENT NAME: G:\CC1-2\GLM93444.WPD to receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" m No copy 0FFICE PM:PDI_} d l l LA:PDI- % l l D:PDI1gffk l l l ___

NAME DDr/JM f: tec SLittL V SBajwa[#" A DATE 01T.9/99 01/ 9 /99 01/ f /99 01/ /99 OFFICIAL RECORD COPY

anuary 8, 1999
Mr. Chrd
s H. Cruso e Vice PresidInt- Nucirr Energy 3 B ltimore G:s cnd El:ctric CcmpIny

, Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER 95-07,

  • PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. M93444 AND M93445)

Dear Mr. Cruse:

On August 17,1995, the NRC issued Generic Letter (GL) 95-07," Pressure Locking and Thermal Binding of Safety-Related Power-Op3 rated Gate Valves," to request that licensees take actions to ensure those safety-related power operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

In a letter dated February 13,1996, Baltimore Gas and Electric Company submitted its 180- ,

day response to GL 95-07 for Calvert Cliffs Nuclear Power Plant, Unit Nos.1 and 2. The l Nuclear Regulatory Commission (NRC) staff reviewed the licensee's submittal and requested '

additional information in a letter dated June 18,1996. In a letter dated July 25,1996, the licensee provided the additionalinformation. The NRC staff performed two inspections to ,

review specific aspects of information summarized in the licensee's responses to GL 95-07. l These inspections are documented in NRC Inspection Reports 50-317,318/97-02 and 50-317, 318/98-09. In a letter dated December 2,1998, the licensee supplemented its 180-day response to GL 95-07.

The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed safety evaluation. This completes our efforts on TAC Nos. M93444 and M93445.

Sincerely, Original signed by:

Alexander W. Dromerick, Senior P:oject Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

Docket File J. Zwolinski A. Dromerick T. Harris (e-mail SE)

PUBLIC S. Bajwa R. Eaton OGC PDI-1 R/F S. Little S. Tingen ACRS C. Hehl, RGN I DOCUMENT NAME: G:\CC1-2\GLM93444.WPD To receive a copy of this docunent, indicate in the box: "C" s Copy without attachment / enclosure "E" = Copy with atttchment/ enclosure "N" a No copy 0FFICE PM:PDI-j M l LA:PDI*M) l D:PDI-1 HA l l_ _

NiME DDM cf:lec stitt V SBajus /* %

DATE 01 M /99 01/ 9 /99 01/ 1 /99 01/ /99 OFFICIAL RECORD COPY

R O utuq g, k UNITED STATES

, j j

2 NUCLEAR REGULATORY COMMISSION i

l WASHINGTON, D.C. 20666 0001 '

< p# Danuary 8, 1999 Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

SAFETY EVALUATION OF UCENSEE RESPONSE TO GENERIC LETTER 95-07,

" PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 (TAC NOS. M93444 AND M93445)

Dear Mr. Cruse:

On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.

l In a letter dated February 13,1996, Baltimore Gas and Electric Company submitted its 180-  ;

day response to GL 95-07 for Calvert Cliffs Nuclear Power Plant, Unit Nos.1 and 2. The l Nuclear Regulatory Commission (NRC) staff reviewed the licensee's submittal and requested  ;

additional information in a letter dated June 18,1996. In a letter dated July 25,1996, the )

licensee provided the additionalinformation. The NRC staff performed two inspections to '

review specific aspects of information summarized in the licensee's responses to GL 95-07.

These inspections are documented in NRC Inspection Reports 50-317,318/97-02 and 50-317,  !

318/98 09. In a letter dated December 2,1998, the licensee supplemented its 180-day response to GL 95-07.

The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed safety >

evaluation. This completes our efforts on TAC Nos. M93444 and M93445.

Sincerely, Alexander W. Dromerick, Senior Project Manager '

Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Safety Evaluation ec w/ encl: See next page

I a

  • Mr. Charles H. Cruse Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant cc:

President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street . Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire  !

Baltimore Gas and Electric Company Maryland People's Counsel i P.O. Box 1475 6 St. Paul Centre l Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 l Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Bimie, Esquire 2300 N Street, NW Co-Director  ;

Washington, DC 20037 Maryland Safe Energy Coalition i P.O. Box 33111 l

, Mr. Bruce S. Montgomery, Director Baltimore, MD 21218

-NRM l

Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatelt 1650 Calvert Cliffs Parkway NRC Technical Training' Center l Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard !. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 f- r i Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406