ML20136J187: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*
Georgia Institute of Technology                                                                            -
Neely Nuclear Research Center                                                                  -
Atlanta, Georgia 30332 (404) 894-3600                                                                          GEORGIATECH 1885-1985 DESIGN:NG TOMORROWTODAY November 20, 1985 Dr. Cecil O. Thomas, Chief Standardization and Special Projects Branch Di/ision of Licensing Nuclear Regulatory Commission Washington, D.C. 20555
 
==REFERENCE:==
DOCKET NO. 50-160
 
==Dear Dr. Thomas:==
 
This    is          to    inform you that the NRC approved Emergency Preparedness                        Plan for the Georgia Institute of Technology Research Reactor has been implemented since october 4, 1935. A copy of the Emergency Procedures is enclosed for your records.
I appreciate your giving us an extension until October 14, 1985 to impleraen t our emergency plan. As you can see from the Emergency Procedures, we had to install quite a few items for safety. Thank you.
Sincerely yours,
                                                                                  /      <      Oh R.A. Karam Director RAK:jlr Enclosure 0
0511250302 851120 PDR          ADOCK 05000160                                                                    j      b iI g F                                PDR An Equal Educata and Employment Opportunity Institute                  A Unit of the University System of Georgia}}

Latest revision as of 02:22, 1 July 2020

Advises That Emergency Preparedness Plan Implemented on 851014.Emergency Procedures Encl
ML20136J187
Person / Time
Site: Neely Research Reactor
Issue date: 11/20/1985
From: Karam R
Neely Research Reactor, ATLANTA, GA
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20136J192 List:
References
NUDOCS 8511250302
Download: ML20136J187 (1)


Text

Georgia Institute of Technology -

Neely Nuclear Research Center -

Atlanta, Georgia 30332 (404) 894-3600 GEORGIATECH 1885-1985 DESIGN:NG TOMORROWTODAY November 20, 1985 Dr. Cecil O. Thomas, Chief Standardization and Special Projects Branch Di/ision of Licensing Nuclear Regulatory Commission Washington, D.C. 20555

REFERENCE:

DOCKET NO. 50-160

Dear Dr. Thomas:

This is to inform you that the NRC approved Emergency Preparedness Plan for the Georgia Institute of Technology Research Reactor has been implemented since october 4, 1935. A copy of the Emergency Procedures is enclosed for your records.

I appreciate your giving us an extension until October 14, 1985 to impleraen t our emergency plan. As you can see from the Emergency Procedures, we had to install quite a few items for safety. Thank you.

Sincerely yours,

/ < Oh R.A. Karam Director RAK:jlr Enclosure 0

0511250302 851120 PDR ADOCK 05000160 j b iI g F PDR An Equal Educata and Employment Opportunity Institute A Unit of the University System of Georgia