Difference between revisions of "ML20133G874"

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)

Latest revision as of 20:54, 1 August 2020

Forwards Physical Security Insp Repts 50-254/85-26 & 50-265/85-29 on 850916-19.No Noncompliance Noted
ML20133G874
Person / Time
Site: Quad Cities Exelon icon.png
Issue date: 10/09/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133G877 List:
References
Download: ML20133G874 (2)


See also: IR 05000265/1985029

Text

, ( l

,, _ , . --s. .rvm!

On _uUAK Jb M TV Alv hl Nk

OCT 0 91985

Docket No. 50-254

Docket No. 50-265

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine physical security inspection conducted by

Mr. G. L. Pirtle of this office on September 16-19, 1985, of activities

at the Quad Cities Nuclear Generating Station, Units 1 and 2, authorized

by NRC Operating Licenses No. DPR-29 and No. DPR-30 and to the discussion

of our findings with Mr. T. Tamlyn and other member s of your staf f at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Areas examined during this inspection concern a subject matter which

is exempt from disclosure according to Section 73.21(c)(2) of the NRC's

" Rules of Practice," Part 73, Title 10, Code of Federal Regulations.

This information must be handled and protected in accordance with the

provisions of 10 CFR 73.21. Consequently, our report of this inspection

will not be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'

.,

[

M. L. Axelson, Chief

tuclear Materials Safety ,

and Safeguards Branch gu

I

Enclosure: Inspection Report l

No. 50-254/85026(DRSS); g

'

I

No. 50-265/85029(DRSS) (

(UNCLASSIFIED SAFEGUARDS INFORMATION)

See Attached Distribution En:losure contains

m:r,yg3 ggg,ATIC,'l

l'?ca Up3ratfcq this

8510160160 051009 p',M is Leccutrolled

POR ADOCK 05000254

G PDR

- - . . _ _ _ . .

- ---g

ru LGUnhUG lhf VimitTI Vit

I

a b

e a rrnii a nno sairnn9 a A-~ ~,n nt\ "

u .. w v . s v siiv.....-

Commonwealth Edison Company 2 OCT 0 91985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

N. Kalivianakis, Plant Manager

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Enclo wre contains

SATECUARDS It;ronMATICN

RIII III I 11 Upon ecperation thi.

Pi /kja ' hd Lfdmn -

on

10/08/85

e a rre a , n

'

4

n,,,...ON

1

w o u su ~ ,

uun