ML20129H263

From kanterella
Revision as of 06:23, 23 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-17 & 50-457/85-18 on 850401-0503.No Noncompliance Noted
ML20129H263
Person / Time
Site: Harris, Braidwood  Constellation icon.png
Issue date: 06/03/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20129H266 List:
References
NUDOCS 8506070531
Download: ML20129H263 (2)


See also: IR 05000456/1985017

Text

r -

JUN 3

E

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

'

Gentlemen:

This refers to the routine safety inspection conducted by Mr. L. G. McGregor

of this office on April 1 through May 3, 1985, of activities at Braidwood

Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. M. Wallace at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure (s) will be placed in the NRC's Public Document

Room.

8506070531 850603

$DR ADOCK 05000456 PDR

fo\

/ k\

.

-; .

_,

Commonwealth' Edison Company 2 JUN 3 1985

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

" Original signed by W. S. Little"

W. S. Little, Director

Braidwood Project

Enclosure: Inspection Report

No. 50-456/85017(DRP);

No. 50-457/85018(DRP)

cc w/ enclosure:

'O. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

.

( M

PeINe/kja F&rbd Litkle Rin

05/30/85