Similar Documents at Byron |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000455/19900211990-11-14014 November 1990 Insp Rept 50-455/90-21 on 900910-11,24-26 & 1107.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities Including Review of Program, Procedures,Observation of Work Activities & Data Review IR 05000455/19900221990-11-13013 November 1990 Insp Rept 50-455/90-22 on 901002-1107.One Violation Noted. Major Areas Inspected:Circumstances Re Closed Unit 2 Intermediate Head Safety Injection Throttle valve,2518822A ML20058G3741990-11-0505 November 1990 Page 9 to Insp Repts 50-454/90-16 & 50-455/90-15,erroneously Deleted from Original Rept IR 05000454/19900161990-08-29029 August 1990 Insp Repts 50-454/90-16 & 50-455/90-15 on 900814-17.No Violations Noted.Major Areas Inspected:Emergency Prepardness Exercise,Licensee Action on Previously Identified Items & Status of Onsite Meteorological Monitoring Program IR 05000454/19900171990-08-17017 August 1990 Insp Repts 50-454/90-17 & 50-455/90-16 on 900701-0811.No Violations or Deviations Noted.Major Areas Inspected:Esf Sys,Onsite Event Follow Up,Reactor Startup,Current Matl Condition,Radiological Controls & Security IR 05000454/19900141990-07-16016 July 1990 Safety Insp Rept 50-454/90-14 & 50-455/90-13 on 900513-0630. Major Areas Inspected:Operational Safety,Esf Sys,Onsite Event follow-up,current Matl Condition,Security,Radiological Controls & Self Assessment/Quality Verification IR 05000454/19900151990-06-26026 June 1990 Insp Repts 50-454/90-15 & 50-455/90-14 on 900611-14.No Violations or Deviations Noted.Major Areas Inspected: Radiological Protection Program Including,Changes,Audits & Surveillances,External & Maint Exposure Control IR 05000454/19890161989-08-30030 August 1989 Safety Insp Repts 50-454/89-16 & 50-455/89-18 on 890701-0819.Violations Noted.Major Areas Inspected:Plant Matl Condition,Operational Safety,Mud in Essential Svc Water Sys,Security & Discrepancy Records IR 05000454/19890141989-07-11011 July 1989 Safety Insp Repts 50-454/89-14 & 50-455/89-16 on 890518-0630.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Esf Sys Walkdown,Fire Protection,Event Followup & Maint/Surveillance IR 05000454/19890151989-07-0707 July 1989 Insp Repts 50-454/89-15 & 50-455/89-17 on 890612-20.No Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operation,Including Changes in Organization,Audits & Training & Qualification IR 05000454/19890101989-06-0505 June 1989 Insp Repts 50-454/89-10 & 50-455/89-12 on 890401-0517.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety,Event Followup,Mud Buildup in Essential Svc Water Lines,Security & LERs IR 05000454/19890131989-05-24024 May 1989 Insp Repts 50-454/89-13 & 50-455/89-15 on 890424-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000454/19890081989-04-24024 April 1989 Partially Withheld Physical Security Insp Repts 50-454/89-08 & 50-455/89-11 on 890327-0403 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Mgt Support - Security Program Audits & Protected Alarm Barriers IR 05000454/19890041989-04-19019 April 1989 Insp Repts 50-454/89-04 & 50-455/89-07 on 890217-0331. Violations Noted.Major Areas Inspected:Operational Safety, Event Followup,Maint/Surveillance,Plant Startup from Refueling & Use of under-rated Gaskets in Manways IR 05000454/19890091989-04-12012 April 1989 Insp Repts 50-454/89-09 & 50-455/89-06 on 890227-0316. Violations Noted.Major Areas Inspected:Design Changes & Mods & Dedication of Commercial Grade Equipment for safety-related Applications IR 05000454/19890071989-03-31031 March 1989 Insp Repts 50-454/89-07 & 50-455/89-10 on 890313-17 & 22. Violation Noted.Major Areas Inspected:Implementation of Inservice Testing,Including Administrative & Technical Procedures,Performance of Testing & Retention of Records IR 05000454/19890031989-03-23023 March 1989 Physical Security Insp Repts 50-454/89-03 & 50-455/89-05 on 890201-0303.Major Areas Inspected:Licensee Plans for Coping W/Strikes,Licensee Initial Implementation of Strike Plan & Return to Normal Security Operations IR 05000454/19890021989-03-0202 March 1989 Insp Repts 50-454/89-02 & 50-455/89-02 on 890123-0206.No Violations Noted.Major Areas Inspected:Implementation of Fire Protection Program.Weaknesses Noted in Control of Transient Combustible Matls & Control of Flammable Liquids IR 05000454/19890011989-02-28028 February 1989 Safety Insp Repts 50-454/89-01 & 50-455/89-01 on 890101- 0216.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup & Refueling & Spent Fuel Pit Activities.Util Identified Violation Noted IR 05000455/19890031989-02-27027 February 1989 Insp Rept 50-455/89-03 on 890118,24-26,31 & 0207,09,15 & 16. No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities,Including Programs,Procedures, Observation of Work Activities & Data Review IR 05000454/19880171988-10-19019 October 1988 Insp Rept 50-454/88-17 on 880914,20-22,27-29 & 1017.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Program (73051),procedures (73052) & Observation of Work activities(73753) ML20207N8801988-10-12012 October 1988 Insp Rept 50-454/88-19 on 880919-28.Violations Noted: Inadequate Procedures for Installation & Use of Tygon Tubing for RCS Level Indication.Major Areas Inspected:Loss of Train of RHR When Water Level in RCS Lowered on 880919 IR 05000454/19880161988-10-0505 October 1988 Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit Activities IR 05000454/19880181988-10-0303 October 1988 Insp Repts 50-454/88-18 & 50-455/88-16 on 880919-22.No Violations Noted.Major Areas Inspected:Action on Previously Identified Items,Emergency Plan Activations & Status of Emergency Preparedness Program.Two Open Items Identified IR 05000454/19880131988-09-13013 September 1988 Team Insp Repts 50-454/88-13 & 50-455/88-13 on 880801-12.No Violations Noted.Major Areas Inspected:Operation Radiation Protection,Radwaste Mgt & Nonradiological Chemistry Programs,Including Health Physics Organization IR 05000454/19880141988-08-29029 August 1988 Safety Insp Rept 50-454/88-14 on 880810-12.No Violations or Deviations Noted.Major Areas Inspected:Facility Mods Associated W/Snubber Reduction,Training & Licensee Action on Previous Insp Findings IR 05000454/19880111988-08-19019 August 1988 Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & Maint IR 05000454/19880101988-07-14014 July 1988 Partially Withheld Insp Repts 50-454/88-10 & 50-455/88-10 on 880623-0701 (Ref 10CFR73.21).No Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security,Security Program Audits,Testing & Maint & Communications IR 05000454/19880091988-07-11011 July 1988 Safety Insp Repts 50-454/88-09 & 50-455/88-09 on 880517- 0630.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletins,Generic Ltrs, Operations Summary,Training & Spent Fuel Storage Racks IR 05000454/19880071988-06-0101 June 1988 Safety Insp Repts 50-454/88-07 & 50-455/88-07 on 880401- 0516.Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Lers,Bulletins,Operations Summary, Engineering & Technical Support & QA Programs IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000454/19880061988-04-11011 April 1988 Safety Insp Repts 50-454/88-06 & 50-455/88-06 on 880212-0331.No Violations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Lers,Bulletins, Generic Ltrs,Operations Summary,Training & Surveillance IR 05000454/19880051988-03-28028 March 1988 Safety Insp Repts 50-454/88-05 & 50-455/88-04 on 880113-0317.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Startup Test Results Evaluation & Startup Test Results Verification IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface IR 05000454/19880031988-02-26026 February 1988 Insp Repts 50-454/88-03 & 50-455/88-03 on 880111-0217. Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Finding,Ser/Technical Evaluation Rept Commitment & Environ Qualification Program Compliance IR 05000454/19880021988-02-24024 February 1988 Safety Insp Repts 50-454/88-02 & 50-455/88-02 on 880101- 0211.Violation Noted.Major Areas Inspected:Previous Insp Findings,Lers,Operations Summary,Training,Surveillance,Maint & Operational Safety,Esf Sys Walkdown & Info Notices ML20147H3091988-01-14014 January 1988 Safety Insp Repts 50-454/87-27 & 50-455/87-25 on 870707-09 & 0820-21.Violations Noted.Major Areas Inspected:Previous Insp Findings,Observation of Maint Surveillance Activities & Training IR 05000454/19870441988-01-0808 January 1988 Insp Repts 50-454/87-44 & 50-455/87-42 on 871208-11.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Activities During Surveillance Outage,Including Organization & Mgt Control IR 05000454/19870431988-01-0808 January 1988 Insp Repts 50-454/87-43 & 50-455/87-40 on 871201-31.No Violations or Deviations Noted.Major Areas Inspected:Util Actions on Previous Insp Findings,Bulletins,Lers,Operations Summary,Training,Local Leak Rate Testing & Surveillance IR 05000454/19870421987-12-11011 December 1987 Insp Repts 50-454/87-42 & 50-455/87-39 on 871118-20,23 & 24. No Violations or Deviations Noted.Major Areas Inspected:Qa, Confirmatory Measurements for in-plant Radiochemical Analyses & Organizaton & Mgt Control IR 05000454/19870411987-12-0909 December 1987 Insp Repts 50-454/87-41 & 50-455/87-38 on 871031-1130.No Violation or Deviation Noted.Major Areas Inspected:Lers, Generic Ltrs,Operations Summary,Training,Surveillance,Maint, Operational Safety,Allegations & Mgt Changes IR 05000454/19870391987-11-19019 November 1987 Safety Insp Repts 50-454/87-39 & 50-455/87-36 on 871002-30. No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Operations Summary,Design Changes & Mods,Training & Surveillance IR 05000454/19870401987-11-0202 November 1987 Insp Repts 50-454/87-40 & 50-455/87-34 on 871013-15.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise,Including Key Functions & Locations During Exercise.Related Info Encl IR 05000454/19870381987-10-13013 October 1987 Insp Repts 50-454/87-38 & 50-455/87-35 on 870901-1001. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Operations Summary,Training, Surveillance,Maint,Operational Safety & Allegations IR 05000454/19870361987-09-23023 September 1987 Insp Repts 50-454/87-36 & 50-455/87-33 on 870831-0904.No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization,Training,Qa,Water Quality Control & Confirmatory Measurements IR 05000454/19870341987-09-21021 September 1987 Insp Repts 50-454/87-34 & 50-455/87-32 on 870824-0904.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection & Transportation Activities,Including Organization & Mgt Control IR 05000454/19870351987-09-14014 September 1987 Partially Withheld Physical Security Insp Repts 50-454/87-35 & 50-455/87-32 on 870817-21 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Review of Records & Repts,Keys & Combinations & Physical Barriers - Vital Areas IR 05000454/19870331987-09-10010 September 1987 Safety Insp Repts 50-454/87-33 & 50-455/87-31 on 870801-31. No Violations or Deviations Noted.Major Areas Inspected: Operations Summary,Training,Surveillance,Maint,Operational Safety & ESF Walkdown,Headquarters Request & Event Followup ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000454/19870301987-08-31031 August 1987 Special Fitness for Duty Program Insp Repts 50-454/87-30 & 50-455/87-28 on 870713-17.Major Areas Inspected:Policies, Procedures & Practices of Fitness Duty Program & Employee Assistance Program 1990-08-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers ML20199H8811999-01-19019 January 1999 Notice of Violation from Insp on 981124-990104.Violation Noted:From 871029 to 981123,test Controls for Stroke Time Testing of AFW Pump Discharge Valves Were Not Properly Established IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19983011998-11-0303 November 1998 NRC Operator Licensing Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) for Tests Administered on 980914-22.Out of Five License Applicants,One SRO Passed All Portions of Exam. Two RO & Two SRO Applicants Failed Portions of Exam IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20153D7701998-09-18018 September 1998 Notice of Violation from Insp on 980714-0824.Violation Noted:During 980616-18,AP 1100-3,Rev 11,inappropriate to Circumstances,In That Procedural Guidance Led to Belief That Main CR Ventilation Envelope Altered When CR Doors Opened ML20236W2081998-07-31031 July 1998 Notice of Violation from Insp on 980531-0713.Violation Noted:As of 980713,SF Storage Pool Design Would Not Have Prevented Inadvertent Draining Below 423 Feet 2 Inches IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0291998-06-29029 June 1998 Notice of Violation from Insp on 980407-0530.Violation Noted:On 980502,OOS 970012670 Not Sufficient to Isolate Equipment Being Worked on ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20248C0441998-05-28028 May 1998 Notice of Violation from Insp on 980403-27 & 0506.Violations Noted:Radiologically Posted Area Established for sodium-24 Used in Moisture Carryover Test Was Not Posted W/Sign Bearing Radiation Symbol & Listed Words IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20248B0931998-05-26026 May 1998 Notice of Violation from Insp on 980415-0508.Violation Noted:Ffd Program Was Not Appropriately Implemented ML20248C7271998-05-21021 May 1998 Errata to Notice of Violation from Insp on 980113-0223 W/Combined Violations ML20217Q9671998-05-0505 May 1998 Notice of Violation from Insp on 980224-0406.Violations Noted:Unit 1 Changed Operational Mode from Mode 5 to Mode 4 When Conditions for LCO of TS 3.4.6.1.b Were Not Met & Associated Action Required Shutdown within Specified Time ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8421998-03-27027 March 1998 Notice of Violation from Insp on 980120-0210.Violation Noted:On 960607,team Identified That Field Change Request (Fcr) 960062 Was Not Subjected to Design Control Measures Commensurate W/Measures Applied to Original Design ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance ML20217E5261998-03-26026 March 1998 Notice of Violation from Insp on 970919-980226.Violations Noted:Licensee Contracted Level II Liquid Penetrant Exam Examiner Incorrectly Performed Liquid Penetrant Exam of SG IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs ML20217D1031998-03-20020 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted: on 980306,chemistry Technician Failed to Close Valve V8 Before Withdrawing 2 Gas Samples from Panel for Hydrogen & Isotopic Analyses ML20248L8161998-03-16016 March 1998 Notice of Violation from Insp on 980113-0223.Violations Noted:On 980117,plant Administrative Procedure 330-1,section c.b.c.4,not Implemented & on 970910,licensee Operated Gwps Differently from Ufsar,Section 11.3.2.1 IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program 1999-09-08
[Table view] |
See also: IR 05000604/2007001
Text
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No.: 50-454/85025
Docket No.: 50-454 License No.: NPF-37
Licensee: Commonwealth ~ Edison Company
Post Office Box 767
Chicago, JL 60690
-Facility Name: Byron Station, Unit 1
Inspection at: Byron Station, Byron, IL
Inspection-Conducted: June 4.- July 1, 1985
Inspectors: J. M. Hinds, Jr.
K.'A. Connaughton
P. G. Brochman
Approved By: .' - - ---
Reactor Projects Section 1A Date
Inspection Summary
Inspection on June 4 - July 1, 1985 (Report No. 50-454/85025(DRP))
Areas Inspected: Routine, unannounced safety inspection by the resident
inspectors-of licensee action on previous ~ inspection findings; LERs;. location
of manual trip circuit in solid-state protection system; maintenance;
surveillance; operational safety; startup testing; Headquarters requests;
Region III requests; event followup; allegations; and other activities. The
~ inspection consisted of 137 inspector-hours onsite by 3 NRC inspectors
including 27 inspector-hours during off-shifts.
Results: Of the 11 areas inspected, no violations or deviations were
identified in 10 areas; one violation was identifed in the remaining area
(failure to perform Technical Specification Surveillances when reqired -
Paragraph 3.b). The violation' cites 2 instances of missed surveillances which
were required by Technical Specifications; however, examination of the strip
chart records indicated that the parameters were maintained within their
Technical-Specification limits at all times; therefore, the public health and
safety were not affected.
.
8507150374 850709
PDR ADOCK 05000454
G PDR
.
.
DETAILS
1. Persons Contacted
Commonwealth Edison Company
- T. Maiman, Manager of Projects
- R. Querio, Station Superintendent
- R. Pleniewicz, Assistant Superintendent Operations
- D. St. Clair, Technical Staff Supervisor
R. Chrazanowski, Security Administrator, Byron
- A. Chernick, Compliance Supervisor
H. Erickson, Master Mechanic
P. Johnson, Master Instrument Mechanic
- F. Hornbeak, Unit 2 Testing Supervisor
- R. Gruber, Quality Assurance
- A. Britton, Quality Assurance
H. Krist, Security Assistant
G. Buettner, Security Assistant
C. Kilbride, Technical Staff
M. Snow, Technical Staff
- J. Langan, Technical Staff Compliance
The inspectors also contacted and interviewed other licensee and
contractor personnel during the course of this inspection.
- Denotes those present at the exit interview on July 1, 1985.
2. Action On Previous Inspection Findings (92702)
a. (Closed) Violation (454/85009-03(DRP)): Failure to implement
administrative controls on overtime work for individuals who perform
safety related functions. The inspector reviewed the licensee's
training session on the control of overtime and interviewed
maintenance supervisors to verify their understanding of the
requirements for control of overtime.
b. (Closed) Violation (454/85016-03(DRP)): Failure to follow Technical
Specification Action Requirements. The inspector reviewed the
licensee's response to the 3 examples of violation and interviewed
licensed operators and licensed supervisory operators to verify
their understanding of the intent of Technical Specification Action
requirements which were exceeded.
3. Licensee Event Report (LER) Followup (90712 & 92700)
a. (Closed) LEP.s (454/85051-LL; 454/85052-LL; 454/85053-LL;
454/85054-LL; 454/85055-LL; 454/85056-LL; 454/85057-LL;
454/85058-LL; 454/85059-LL): An in-office review was conducted for
the following LERs to determine that the reporting requirements were
fulfilled, immediate corrective action was accomplished and
corrective action to prevent recurrence had been accomplished in
accordance with Technical Specifications.
2
. _ .
.
.
'LER No.- Title
~454/85051 Reactor Trip From Turbine Trip During
Presynchronization Checks
454/85052 Reactor Trip From 345KV Fault
454/85053 Reactor Trip Due to Instrument Power
Inverter Failure
~
454/85054 Reactor Trip Due to Low Lube Oil
Reservoir.
454/85055 Inoperability of Containment Isolation
Valves 1 RF026 and 1RF027
454/85056 Unanalyzed Condition Affecting Aux
Building Environment
454/85057 Missed Fire Watches Due to Aux Bldg
Airborne Activity
454/85058 Missed Hourly Fire Watch
454/85059 Hourly Fire Watch Delayed Due to
Security Computer Failure
Licensee installation of a temperature monitoring system to
automatically isolate the steam generator blowdown and auxiliiary
steam systens, per LER 85056, will be tracked as an open item
(454/85025-01(DRP)).
The events described in LERs 454/85051,454/85052,454/85053,and
454/85054 were reviewed in Inspection Report (454/85021(DRP)).
No violations or deviations were identified.
b. (Closed) LER (454/85050-LL): This LER described an qvent from
February 24 to May 5,1985, while in Mode 1. Technical
Specification 4.2.5 required that Indicated Reactor Coolant System
Average Temperature (T ) and Indicated Pressurizer Pressure (P
L be verified within theiE* limits of Table 3.2-1 at least once per P if)
hours. This is accomplished by performance of Byron Operating
Surveillance 1B0S 0.1-1,2,3, Step 6. The licensee identified in the
LER that this surveillance had not been performed since initial
entry into Mode 1 on February 24. During discussions with licensee
staff the inspector identified 2 discrepancies in the LER. The
cause of the surveillance not being performed was that the
verification was deleted when Revision 1 to IBOS 0.1-1,2,3 was
issued on March 28. Since the original version of IBOS 0.1-1,2,3
performed this sur~veillance, Technical Specification ' ,2.5 was only
exceeded after March 27.
3
i
-
,
.
.
Failure to perform surveillances within the required time interval
is an example of a violation (454/85025-02a(DRP)).
Technical Specification 4.0.4 required that entry into Mode 1 should
not be made unless Technical Specification Surveillance 4.2.5 had
been performed within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. T and P were not
a
verified within their limits prior to entry l8to ModPS on March 29
and April 3, 13, 16 and 21. These instances were not explicitly
identified in the LER.
Failure to perform a surveillance as required prior to entry in Mode
1 is an example of a violation (454/85025-02b(DRP)).
Since this event occured before the licensee presented their Conduct
of Operations Improvement Program (COIP), described in Inspection
Report (454/85021(DRP)), and the licensee took immediate corrective
action upon discovery of this problem; the inspectors have no
further concerns regarding this violation and it is considered
closed. The inspectors will follow up the COIP as part of the
permanant corrective action. The licensee agreed to revise the LER
to correct the 2 discrepancies and this will be followed as'an
unresolved item (454/85025-03(DRP)).
4. Inspection of the Location of the Manual Trip Circuit in Westinghouse
Designed Plants With a Solid State Protection System (SSPS) (25014)
a. Background
The effects of short-circuit failures of the output transistors in
the UV output circuit of the Westinghouse SSPS were highlighted in
recently issued Information Notice No. 85-18. A short-7ircuit
failure of the type described in the notice would prevent the
automatic tripping of the associated reactor trip breaker (RTB) on a
valid reactor trip demand.
During NRC review of this matter, another potential deficiency
involving the SSPS was discovered. Namely, the use of erroneous
controlled schematic diagrams of the SSPS at an operating facility.
Except for the drawings being used by the I&C technicians, the
controlled schematic diagrams of the SSPS being used in this
facility erroneously depicted the manual trip circuit for the RTBs
as being upstream of two particular output transistors. If such
were the case, and if one of the output transistors was shorted as
described in Information Notice 83-18, then the manual trip action
associated with the UV portion of the trip circuit would also be
ineffective.
Temporary Instruction TI 2500/14 was therefore issued to require NRC
inspector verification that the SSPS normal trip circuits were
downstream of the undervoltage output transistors and tilus the
manual undervoltage trip functions were not vulnerable to shorting
of the output transistors.
b. Inspection
4
. _-___
.
..
The inspector reviewed electrical drawings 6E-1-4030EF29, " Schematic
Diagram, Reactor Protection, Part-2, Train A," Revision D, dated
January 2,1985, and 6E-1-4030EF73, " Schematic Diagram Reactor
Protection Part-2 Train B," Revision D, dated January 2,1985.
These drawings correctly specified that the manual undervoltage trip
circuits were downstream of output transistors Q3 and Q4 on the
undervoltage driver cards.
To further verify that the foregoing schematics accurately reflected
the as-installed SSPS equipment the inspector contacted licensee
technical staff personnel and was provided with: an identical
schematic (applicable to both trains) from the Byron Station SSPS
vendor manual; Westinghouse Electric Corporation Instrumentation and
Control Drawings 2379A59 Sheet 6, Revision D and 2374A56 Sheet 9,
Revision AC; Drawing 6E-1-4114F, " External Wiring Diagram, Solid
State (RX&ESF) Protection System Cabinet, Train A (Logic Section)
Part 3 (IPA 09J)", Revision J, dated March 5, 1984; Drawing
6E-1-4052AA, " Internal-External Wiring Diagram MCB Reactor and
Chemical Volume Control Section B2, Part 11 (1PM05J)," Revision D,
dated September 3, 1982; Drawing 6E-1-4054P, " Internal-External
Wiring Diagram MCB Engineered Safety Features Section A2, Part 6
(1PM06J)," Revision E, dated May 10, 1983; Drawing 6E-2-4054P,
" Internal-External Wiring Diagram MCB Engineered Safety Features
Section A2 Part 2 (1PM06J)," Revision V, dated January 3, 1985, and;
Drawing 6E-1-4208B, " Internal-External Wiring Diagram Reactor Trip
Switchgear Cabinet 1RD05E," Revision K dated June 21, 1984.
The above listed wiring diagrams and drawings traced wiring from the
Undervoltage Output Cards, Pins 29 and 30, through the manual
reactor trip and manual safety injection control switches to the
termination points on the reactor trip switchgear cubical which were
connected to the undervoltage trip coil. Based upon review of the
foregoing " Approved for Use" design and construction drawings the
inspector concluded that the Byron Unit 1 SSPS was configured such
that shorting of output transistors Q3 and/or Q4 on the undervoltage
output card would not defeat the manual undervoltage reactor trip
function.
No violations or deviations were identified.
5. Monthly Surveillance Observation (61726)
The inspector observed technical specifications required surveillance
i testing on a Refueling Water Storage Tank Level Channel, the Reactor
Coolant Pump Bus Undervoltage Relays, and Component Cooling Pump 1CC01PA
and verified that testing was performed in accordance with adequate
procedures, that test instrumentation was calibrated, that limiting
conditions for operation were met, that removal and restoration of the
affected components were accomplished, that test results conformed with
technical specifications and procedure requirements and were reviewed by
personnel other than the individual directing the test, and that any
deficiencies identified during the testing were properly reviewed and
resolved by appropriate management personnel.
5
,
. \
No violations or deviations were identified.
6. Monthly Maintenance Observation (62703)
Station maintenance activities of safety related systems and components
listed below were observed / reviewed to ascertain that they were conducted
in acccordance with approved procedures, regulatory guides and industry
codes or standards and in conformance with technical specifications.
The following items were considered during this review: the limiting
conditions for operation were met while components or systems were
removed from service; approvals were obtained prior to initiating the
work; activities were accomplished'using approved procedures and were
inspected as applicable; functional testing and/or calibrations were
performed prior to returning components or systems to service; quality
controi records were maintained; activities were accomplished by
qualified personnel; parts and materials used were properly certified;
radiolooical controls were implemented; and, fire prevention controls
were implemented. Work' requests were reviewed to determine status of
outstanding jobs and to assure that priority is assigned to safety
related equipment maintenance which may affect system performance.
The following maintenance activities were observed / reviewed:
Replacement of Auxiliary Feedwater Flow Transmitter 1FT-AF016
Following completion of maintenance on the flow transmitter, the
inspector verified that these systems had been returned to service
properly.
No violations or deviations were identified.
7. Operational Safety Verification and Engineered Safety Features System
Walkdown (71707 & 71710)
The inspectors observed control room operation, reviewed applicable logs
and conducted discussions with control room operators during the month of
June 1985. During these discussions and observations, the inspectors
ascertained that the operators were alert, cognizant of plant conditions,
atttentive to changes in those conditions, and took prompt action when
appropriate. The inspectors verified the operability of selected
emergency systems, reviewed tagout records and verified proper return to
service of affected components. Tours of the auxiliary, turbine and
rad-waste buildings were conducted to observe plant equipment conditions,
including potential fire hazards, fluid leaks and excessive vibration and
to verify that maintenance requests had been initiated for equipment in
need of maintenance.
The inspectors observed plant housekeeping / cleanliness conditions and
verifed implementation of radiation protection controls. During the
mor.th of June 1985, the inspectors walked down the accessible portions of
the Diesel Generator and Safety Injection Systems to verify operability.
6
I
.
.
These reviews and observations were conducted to verify that facility
operations were in accordance with the requirements established under
technical specifications, 10 CFR and administrative procedures.
No violations or deviations were identified.
8. Startup Test Witnessing and Observation (72302)
The inspectors witnessed performance of portions of the following startup
test procedures in order to verify that testing was conducted in
accordance with the operating license and procedural requirements, test
data was properly recorded and performance of licensee personnel
conducting the tests demonstrated an understanding of assigned duties and
responsibilities.
2.47.31 -Power Coeficient Determination
2.47.32 Thermal Power Measurement
2.52.37 Load Swing Test
2.64.34 Large Load Reduction
No violations or deviations were identified.
9. Response to Headquarters Requests (92704)
The inspectors reviewed the licensee's response to Information Notice
84-06 in accordance.with Temporary Instruction 2515/67, Item 03.02b and
forwarded this information to the Regional Office. Submission of this
information and that of Item 03.02a,_ covered in Inspection Report
454/85021(DRP), completes all action required by this instruction.
10. Response to Region III Requests (92705)
The inspectors reviewed licensee files to determine the amount of
experience for senior station personnel in the following areas:
professional, utility, and nuclear plants and forwarded this-information
to the Regional Office.
11. Onsite Followup of Events at Operating Reactors (93702)
a. General
The inspector performed onsite followup activities for an event
which occurred during June 1985. This followup included reviews of
operating logs, procedures, Deviation Reports, Licensee Event
Reports (where available) and interviews with licensee personnel.
For the event, the inspector developed a chronology, reviewed the
functioning of safety systems required by plant conditions, reviewed
licensee actions to verify consistency with procedures, license
conditions and the nature of the event. Additionally the inspector
verified that licensee investigation had identified root causes of
equipment malft1ctions and/or personnel error and had taken
appropriate corrective actions prior to plant restart. Details of
the event and licensee corrective actions developed through
inspector followup are provided in Paragraph b below.
7
i
.
b. Reactor Trip on Low-Low Steam Generator Level on June 24, 1985
While in Mode 1 with reactor power at 98% the reactor tripped on
steam generator 1A low-low level when the 1C main feedwater pump
(MFP) (steam driven) was inadvertently tripped. Licensee personnel
manuallly ran back the turbine and started the 1A MFP (motor driven)
but were unable to maintain steam generator level.
Licensee's investigation determined that the 1C MFP trip was caused
by the microphone cord of an equipment operator's radio. This cord
became entangled with the MFP's overspeed test lever, causing the
test device to actuate.
Corrective action taken by the licensee included briefing operators
to exercise caution when working near the MFPs and the installation
of protective covers around the test levers. The licensee is also
evaluating other equipment for similar problems. Final review and
closure of this event will be accomplished in a subsequent
inspection after the LER is issued.
No violations or deviations were identified.
12. Allegations Provided by the Licensee Regarding Drug Use at Byron
a. Allegation 1: On June 17, 1985, the licensee' notified the inspector
of an allegation related to drug use. This allegation was verbally
received on June 16, 1985, by a corporate manager from a concerned
citizen at a social function. The citizen identified an employee at
the Byron Statin whom the alleger had reason to believe may be using
drugs off-site in a recreational manner. The corporate manager
relayed this information to the Byron Site Superintendent who
subsequently notified the inspector.
. Findings: In keeping with the licensee's drug awareness program, on
June 17, 1985, the individual was relieved of all duties at Byron
Station, his site security clearance was revoked and he was notified
of a review board to be convened on June 18, 1985. On June 18,
1985, a board consisting of Byron Station managers and union
representatives reviewed the allegation.with the individual. As a
result of the Board's evaluation and recommendations, the individual
was escorted to the Chicago General Office medical facility where
the individual was interviewed by a senior coordinator of the
Commonwealth Edison Employee Assistance Program (EAP). The
individual also submitted to an observed specimen urinalysis
following the interview. The test results of the urinalysis were
negative. Based on the negative test results, recommendations of
the EAP coordinator, and endorsement by the ccmpany physician, the
individual was restored to security status and returned to full duty
on June 20, 1985.
The licensee's management and supervisory personnel and the
inspectors have monitored the individual's performance and no
abnormal behavior during current work day observations have been
observed. This allegation is considered closed.
8
l
,
&
.
b. Allegation 2: On June 13, 1985, the licensee notified the
inspectors of an allegation related to alcohol and drug use at Byron
Station in parking lots and areas of the plant. This allegation was
received in the form of a telephone call on June 12, 1985, at 2100
to the Byron Site Security Administrator at his home. The caller
identified himself as a long time contractor employee and provided
sufficient detailed information to the Security Administrator to
establish reasonable creditability. The caller also identified 10
individuals, including some badge numbers-and three contractor
shops, whom he had reason to believe were using drugs and/or alcohol
in the south parking lot during the lunch period and implied certain
other site areas and times. The caller further stated that he may,
in the future,; elect to become further involved by coming forth with
additional specific information and revealing his identity pending
his first hand observations of the licensee's corrective measures to
resolve this issue. The licensee has had no further contact from
this individual as of the closing date of this report.
Findings: Based on the information received from the alleger, the
licensee contacted the 10 individuals identified and arranged for
them to report to the station security gate house at 1000 on June
20, 1985. At the gate house the individuals, together with union
representatives, were met by security officers and escorted to an
isolation area inside the gate house. Inside the gate house four
teams consisting of two CECO security managers each, began
individual interviews of the identified individuals. The interview
teams used a battery of questions designed to gain information from
the individuals related to the Byron Drug and Alcohol Abuse Policy
awareness, personal information, including type of work and
location, and to specifically address the use or sale of drugs or
alcohol on and off CECO property including observations or rumors of
the use or sale of drugs or alcohol at Byron.
Simultaneously with the interviews the licensee conducted meetings
with Project Construction Department (PCD), contractor supervisors,
and station supervisors. The purpose of these meetings was to
reitcrate the CECO position-as related to the Ceco Drug and Alcohol
Abuse Policy and to disseminate information, of a general nature,
concerning the allegations and the Byron Station corrective measures
to resolve these issues.
In addition, while the interviews were in progress, a search of the
plant was made. Three teams, each consisting of a handler and a
narcotics detection trained dog, made searches of a number of work
site areas'inside the plant buildings and other contractor
controlled work site buildings on the grounds inside the security
fence. The search areas included tool, equipment and material
storage boxes, field desks and lockers, and lunch areas. During the
search procedure, each team demonstrated the effectiveness of the
animal by hiding a drug sample and proving the dog could find it in '
both previously unsearched and searched areas.
9
. I
,,
.-
The_ inspectors participated in the dog team searches, the policy
meetings and the interviews. During the dog team searches no drugs
were detected in any of the areas searched.
The CECO interview teams are preparing a report on the interviews
and will provide a copy of the report to the inspectors. This
allegation is an unresolved item pending the inspectors receipt and
review of-the interview team report (454/85025-04(DRP)).
13. Presentation of Licenses to Reactor Operators
On June 28, 1985, Messrs. E. Greenman, Deputy Director, Reactor Projects
Division; L. Reyes, Chief, Reactor Safety Operations Branch; R. Warnick,
Chief, Reactor Projects Branch 1; and J. Hinds, Senior Resident
Inspector, Byron, presented licenses to reactor operators for Byron Unit
1.
14. Open Items
Open items are matters which have been discussed with the licensee, which
vi D reviewed further by the inspector, and which involve some action
c part of the NRC or licensee or both. An open item disclosed
dui the_ inspection is discussed in Paragraph 3.a.
15. Unresolved Items
Unresolved items are matters about which more information is required in
order to ascertain whether they are acceptable items, violations or
~
deviations. Unresolved items disclosed during the inspection are
discussed in Paragraphs 3.b and 12.b.
16. Exit interview (30703)
The inspectors met with licensee representatives denoted in Paragraph 1
at the conclusion of the inspection on July 1, 1985. The inspectors
summarized the purpose and scope of the inspection and the findings. The
inspectors also discussed the likely informational content of the
inspection report with regard to documents or processes reviewed by the
inspectors during the inspection. The licensee did not identify any such
documents / processes as proprietary.
10