Forwards Description of Test Program Verifying Reliability of Undervoltage Trip Attachment on Westinghouse DS-416 Breakers.Submittal Satisfies License Condition 2.C(12)a. NRC Timely Review Requested
ML20071N916
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 06/03/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8306070283
Download: ML20071N916 (3)


Text

.s 3 DUKE POWER GOMPANY P.O. Box 33;80 Cl!AHLO1 TE. N.C. 28242 IIAL II. TUCKER TELEPHONE vnos passionww (704) 373-4531

.mmm .""""

June 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Attached is a description of the test program to verify the reliability of the undervoltage trip attachment (UVTA) on Westinghouse DS-416 breakers.

This testing will be conducted on multiple UVTAs installed in a breaker.

Detailed testing procedures are being finalized by Westinghouse in conjunction with Duke Power and other utilities. This testing program is scheduled to begin within the next several weeks; therefore, timely Staff review is requested.

By submittal of this information, Duke Power Company considers that condition number 2.C.(12)a. in License NPF-17 (Unit 2-FOL) is satisfied. Please advise if there are any questions regarding this matter.

Very truly yours,

  1. B.hkp,fi/

Hal B. Tucker GAC/php Attachment cc Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station 8306070283 830603 /'

PDR ADDCK 05000369 P pm

mm DS-416 Undervoltage Trip Attachment Reliability Testing Program 1.0 OBJECTIVE 1.1 Define the undervoltage trip attachment (UVTA) service life.

1.2 Develop data to substantiate appropriate periodic test requirements during plant operation.

2.0 GOALS 2.1 Perform testing of sufficient devices to assess the potential performance degradation and associated service life failure mechanism characteristics for the undervoltage attachment.

2.2 Identify

2.3.1 The quantifiable margin throughout service life in the UVTA/ breaker trip forces.

2.3.2 Adequate measures of breaker trip performance and indicators of performance degradation.

2.3.3 Adequacy of present maintenance instructions for ensuring reliable operation of the UVTA for recommended service life.

2.3.4 Quantitative data for cyclic life effects upon the UVTA and recommended replacement intervals, if appropriate, as determined by test survival rates.

3.0 EVALUATION PROCESS l 3.1 Specification of program objectives j 3.2 Specification of test and analysis requirements I 3.3 Testing and analysis of data 3.4 Compilation of testing and analysis against program objectives maintenance program recommendations I

I l

e ,

4.0 TESTING AND ANALYSES PRINCIPLES 4.1 Documentation shall be provided for evaluations and recommendations determined through either testing or analysis of areas under investigation.

4 .,2 The number of operations specified in the procedure shall be determined to adequately evaluate expected service life / replacement life.

4.3 Testing shall be performed upon a sample set of undervoltage trip attachments. A controlled undervoltage trip attachment from that set shall be kept and maintained for comparison purposes after completion of 'the testing.

4.4 The undervoltage trip attachments shall be installed in accordance with present installation procedures in the factory as-received condition.

4.5 The following baseline measurements / inspections of the test under-voltage trip attachments and test circuit breakers shall be taken and recorded:

4.5.1 Electrical resistance of the coil.

4.5.2 Breaker response time for undervoltage trip.

4.5.3 Clearance between undervoltage trip attachment to trip shaft.  ;

4.5.4 Measurements of the force that the undervoltage attachments deliver.

4.5.5 Verification of proper operation of roller bearing on UVTA.

4.6 Periodic maintenance shall be performed on a frequency during the test that is approximately consistent with times that are expected for a normal fuel cycle.