ML20071C391: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(No difference)

Latest revision as of 02:23, 27 March 2020

Application for Amend to App a of License DPR-28 Revising Tech Spec Pages 190-a,192 & 193 Re Change in Title of Shift Technical Advisors to Shift Engineers
ML20071C391
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/28/1983
From: Heider L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20071C392 List:
References
FVY-83-14, NUDOCS 8303020025
Download: ML20071C391 (2)


Text

. _ _ _ _ . _ _ . _

l MERMONT YANKEE NUCLEAR POWER CORPORATION PROPOSED CHANGE NO. 112 I

, 2.C.15.1

.- RD S, Box 169 Ferry Road, Brattleboro, VT 05301 nrPtv ro:

y .

Februa ry 28, 1983 ENGINEERING OFFICE 1671 WORCESTER ROAD

  • FRAMINGHAM, MASSACHUSETTS 01701 TELEPHONE 617-872-8100 United States Nuclear Regulatory Commission 68 Yl Washington, D. C. 20555 Attention: Office of Nuclear Reactor Regulation Ref e re nces: (a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, USNRC to VYNPC, NVY 82-169, dated October 5,1982 (c) Ictter, USNRC to All Operating Nuclear Power Plants, dated October 30, 1979 (d) Letter, VYNPC to USNRC, FVY 82-118, dated November 12, 1982 (e) Letter, USNRC to VYNPC, NVY 83-9, dated January 26, 1983

Subject:

Organizational Chart Update; Shif t Technical Advisor Dea r Sir:

Pursuant to Section 50.59 of the Commission's Rules and Regulations, Vermont Yankee Nuclear Power Corporation hereby proposes the f ollowing modifications to Appendix A of the Operating License.

PROPOSED CHANGE The change involves a revision of pages 190-a, 192, and 193 of the Vermont Yankee Technical Specifications. The revision to pages 190 a, 192, and 193 simply reflects a change in the title of the Shif t Technical Advisors to Shif t Engi nee rs. The revision to page 192 additionally reflects a change in the reporting line of the Shif t Engineer to the Operations Shif t Supervisor.

REASON FOR CHANGE This change is prompted by the events described in Reference (b), as well as an internal assessment of the current Shif t Technical Advisor (STA) program. 'Ihe conclusion of both reports is that the STA f unction must be f ully integrated with the operating crew. The method selected for achieving this objective is to transfer administrative responsibility for the STA program f rom the Technical Services Superintendent to the Operations Department, as allowed by Reference (c).

SAFETY CONSIDERATION This proposed change is admf uistrative in nature and has no safety or environmental significance.

r30302OO25 830228 \

PDR ADOCK 05000271 0'0 k

\f h

United States Nuclear Regulatory Commission February 28, 1983 Attention: Office of Nuclear Reactor Regulation Page 2 This proposed change has been reviewed by the Vermont Yankee Nuclear Safety Audit and Review Committee.

FEE DETERMINATION This change is pro forma, administrative in nature, and has no safety or environmental significance. For these reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class 11 amendment which requires a fee payment of $1,200.00. A check in the amount of $1,200.00 is enclosed.

SCHEDULE OF CHANGE Approval of this change is requested by April 22, 1983, which is the expected startup date following our 1983 ref ueling outage.

We trust you will find this information satisfactory; however, should you desire additional information, feel free to contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION s, phak' L. H. Heider Vice President JBS/dd COMMONWEALTH OF MASSACHUSETTS)

)ss MIDDLESEX COUNTY )

Then personally appeared before me, L. H. Heider, who, being duly sworn, did state that he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing reauest in the name and on the behalf of Vermont Yankee Nuclear Power Corporation and that the statements therein are true to the best of his knowledge and belief.

%. 6. L A '

(fl. B. Sinclair Nota ry Public My Commission Expires , June 1,1984

. .U..I h.h.\

L cra.

nn e

B :

2 QGW, \h a '

\.~

id,5..t.5.@p)Eio

.se ts l Tjpy -

_