ML20071C383: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(No difference)

Latest revision as of 02:24, 27 March 2020

Application for Amend to License DPR-59,revising App a Tech Specs to Renumber Mechanical Snubbers for Clarity,Add Sixteenth Snubber,Per IE Bulletin 81-01 & Change Emergency Preparedness Audit Frequencies
ML20071C383
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/25/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20071C376 List:
References
IEB-81-01, IEB-81-1, NUDOCS 8303020015
Download: ML20071C383 (2)


Text

-_ . _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ . _ _ _ _

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the matter of )

POWER AUTHORITY OF THE STATE OF NEW YORK ) Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the Power Author,ity of the State of New'mork, as holder of Facility Operating License No. DPR-59, hereby applies for an Amendment to the Technical Specifications contained in Appendix A of this license.

This proposed amendment of the James A. FitzPatrick Nuclear Power Plant Facility Operating License seeks to amend several different portions of Appendix A. A change to Table 3.6-lb (page 156r, " Safety Related Mechanical Snubbers,") includes a minor renumbering of these snubbers for clarity and the addition of a sixteenth snubber. This constitutes a change committed to regarding I.E. Bulletin No. 81-01.

Figure 6.2-1, " Plant Staff Organization" on page 260 is updated to more clearly illustrate the Security and Safety Superintendent's performance and monitoring functions regarding the FitzPatrick fire protection program. On the same figure, the Training Coordinator's title is changed to reflect the exsisting organization structure.

Section 4.11.B (page 239, " Crescent Area Ventilation") is revised to require that unit coolers serving ECCS components are checked for operability once per three months, rather than during the surveillance testing of the associated pumps, as currently required.

In Section 6.5.2.8(e) on page 252a, the audit frequencies for emergency preparedness and safeguards contingency plans are revised to agree with the requirements of parts 73.40(d) and 50.54 (t),

respectively, of Title 10 of the Code-of Federal Regulations.

F303020015 830225 PDR ADCCK 05000333 P PDR

.3, _x 6 ,!

}-

6 i s s

s

'2 , .

Ii < s/

The proposed changerz to the Technical Specifications are X ,

presented in

Attachment:

I to this application. . The Safety  ; ,

Evaluation corresponding to this change is included in Attachment II.

\,

POWER AUTHORITY OF THE STATE OF NEW YORK -

i BY

! _ Y 3 ct.d #

JgP._BayneExecutiveVic(ePresident r - Nuclear Generation State of New York . . ,

County of Westchester -

Subscribed end Sworn to.'before pHaa. ViaNSTEIN me thia ff ~## day. of /cVAggy, /ff;f .Notry P Mc 11%(jew 7 Yo*

hl/LLlLU'k fl4L cc m $ Y Y $' ' "U Not,ary/Public L

j

/ ,

1

\ ,

l 4 w k'

e 4

\

I s.

I

., j l

- )

3

,\ "

1

'