EPID:L-2018-LLR-0088, Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals (Approved, Closed) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML23354A0032024-01-19019 January 2024 Authorization and Safety Evaluation for Alternative Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) NMP2L2777, Relief Request Associated with Excess Flow Check Valves2021-09-0808 September 2021 Relief Request Associated with Excess Flow Check Valves ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML20294A4242020-10-20020 October 2020 Acceptance of Requested Licensing Action Relief Requests CTNSP-PR-01 and CS-PR-01 (EPIDs L-2020-LLR-0136 and L-2020-LLR-0137) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19046A1142019-02-25025 February 2019 Issuance of Relief Requests 154-04 and 14R-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18334A2362018-12-21021 December 2018 Alternative to the Requirements of the ASME Code ML18332A0422018-12-12012 December 2018 Issuance of Relief Requests I5R-04 and I4R-04 Use of ASME Code Case N-513-4 in Lieu of Specific ASME Code Requirements ML18318A4222018-12-10010 December 2018 Issuance of Relief Request Use of ASME Code Case OMN-13 in Lieu of Specific ASME Code Requirements ML18275A1392018-11-13013 November 2018 Relief from the Requirements of the ASME Code (EPID L-2017-LLR-0145 Through EPID L-2017-LLR-0152) NMP1L3226, Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals2018-06-0808 June 2018 Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17331A1812017-12-0505 December 2017 Alternative to the Requirements of the American Society of Mechanical Engineers Code (CAC Nos. MF9381 and MF9382; EPID L-2017-LLR-0015) ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17136A1122017-05-30030 May 2017 Alternative to the Requirements of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants NMP1L3146, Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J2017-04-0606 April 2017 Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML16071A2332016-04-29029 April 2016 Relief Request Alternative Use of Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML13290A1722013-10-24024 October 2013 Relief from the Requirements of the ASME Code Request Number 2lSl-011, Rev. 00, Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for Implementation of a Risk-Informed, Safety-Base ML13052A3732013-03-15015 March 2013 ME5789-Authorization of Relief Request 1ISI-004, Revision 1 (NMP1 Relief Request) ML13084A2442013-03-14014 March 2013 Response to Request for Review of Draft NRC Safety Evaluation, Relief from Requirements of ASME Code, Section XI, Request No. 1ISI-004, Revision 1, Repair of Control Rod Drive Housing Penetrations ML12166A2692012-06-22022 June 2012 ME8534-Authorization of Relief Request No. RR-PTRR-02, Revision 1,Recirc Pump Seals Replacement ML1109503072011-03-25025 March 2011 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation ML1007000342010-03-15015 March 2010 Request for Alternative 1ISI-003, Request to Use ASME Code Case N-716 Associated with the Fourth 10-year Inservice Inspection Interval ML0926300072009-09-23023 September 2009 Request for Alternative No. MSS-VR-02 Main Steam Safety Relief Valve Test Interval Extension ML0919804542009-08-0303 August 2009 Request to Utilize Alternative of Applying ASME Code Case 730 for Repair and ISI of Control Rod Drive Bottom Head Penetrations for the License Renewal Period of Extended Operation ML0831904942008-12-0101 December 2008 Relief Request 2ISI-007 and 2ISI-009 for Third 10-Year ISI Interval ML0633204612006-11-16016 November 2006 Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds ML0332400602003-11-21021 November 2003 Relief, Approval of Alternative Regarding Dissimilar Metal Welds ML0312200272003-05-0606 May 2003 Authorization of Alternative, Inservice Inspection (ISI) Relief Request ISI-23B, TAC MB5732 2024-01-19
[Table view] Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Safety Evaluation
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML23156A6832023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-14 ML23156A6822023-06-22022 June 2023 Authorization and Safety Evaluation of Alternative Relief Request I5R-11 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23103A1912023-04-20020 April 2023 Request for Threshold Determination Under 10 CFR 50.80 ML23082A3502023-04-17017 April 2023 Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing ML23094A1422023-04-0505 April 2023 Approval of Alternative Request I5R-13 to Utilize Specific Provisions of Code Case N-716-3 ML23025A4122023-02-28028 February 2023 Issuance of Amendment No. 248 to Revise Alternative Source Term Calculation for Main Steam Isolation Valve Leakage and Non-MSIV Leakage ML22339A0582022-12-21021 December 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22061A0402022-03-11011 March 2022 Relief Request Associated with Excess Flow Check Valves ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21256A1792021-11-0202 November 2021 Issuance of Amendment No. 246 Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21140A1532021-06-0303 June 2021 Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval ML21082A2212021-04-29029 April 2021 Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML21109A2162021-04-22022 April 2021 Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Interval ML21105A3382021-04-22022 April 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component Welds ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21049A0242021-02-23023 February 2021 Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check Valves ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20241A1902020-10-20020 October 2020 Issuance of Amendment No. 182 to Change Allowable Main Steam Isolation Valve Leak Rates ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20141L0532020-06-0202 June 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19301B0052019-11-25025 November 2019 Issuance of Amendment No. 239 Administrative Edits to the Technical Specifications ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques 2023-08-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 February 25, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 -ISSUANCE OF RELIEF REQUESTS 15R-06 AND 14R-06 RE: USE OF ENCODED PHASED ARRAY ULTRASONIC EXAMINATION TECHNIQUES IN LIEU OF RADIOGRAPHY (EPID L-2018-LLR-0088)
Dear Mr. Hanson:
By letter dated June 8, 2018 (Agencywide Documents Access and Management System Accession No. ML18159A059), Exelon Generation Company, LLC (Exelon or the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of alternatives to certain American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code, Section XI requirements at Nine Mile Point Nuclear Station (Nine Mile Point), Units 1 and 2. The purpose of this letter is to provide the results of the NRC staff's review of Relief Requests 15R-06 and 14R-06. The NRC staff will provide separate correspondence regarding the other relief requests in the letter dated June 8, 2018. Pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR) 50.55a(z)( 1 ), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety. In Relief Requests 15R-06 and 14R-06, the licensee proposed to use encoded phased array ultrasonic testing in lieu of radiographic testing for ferritic piping butt welds during repair and replacement activities at both facilities on the basis that it would provide an acceptable level of quality and safety. The NRC staff has reviewed the subject requests and concludes, as set forth in the enclosed safety evaluation, that Exelon has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)( 1 ). The proposed alternative would use encoded phrased array ultrasonic testing in lieu of radiographic testing, which would provide an acceptable level of quality and safety. Therefore, the NRC staff authorizes the use of Relief Request 15R-06 for Nine Mile Point, Unit 1, and Relief Request 14R-06 for Nine Mile Point, Unit 2, for the duration of the applicable 10-year inservice inspection intervals listed in the table in Section 3.1.2 of the enclosed safety evaluation.
B. Hanson All other ASME Code requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions, please contact the Nine Mile Point Nuclear Station Project Manager, Michael Marshall, at (301) 415-2871 or Michael.Marshall@nrc.gov.
Docket Nos. 50-220 and 50-410
Enclosure:
Safety Evaluation cc: Listserv Sincerely, ( -. rt:~) *~ Ja es G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO RELIEF REQUESTS 15R-06 AND 14R-06 NINE MILE POINT NUCLEAR STATION, LLC EXELON GENERATION COMPANY, LLC NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-220 AND 50-410
1.0 INTRODUCTION
By application dated June 8, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18159A059), Exelon Generation Company, LLC (the licensee) submitted Relief Request 15R-06 for Nine Mile Point Nuclear Station (Nine Mile Point), Unit 1, and Relief Request 14R-06 for Nine Mile Point, Unit 2, in accordance with Title 10 of the Code of Federal Regulations 50.55a(z)(1
). Specifically, Relief Requests 15R-06 and 14R-06 would allow the licensee to use encoded phased array ultrasonic testing (PAUT) in lieu of radiographic testing (RT) required by the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (B&PV Code) for ferritic piping butt welds during repair and replacement activities at both facilities.
Pursuant to 10 CFR 50.55a(z)(1
), the licensee requested to use the alternative on the basis that it will provide an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(g)(4) state, in part, that ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements set forth in Section XI of the applicable editions and addenda of the ASME B&PV Code, to the extent practical, within the limitations of design, geometry, and materials of construction of the components.
Additionally, 10 CFR 50.55a(b )(2)(xx)(B) requires, in part, that the nondestructive examination provision in paragraph IWA-4540(a)(2) of the 2002 Addenda of the ASME B&PV Code, Section XI, must be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing on a pressure retaining boundary.
The regulations in 1 O CFR 50.55a(z) state, in part, that alternatives to the requirements in paragraphs (b) through (h) of 10 CFR 50.55a may be authorized by the NRC if the licensee demonstrates that: (1) the proposed alternative provides an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety.
Enclosure 3.0 3.1 TECHNICAL EVALUATION Licensee's Relief Request 3.1.1 ASME Code Components Affected For Nine Mile Point, Units 1 and 2, the proposed alternative is for all ferritic piping butt welds that require radiography during repair and replacement activities in accordance with the ASME B&PV Code, Section XI. 3.1.2 Applicable Code Edition and Addenda The licensee identified the applicable ASME B&PV Code editions and addenda for Nine Mile Point, Units 1 and 2, as shown in the table below. In addition, the table shows the applicable 10-year inservice inspection (ISi) interval, including the start and end dates. PLANT ISi ASMECODE START END INTERVAL EDITION Nine Mile Point, Unit 1 5th 2013 Edition 8/23/2019 8/22/2029 Nine Mile Point, Unit 2 4th 2013 Edition 8/23/2018 8/22/2028 3.1.3 Applicable Code Requirement The licensee has proposed an alternative to the requirements in paragraphs IWA-4221 and IWA-4540(a)(2) of the ASME B&PV Code, Section XI. Subarticle IWA-4200 of the ASME B&PV Code, Section XI, covers repair and replacement activities, and paragrap_h IWA-4221 requires that when the licensee replaces an existing item, the replacement shall meet the requirements of the construction code to which the original item was constructed.
As stated previously, 10 CFR 50.55a(b)(2)(xx)(B) requires that the nondestructive examination provision in paragraph IWA-4540(a)(2) of the 2002 Addenda of the ASME B&PV Code, Section XI, must be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing on a pressure retaining boundary.
Paragraph IWA-4540(a)(2) of the 2002 Addenda of the ASME B&PV Code, Section XI, requires that the nondestructive examination method and acceptance criteria of the 1992 or later editions of the ASME B&PV Code, Section Ill, be met prior to returning the component to service in order to perform a system leakage test in lieu of a system hydrostatic test. The examination requirements for circumferential butt welds are contained in subarticles NB-5200, NC-5200, and ND-5200 of the ASME B&PV Code, Section Ill. The acceptance standards for radiographic examination are specified in subarticles NB-5300, NC-5300, and ND-5300 of the ASME B&PV Code, Section Ill. 3.1.4 Licensee's Proposed Alternative and Basis for Use The licensee is proposing the use of encoded PAUT in lieu of the ASME B&PV Code-required RT for ferritic piping repair and replacement welds at Nine Mile Point, Units 1 and 2. The proposed alternative includes a qualification program that is based on ASME Code Case N-831, "Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic Pipe," approved by the ASME Section XI Standards Committee on October 20, 2016. The differences between the proposed alternative and Code Case N-831 were limited to editorial changes that clarified the wording. The encoded PAUT procedures, equipment, and personnel will be qualified using performance demonstration testing. The flaw acceptance standards for the PAUT examinations will consider all flaws to be planar, and they are evaluated against the preservice acceptance standards of subarticles IWB-3400, IWC-3400, and IWD-3400 of the ASME B&PV Code, Section XI, for ASME Code Class 1, 2, and 3 welds, respectively.
The licensee states that the basis for the proposed alternative is that encoded PAUT is equivalent or superior to RT for detecting and sizing planar flaws. The examination procedure and personnel performing examinations are qualified via performance demonstration testing using representative piping conditions and flaws that demonstrate the ability to detect and size flaws that are both acceptable and unacceptable to the defined acceptance standards.
The licensee also states that ultrasonic testing (UT) techniques are being used throughout the nuclear industry for examination of dissimilar metal welds and overlaid welds, as well as other applications, including piping replacements covered under ASME B31.1, "Power Piping, ASME Code for Pressure Piping, B31." 3.1.5 Duration of Proposed Alternative The licensee requested that the proposed alternative be applied for the duration of the fifth 10-year ISi at Nine Mile Point, Unit 1, and the duration of the fourth 10-year ISi at Nine Mile Point, Unit 2. 3.2 NRC Staff's Evaluation The licensee is proposing the use of encoded PAUT in lieu of the ASME B&PV Code-required RT for ferritic piping repair and replacement welds for the duration of each facility's 10-year ISi intervals, as shown in the table above. UT and RT are volumetric inspection techniques that are commonly used to inspect welds in nuclear power plants and in other industries.
Ultrasonic examinations differ from radiographic examinations, as they use different physical mechanisms to detect and characterize discontinuities.
These differences in physical mechanisms result in several key differences in sensitivity and discrimination capability.
The NRC staff has been assessing the effectiveness of the use of ultrasound in lieu of radiography through literature reviews, detailed evaluations of previous relief requests and proposed alternatives, and confirmatory experimental work to validate findings.
An assessment of the use of UT in lieu of RT is described in an NRC report, NUREG/CR-7204, "Applying Ultrasonic Testing In Lieu of Radiography for Volumetric Examination of Carbon Steel Piping," published September 2015 (ADAMS Accession No. ML15253A674).
This report included evaluation on the use of UT in lieu of RT for welded pipes and plates with thicknesses ranging from 0.844 inches to 2.2 inches. NUREG/CR-7204 concludes, in part: Considering overall detections/non-detections for the piping specimens, as well as the Navy plates, it appears that PA-UT, based on the techniques applied in this study, provides an equally effective examination for identifying the presence of fabrication flaws in carbon steel welds. The PA-UT parameters applied were shown to be more effective for planar flaws, but slightly less effective for small volumetric flaws, than RT. Based on the assessment described in NUREG/CR-7204, the NRC staff finds that there is a sufficient technical basis for the use of UT in lieu of RT for ferritic steel welds. Given that UT can be effective, the staff considered whether the proposed alternative applies UT in a way that provides reasonable assurance of finding structurally-significant flaws. Important aspects of the licensee's proposed alternative include:
- The examination volume shall include 100 percent of the weld volume and the weld-to-base-metal interface.
- The electronic data files for the PAUT examinations will be stored as archival-quality records. In addition, hard copy prints of the data will also be included as part of the PAUT examination records to allow viewing without the use of hardware or software.
- Ultrasonic examination procedures shall be qualified by using either a blind or a non-blind performance demonstration using a minimum of 30 flaws covering a range of sizes, positions, orientations, and types of fabrication flaws. The demonstration set shall include specimens to represent the minimum and maximum diameter and thickness covered by the procedure.
- The flaw through-wall heights for the performance demonstration testing shall be based on the applicable acceptance standards for volumetric examination in accordance with subarticles IWB-3400, IWC-3400, or IWD-3400 of the ASME B&PV Code, Section XI. At least 30 percent of the flaws shall be classified as acceptable planar flaws, with the smallest flaws being at least 50 percent of the maximum allowable size based on the applicable aspect ratio for the flaw.
- Ultrasonic examination personnel shall demonstrate their capability to detect and size flaws by performance demonstration using the qualified procedure.
The demonstration specimen set shall contain at least 10 flaws covering a range of sizes, positions, orientations, and types of fabrication flaws.
- All flaws detected using angle-beam ultrasonic inspections will be treated as planar flaws and will be evaluated against the preservice acceptance standards in subarticles IWB-3400, IWC-3400, and IWD-3400 of the ASME B&PV Code, Section XI, for ASME Code Class 1, 2, and 3 welds, respectively.
In the previous Nine Mile Point, Units 1 and 2, 10-year ISi intervals, the NRC staff had authorized an alternative for each unit, which included the provisions listed above. 1 The staff finds that the use of performance demonstration for personnel and procedure qualification and the use of encoded data provide assurance that the PAUT methods will be sufficiently rigorous to detect and size flaws in the repair/replacement welds. Without this alternative, the licensee would be required to use the radiographic acceptance standards in Section Ill of the ASME B&PV Code. Section Ill also provides ultrasonic 1 The NRC authorized a similar alternative for the Exelon Generation Company, LLC fleet, which included Nine Mile Point Nuclear Station, Units 1 and 2, by letter dated June 5, 2017 (ADAMS Accession No. ML17150A091
). acceptance standards; however, the licensee has requested to use the preservice acceptance standards in Section XI of the ASME B&PV Code as an alternative.
The Section Ill radiographic and ultrasonic acceptance standards (subarticles NB-5300, NC-5300, and ND-5300) require the inspector to detect and determine the type of flaw (e.g., porosity, lack of fusion, slag, incomplete penetration).
While RT is effective at discerning between different flaw types, it is less capable than UT at detecting planar flaws such as cracks and lack-of-fusion defects. While subarticles IWB-3400, IWC-3400, and IWD-3400 of Section XI allow larger flaws than paragraphs NB-5330, NC-5330, and ND-5330 of Section Ill, the use of Section XI acceptance standards has proven effective for ISi of piping welds. The NRC staff finds that the use of the ASME B&PV Code, Section XI, preservice acceptance standards is appropriate for the proposed alternative, as the alternative is for repair and replacement activities, not new plant construction, and industry experience with Section XI acceptance standards has demonstrated their effectiveness.
Based on the inspection and qualification requirements described in the proposed alternative, and the results of NUREG/CR-7204, the NRC staff has reasonable assurance that the use of encoded PAUT, qualified as proposed by the licensee, for the repair and replacement of ferritic piping welds will provide an adequate level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff determined that the licensee's proposed alternative to use encoded PAUT in lieu of RT provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 1 O CFR 50.55a(z)( 1 ). Therefore, the NRC staff authorizes the use of Relief Request 15R-06 for Nine Mile Point, Unit 1, and Relief Request 14R-06 for Nine Mile Point, Unit 2, for the duration of the applicable 10-year ISi intervals listed in the table in Section 3.1.2 of this safety evaluation.
All other ASME Code requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor:
Keith Hoffman Date:february 25, 2019 B. Hanson
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 -ISSUANCE OF RELIEF REQUESTS ISR-06 AND 14R-06 RE: USE OF ENCODED PHASED ARRAY ULTRASONIC EXAMINATION TECHNIQUES IN LIEU OF RADIOGRAPHY (EPID L-2018-LLR-0088)
DATED FEBRUARY 25, 2019 DISTRIBUTION:
PUBLIC PM File Copy RidsNrrDorlLpl 1 RidsRgn1 MailCenter RidsNrrLALRonewicz RidsNrrPMNineMilePoint RidsNrrDmlrMphb KHoffman, NRR ADAMS A ccess1on N ML19046A114 o.: OFFICE DORL/LPL 1/PM DORL/LPL 1 /LA NAME MMarshall LRonewicz DATE 02/21/2019 02/21/2019
- b f >v sa ety eva uat1on d d ate DMLR/MPHB/BC*
DORL/LPL 1 /BC DORL/LPL 1 /PM SRuffin Joanna MMarshall 01/17/2019 02/25/2019 02/25/2019 OFFICIAL RECORD COPY