ML18318A014

From kanterella
Revision as of 19:52, 14 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Correction to Amendment Nos. 326 and 304 Add Risk-Informed Completion Time Program
ML18318A014
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/30/2018
From: Marshall M
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Marshall M, NRR/DORL/LPLI, 415-2871
References
EPID L-2016-LLA-0001
Download: ML18318A014 (25)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 November 30, 2018

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -CORRECTION TO AMENDMENT NOS. 326 AND 304 RE: ADD RISK-INFORMED COMPLETION TIME PROGRAM (EPID L-2016-LLA-0001)

Dear Mr. Hanson:

By letter dated October 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 326 to Renewed Facility Operating License No. DPR-53 and Amendment No. 304 to Renewed Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2, respectively.

The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 25, 2016, as supplemented by letters dated April 3, 2017, and January 11, January 18, June 21, and August 27, 2018. The amendments revised the Calvert Cliffs, Units 1 and 2, TSs related to completion times for required actions to provide the option to calculate longer risk-informed completion times. The amendments also added a new program, the "Risk-Informed Completion Time Program," to TS Section 5.5, "Programs and Manuals." Subsequent to issuance of the amendments, the NRC staff was notified by Exelon Generation Company, LLC of (1) two errors that had been identified in the Safety Evaluation (SE) and (2) an indication that in several of the updated TS pages, change bars were not placed consistent with prior Calvert Cliffs TS change bar usage. Safety Evaluation Corrections:

1. On page 7, "TS 3.5.2, Condition C -One or more containment air locks inoperable for reasons other than Conditions A or 8, Required Action C.3," TS 3.5.2 should be corrected to TS 3.6.2. 2. On page 8, "TS 3.8.9, Condition A -One or more AC electrical power distribution subsystems inoperable," is missing the "Required Action A.1," at the end of the sentence.

The NRC staff has determined that these errors were inadvertently made in the SE and are entirely editorial in nature. These corrections do not change any of the conclusions in the SE associated with the issuance of Amendment Nos. 326 and 304 and do not affect the associated notice to the public. Enclosed are two replacement SE pages containing a marginal line indicating the area of change.

B. Hanson TS Page Corrections:

Change bar locations have been corrected for several TS pages to be consistent with prior Calvert Cliffs TS change bar usage. Enclosure 2 contains the corrected TS pages with change bars removed/relocated as appropriate for the following pages: 3.3.6-3 3.3.6-4 3.6.2-6 3.6.6-2 3.7.3-4 3.7.3-5 3.7.3-6 3.7.6-3 3.7.7-3 3.8.1-10 3.8.1-11 3.8.1-12 3.8.1-13 3.8.1-14 3.8.1-15 3.8.1-16 3.8.1-17 3.8.1-18 We apologize for any inconvenience caused. If you have any questions, please contact me at (301) 415-2871 or Michael. Marshall@nrc.gov.

Docket Nos. 50-317 and 50-318

Enclosures:

1. Corrected pages 7 and 8 to Safety Evaluation
2. Corrected Renewed Facility Operating License pages 3.3.6-3, 3.3.6-4, 3.6.2-6, 3.6.6-2, 3.7.3-4, 3.7.3-5, 3.7.3-6, 3.7.6-3, 3.7.7-3, 3.8.1-10, 3.8.1-11, 3.8.1-12, 3.8.1-13, 3.8.1-14, 3.8.1-15, 3.8.1-16 3.8.1-17, 3.8.1-18 cc: Listserv Sincerely, td,1/~ Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE 1 Corrected pages 7 and 8 to Safety Evaluation
  • TS 3.3.5 Condition A -One AFW actuation system manual start channel or actuation logic channel inoperable, Required Action A.1.
  • TS 3.3.5 Condition C -One or more functions with one manual actuation channel or actuation logic channel inoperable except AFW actuation system, Required Action C.1.
  • TS 3.3.6 Condition A -One or more functions with one sensor module or associated measurement channel per DG inoperable, Required Actions A.2.1 and A.2.2.
  • TS 3.3.6 Condition B -One or more functions with two sensor modules or associated measurement channels per DG inoperable, Required Action B.2.2.
  • TS 3.6.2 Condition C -One or more containment air locks inoperable for reasons other than Conditions A or B, Required Action C.3.
  • TS 3.6.3 Condition A -One or more penetration flow paths with one containment isolation valve inoperable. (Only applicable to penetration flow paths with two containment isolation valves and not a closed system.) Required Action A.1.
  • TS 3.6.3 Condition C -One or more penetration flow paths with one or more containment isolation valves inoperable, Required Action C.1 . *
  • TS 3.6.6 Condition B -One containment cooling train inoperable, Required Action B.1.
  • TS 3.7.3 Condition A-One steam-driven AFW pump inoperable, Required Action A.2.
  • TS 3.7.3 Condition B -One motor-driven AFW pump inoperable, Required Action B.2.
  • TS 3.7.3 Condition C -Two AFW pumps inoperable, Required Action C.4.
  • TS 3.7.3 Condition D -One AFW train inoperable for reasons other than Conditions A, B, or C, Required Action D.1.
  • TS 3.7.5 Condition A-One component cooling (CC) LOOP inoperable, Required Action A.1.
  • TS 3. 7 .6 Condition B -One service water subsystem inoperable, Required Action B.1.
  • TS 3. 7. 7 Condition A -One saltwater subsystem inoperable, Required Action A.1.
  • TS 3.7.18 Condition A -One required atmospheric dump valve (ADV) line inoperable, Required Action A.1.

OR One required LCO 3.8.1.a offsite circuit that provides power to the CREVS and CRETS inoperable and the required LCO 3.8.1.c offsite circuit inoperable, Required Action G.2.

  • TS 3.8.4 Condition A -One DC channel A.1 inoperable due to an inoperable battery and the reserve battery available, Required Action A.1.
  • TS 3.8.4 Condition B -One DC channel inoperab1 e for reasons other than Condition A, Required Action B.1.
  • TS 3.8. 7 Condition A -One required inverter inoperable, Required Action A.1.
  • TS 3.8.9 Condition A -One or more AC electrical power distribution subsystems inoperable, Required Action A.1.
  • TS 3.8.9 Condition B -One or more AC vital bus subsystem(s) inoperable, Required Action B.1.
  • TS 3.8.9 Condition C -One DC electrical power distribution subsystem inoperable, Required Action C.1. Also, the licensee proposed to add the following example to the TSs as Example 1.3-8: ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One subsystem A.1 Restore subsystem 7 days inoperable.

to OPERABLE status. OR In accordance with the Risk Informed Completion Time Program B. Required Action B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and associated Completion Time AND not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> ENCLOSURE 2 Corrected Renewed Facility Operating License pages 3.3.6-3, 3.3.6-4, 3.6.2-6, 3.6.6-2, 3. 7 .3-4, 3. 7 .3-5, 3. 7 .3-6, 3. 7 .6-3, 3. 7. 7-3, 3.8.1-10, 3.8.1-11, 3.8.1-12, 3.8.1-13, 3.8.1-14, 3.8.1-15, 3.8.1-16, 3.8.1-17, 3.8.1-18 ACTIONS (continued)

CONDITION REQUIRED ACTION C. One or more Functions C.1 Restore at least two with more than two sensor modules and sensor modules or associated associated measurement channels measurement channels to OPERABLE status. inoperable.

D. Required Action and 0.1 Enter applicable associated Completion Conditions and Time not met. Required Actions for the associated DG made inoperable by DG-LOVS instrumentation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.3.6.1 Perform CHANNEL FUNCTIONAL TEST. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.3.6-3 DG-LOVS 3.3.6 COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No.326 Amendment No.304 SURVEILLANCE REQUIREMENTS (continued)

SR 3.3.6.2 SURVEILLANCE Perform CHANNEL CALIBRATION with setpoint Allowable Values as follows: 1. Transient Degraded Voltage Function 2 3630 V ands 3790 V; Time Delay: 2 7.6 seconds and s 8.4 seconds; 2. Steady State Degraded Voltage Function 2 3820 V ands 3980 V Time Delay: 2 97.5 seconds and s 104.5 seconds; and 3. Loss of voltage Function 2 2345 V and s 2555 V Time Delay: 2 1.8 seconds and s 2.2 seconds at 2450 V. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.3.6-4 DG-LOVS 3.3.6 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE Containment Air Locks 3.6.2 FREQUENCY SR 3.6.2.2 Verify only one door in the air lock can be opened at a time. In accordance with the Surveillance Frequency Control Program CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.6.2-6 Amendment No. 326 Amendment No. 304 ACTIONS (continued)

CONDITION C. --------NOTE --------Not applicable when second containment spray train intentionally made inoperable.


Two containment spray trains inoperable.

D. Two containment cooling trains inoperable.

E. Required Action and associated Completion Time not met. F. Any combination of three or more trains inoperable.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 C.1 AND C.2 D.1 E.1 AND E.2 F.1 Containment Spray and Cooling Systems 3.6.6 REQUIRED ACTION Verify LCO 3.7.8, "CREVS," is met. Restore at least one containment spray train to OPERABLE status. Restore one containment cooling train to OPERABLE status. Be in MODE 3. Be in MODE 4. Enter LCO 3.0.3. 3.6.6-2 COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 24 hours 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Immediately Amendment No. 326 Amendment No. 304 ACTIONS (continued)

CONDITION REQUIRED ACTION F. Two AFW trains inoperable.

F.1 LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status. Initiate action to restore one AFW train to OPERABLE status. SURVEILLANCE REQUIREMENTS SR 3.7.3.1 SR 3.7.3.2 SURVEILLANCE Verify each AFW manual, power-operated, and automatic valve in each water flow path and in both steam supply flow paths to the steam turbine-driven pumps, that is not locked, sealed, or otherwise secured in position, is in the correct position.

Cycle each testable, remote-operated valve that is not in its operating position.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.7.3-4 AFW System 3.7.3 COMPLETION TIME Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the INSERVICE TES TI NG PROGRAM Amendment No. 326 Amendment No. 304 SURVEILLANCE REQUIREMENTS (continued)

SR 3.7.3.3 SR 3.7.3.4 SR 3.7.3.5 SURVEILLANCE


NOTE-------------------

Not required to be performed for the turbine-driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching 800 psig in the steam generators.

Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required developed head. -------------------NOTE-------------------

Not required to be performed for the turbine-driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching 800 psig in the steam generators.

Verify each AFW automatic valve that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. -------------------NOTE-------------------

Not required to be performed for the turbine-driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching 800 psig in the steam generators.

Verify each AFW pump starts automatically on an actual or simulated actuation signal. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.7.3-5 AFW System 3.7.3 FREQUENCY In accordance with the INSERVICE TEST! NG PROGRAM In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 SURVEILLANCE REQUIREMENTS (continued)

SR 3.7.3.6 SR 3.7.3.7 SURVEILLANCE


NOTE-------------------

Not required to be performed for the AFW train with the turbine-driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching 800 psig in the steam generators.

Verify the AFW system is capable of providing a minimum of 300 gpm nominal flow to each flow leg. Verify the proper alignment of the required AFW flow paths by verifying flow from the condensate storage tank to each steam generator.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.7.3-6 AFW System 3.7.3 FREQUENCY In accordance with the Surveillance Frequency Control Program Prior to entering MODE 2 whenever unit has been in MODE 5 or 6 for > 30 days Amendment No. 326 Amendment No. 304 SURVEILLANCE REQUIREMENTS SR 3.7.6.1 SR 3.7.6.2 SR 3.7.6.3 SURVEILLANCE


NOTE-------------------

Isolation of SRW flow to individual components does not render SRW inoperable.

Verify each SRW manual, power-operated, and automatic valve in the flow path servicing safety-related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

Verify each SRW automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. Verify each SRW pump starts automatically on an actual or simulated actuation signal. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.7.6-3 SRW 3.7.6 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No.326 Amendment No. 304 SURVEILLANCE REQUIREMENTS (continued)

SR 3.7.7.2 SR 3.7.7.3 SURVEILLANCE Verify each SW System automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. Verify each SW System pump starts automatically on an actual or simulated actuation signal. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.7.7-3 SW 3.7.7 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No.326 Amendment No.304 ACTIONS (continued)

CONDITION J. Required Action and associated Completion Time of Condition A, C, F, G, H, or I not met. OR Required Action and associated Completion Time of Required Action B.2, B.3, B.4.1, B.4.2, or B.5 not met. OR Required Action and associated Completion Time of Required Action E.2, E.3, E.4.1, E.4.2, or E.5 not met. K. Three or more required LCO 3.8.1.a and LCO 3.8.1.b AC sources inoperable.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 REQUIRED ACTION J.1 Be in MODE 3. AND J.2 Be in MODE 5. K.1 Enter LCO 3.0.3. 3.8.1-10 AC Sources-Operating 3.8.1 COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Immediately Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

SR 3.8.1.1 through SR 3.8.1.15 are only applicable to LCO 3.8.1.a and LCO 3.8.1.b AC sources. SR 3.8.1.16 is only applicable to LCO 3.8.1.c AC sources. SR 3.8.1.1 SR 3.8.1.2 SURVEILLANCE


NOTE-------------------

Only required to be performed when SMECO is being credited for an offsite source. Verify correct breaker alignment and indicated power availability for the 69 kV SMECO offsite circuit. Verify correct breaker alignment and indicated power availability for each required 500 kV offsite circuit. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-11 FREQUENCY Once within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after substitution for a 500 kV offs ite circuit In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.3 SURVEILLANCE


NOTES------------------

1. Performance of SR 3.8.1.9 satisfies this Surveillance Requirement.
2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this Surveillance Requirement as recommended by the manufacturer.

When modified start procedures are not used, the voltage and frequency tolerances of SR 3.8.1.9 must be met. Verify each DG starts and achieves steady state voltage~ 4060 V and$ 4400 V, and frequency~

58.8 Hz and$ 61.2 Hz. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3 .8.1-12 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.4 SR 3.8.1.5 SR 3.8.1.6 SURVEILLANCE


NOTES------------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients below the load limit do not invalidate this test. 3. This Surveillance shall be conducted on only one DG at a time. 4. This Surveillance Requirement shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.3 or SR 3.8.1.9. Verify each DG is synchronized and loaded, and operates for~ 60 minutes at a load 4000 kW for DG IA and~ 2700 kW for DGs lB, 2A, and 2B. Verify each day tank contains~

a one hour supply. Check for and remove accumulated water from each day tank. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-13 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.7 SR 3.8.1.8 SR 3.8.1.9 SURVEILLANCE Verify the fuel oil transfer system operates to automatically transfer fuel oil from storage tank[s] to the day tank. Verify interval between each sequenced load block is within+/- 10% of design interval for each emergency and shutdown load sequencer.


NOTE-------------------

All DG starts may be preceded by an engine prelube period. Verify each DG starts from standby condition and achieves, ins 10 seconds, voltage > 4060 V and frequency>

58.8 Hz, and after steady state conditions are reached, maintains voltage~ 4060 V ands 4400 V and frequency of> 58.8 Hz ands 61.2 Hz. SR 3.8.1.10 Verify manual transfer of AC power sources from the normal offsite circuit to the alternate offsite circuit. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-14 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.11 SURVEILLANCE


NOTE-------------------

1. Momentary transients outside the load and power factor limits do not invalidate this test. 2. If performed with the DG synchronized with offsite power, the surveillance test shall be performed at the required power factor. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.

Verify each DG, operating at a frequency 58.8 Hz ands 61.2 Hz, and an appropriate accident load power factor operates for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while loaded to~ 4000 kW for DG lA and~ 3000 kW for DGs lB, 2A, and 2B. SR 3.8.1.12 Verify each DG rejects a load~ 500 hp without tripping.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-15 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3 .8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.13 SR 3.8.1.14 SURVEILLANCE Verify that automatically bypassed DG trips are automatically bypassed on an actual or simulated required actuation signal. Verify each DG: a. Synchronizes with offsite power source while loaded upon a simulated restoration of offsite power; b. Manually transfers loads to offsite power source; and c. Returns to ready-to-load operation.

CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3 .8.1-16 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.15 SURVEILLANCE


NOTE-------------------

All DG starts may be preceded by an engine prelube period. Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Engineered Safety Feature actuation signal: a. De-energization of emergency buses; b. Load shedding from emergency buses; c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in~ 10 seconds, 2. energizes auto-connected emergency loads through load sequencer, 3. maintains steady state voltage 2 4060 V and~ 4400 V, 4. maintains steady state frequency of 2 58.8 Hz and~ 61.2 Hz, and 5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-17 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 326 Amendment No. 304 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.1.16 For the LCO 3.8.1.c AC electrical sources, SR 3.8.1.1, SR 3.8.1.2, SR 3.8.1.3, SR 3.8.1.17 SR 3.8.1.5, SR 3.8.1.6, and SR 3.8.1.7 are required to be performed.


NOTE-------------------

Momentary transients outside the load and power factor limits do not invalidate this test. Verify each DG operates for~ 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: a. For~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the test loaded to 4200 kW for DG lA, and~ 3150 kW and 3300 kW for DGs 18, 2A, and 28, and b. For the remaining hours of the test loaded to~ 3600 kW for DG lA, and AC Sources-Operating 3.8.1 FREQUENCY In accordance with applicable Surveillance Requirements In accordance with the Surveillance Frequency Control Program 2700 kW and~ 3000 kW for DGs 18, 2A, and 28. CALVERT CLIFFS -UNIT 1 CALVERT CLIFFS -UNIT 2 3.8.1-18 Amendment No. 326 Amendment No. 304 B. Hanson

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -CORRECTION TO AMENDMENT NOS. 326 AND 304 RE: ADD RISK-INFORMED COMPLETION TIME PROGRAM (EPID L-2016-LLA-0001)

DATED NOVEMBER 30, 2018 DISTRIBUTION:

PUBLIC PM Reading File RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsRgn 1 Mail Center Resource RidsNrrPMCalvertCliffs Resource RidsACRS_MailCTR Resource RidsNrrDssStsb Resource GDentel, R-1 ADAMS Accession No.: ML18318A014 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NAME MMarshall LRonewicz JDanna DATE 10/05/2018 11/14/2018 11/30/2018 OFFICIAL RECORD COPY NRR/DORL/LPL 1/PM MMarshall 11/30/2018