MONTHYEAR0CAN012402, Emergency Plan Revision 502024-01-17017 January 2024 Emergency Plan Revision 50 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision ML22167A1242022-06-16016 June 2022 Emergency Plan Implementing Procedure Revision 0CAN012001, Submittal of Emergency Plan and Emergency Plan Implementing Procedure2020-01-15015 January 2020 Submittal of Emergency Plan and Emergency Plan Implementing Procedure ML18283A7752018-10-0404 October 2018 Attachments 1 & 2: Summary of Changes to ANO Emergency Plan Implementing Document and Procedure OP-1903.010, Rev. 57, Emergency Action Level Classification 0CAN101801, Submittal of Emergency Plan Implementing Procedure OP-1903.010, Rev. 572018-10-0404 October 2018 Submittal of Emergency Plan Implementing Procedure OP-1903.010, Rev. 57 0CAN061802, Emergency Plan Implementing Procedure2018-06-28028 June 2018 Emergency Plan Implementing Procedure 0CAN081702, Submittal of Emergency Plan Implementing Procedure, OP-1903.010, Emergency Action Level Classification2017-08-14014 August 2017 Submittal of Emergency Plan Implementing Procedure, OP-1903.010, Emergency Action Level Classification 0CAN121102, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme2011-12-0101 December 2011 Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme 0CAN071102, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme2011-07-18018 July 2011 Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme NEI 99-01, Arkansas Nuclear One Units 1 & 2, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme2011-07-18018 July 2011 Arkansas Nuclear One Units 1 & 2, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme ML0412601862004-04-20020 April 2004 Document Update Notification for Document No. OP-1903.023, Personnel Emergency. ML0412601892004-04-19019 April 2004 Change 007-03-0 to Procedure OP-1903.064, Emergency Response Facility - Control Room ML0409103582004-03-24024 March 2004 OP-1903.065, Change 016-03-0 to Emergency Response Facility Technical Support Center (TSC) ML0409103562004-03-23023 March 2004 OP-1903.066, Change 013-01-0, Emergency Response Facility - Operational Support Center (Osc). ML0409103522004-03-23023 March 2004 OP-1903.067, Change 018-00-0, Emergency Response Facility - Emergency Operations Facility (Eof). ML0407700492004-03-0303 March 2004 Arkansas, Units 1 and 2 - Change No. 034-04-0 to OP-1903-060, Emergency Supplies & Equipment. ML0401402692003-12-23023 December 2003 Revised EPIP 1903.065, Change 016-02-0, Emergency Response Facility Technical Support Center. ML0335105342003-12-0303 December 2003 ANO, Units 1 and 2 - Change No. 023-01-0 to OP-1903.044, Administration and Maintenance of the Emergency Plan and Implementing Procedures. ML0332303872003-11-0404 November 2003 Change 027-01-0 to OP-1903.011, Emergency Response/Notifications ML0331801552003-10-30030 October 2003 Change No. 006-00-0 to Procedure OP-1903.068, Emergency Response Facility - Emergency News Center Enc. ML0326908102003-09-12012 September 2003 Change No. 023-00-0 to OP-1903.004, Admin. and Maintenance of the Emergency Plan & Implementing Procedures. ML0322506722003-08-0707 August 2003 Document No. OP-1903.023, Change No. 034-02-0, Personnel Emergency. ML0321800182003-07-31031 July 2003 Change 037-02-0 to OP-1903.010, Emergency Action Level Classification ML0319706472003-07-0909 July 2003 Change No. 016-02-0 to OP-1903.067, Emergency Response Facility - Emergency Operations Facility (EOF) ML0319704632003-07-0909 July 2003 Emergency Response Facility Control Room, Change 007-02-0 to OP-1903.064 ML0319704362003-07-0909 July 2003 Arkansas, Units 1 and 2, Noram Natural Gas Line Rupture ML0319000552003-07-0101 July 2003 Admin. & Maintenance of the Emergency Plan & Implementing Procedures, Change 022-04-0, Procedure 1903.004 ML0316905022003-06-12012 June 2003 Emergency Response Facility Technical Support Center (TSC) ML0316110952003-06-0303 June 2003 Logistical Support ML0316110912003-06-0303 June 2003 EOF Radiological Controls ML0316110872003-06-0303 June 2003 Organization and Use of Emergency Plan Implementing Procedures ML0316110842003-06-0303 June 2003 Assignment of Personnel to the Emergency Response Organization ML0316108472003-06-0303 June 2003 Personnel Emergency ML0316108432003-06-0303 June 2003 Emergency Radiological Controls ML0312607312003-05-0101 May 2003 Transmittal of Emergency Plan Implementing Procedure OP-1903.010, Emergency Action Level Classification. ML0309900962003-03-27027 March 2003 Arkansas, Emergency Response Facility Technical Support Center (Tsc), Change No. 016-00-0 ML0309900242003-03-27027 March 2003 Arkansas, Emergency Response Facility - Operational Support Center (OSC) ML0309807132003-03-27027 March 2003 Arkansas, Emergency Response Facility - Emergency Operations Facility (EOF) ML0309805012003-03-27027 March 2003 Change 008-02-0 to Document OP-1905.003, Rad Protection Requirements for Post-Accident Sampling of Rc. ML0308407402003-03-13013 March 2003 Change 027-00-0 to Document OP-1903.011, Emergency Response/Notifications. ML0305501142003-02-12012 February 2003 Change No. 034-00-0 to OP-1903.023, Personnel Emergency ML0305501992003-02-12012 February 2003 OP-1903.023, Personnel Emergency, Change 034-00-0 ML0227404392002-09-18018 September 2002 Arkansas Units 1 & 2 Emergency Response Facility - Emergency Operations Facility (EOF) ML0220602222002-07-17017 July 2002 Procedure 1903.060, Emergency Supplies & Equipment ML0220001252002-07-10010 July 2002 Arkansas Units 1 & 2 Rad Protection Requirements for Post-Accident Sampling of Rc, Revision No. 008-01-0 ML0219804172002-07-0505 July 2002 37-00-0, Change AP-37 to EPIP OP-1903.010, Emergency Action Level Classification ML0219802122002-07-0505 July 2002 Arkansas Units 1 & 2 Rad Protection Requirements for Post Accident Sampling of Rc ML0215504392002-05-14014 May 2002 Transmittal of OP-1903.011, Revision 026-04-0, Change No. PC-04, Emergency Response/Notifications. ML0213305452002-05-0202 May 2002 Transmittal of OP-1903.010, Revision No. 036-05-0, Change No. PC-05 to Emergency Action Level Classification. 2024-01-17
[Table view] Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] |
Text
0CAN101801 October 4, 2018
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Emergency Plan Implementing Procedure Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f), the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) Emergency Action Level Classification procedure has been revised and is included in Attachment 2 to this letter.
A summary of the changes to the implementing procedure is included in Attachment 1 of this letter.
The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE
SLP/dbb
Attachments: 1. Summary of Changes to ANO Emergency Plan Implementing Document 2. Procedure OP-1903.010, Revision 57, Emergency Action Level Classification Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN101801 Page 2 of 2
cc: Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector
Arkansas Nuclear One P. O. Box 310
London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-8B1 One White Flint North 11555 Rockville Pike
Rockville, MD 20852 Mr. Michael Layton Director, Division of Spent Fuel Management
Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Paul Elkmann NRC Region IV (Senior Emergency Preparedness Inspector)
Division of Reactor Safety 1600 East Lamar Blvd Arlington, TX 76011-4125 Mr. Bernard R. Bevill
Arkansas Department of Health Radiation Control Section 4815 West Markham Street
Slot #30 Little Rock, AR 72205