| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Shea J W, Skaggs M D
| addressee name = Shea J, Skaggs M
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000390, 05000391
| docket = 05000390, 05000391
| license number = NPF-090, NPF-096
| license number = NPF-090, NPF-096
| contact person = Jordan N J
| contact person = Jordan N
| document type = Meeting Briefing Package/Handouts
| document type = Meeting Briefing Package/Handouts
| page count = 21
| page count = 21
| project =
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:Watts Bar Nuclear Plant (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning September 6, 2018  
{{#Wiki_filter:Watts Bar Nuclear Plant (WBN)
*Opening Remarks*Scope of 6.9 kilovolt (kV) General Electric (GE) Metal Clad Switchgear Maintenance*System Overview
Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning September 6, 2018
*WBN Electrical Design
*Safety Related Load Distribution
*Effects of De-energized 6.9 kV Shutdown Board (SDBD)
*Proposed Technical Specification (TS)Changes
*Regulatory Precedent
*Schedule for Submittal*Summary and Closing Remarks Agendal  2 Opening Remarks*Due to WBN Unit 1 and Unit 2 sharing the alternating current (AC) electrical power distribution system and sharing several other systems, performing maintenance on a AC electrical power distribution subsystem (6.9 kV SDBDand associated 480 V SDBDs) for a shutdown unit also affects the operating unit.*The current eight-hour completion time for a de-energized AC electrical power distribution subsystem does not support maintenance on a set of 6.9 kV/480 V SDBDs. *The proposed license amendment request (LAR) will extend the completion time from eight hours to the most limiting Completion Time of the 'associated required features' when maintenance is


performed on a set of 6.9 kV/480 V SDBDs with one unit in operation.
Agenda
l  3 Scope of 6.9 kV GE Metal Clad Switchgear Maintenance l  4 ACTIVITIESDURATION Clearance placement and removal (including load alignment) 12 hours Ground placement and removal 9 hours Compartment Inspections (21 compartments) 42 hoursE-16 light resistor replacements Pull-out fuse block tension
* Opening Remarks
* Scope of 6.9 kilovolt (kV) General Electric (GE) Metal Clad Switchgear Maintenance
* System Overview
* WBN Electrical Design
* Safety Related Load Distribution
* Effects of De-energized 6.9 kV Shutdown Board (SDBD)
* Proposed Technical Specification (TS) Changes
* Regulatory Precedent
* Schedule for Submittal
* Summary and Closing Remarks l 2


Relay and Instrument PT drawer operationCircuit Breaker Interface Inspections and adjustments (17 breakers)34 hours Primary/Secondary disconnects 
Opening Remarks
* Due to WBN Unit 1 and Unit 2 sharing the alternating current (AC) electrical power distribution system and sharing several other systems, performing maintenance on a AC electrical power distribution subsystem (6.9 kV SDBD and associated 480 V SDBDs) for a shutdown unit also affects the operating unit.
* The current eight-hour completion time for a de-energized AC electrical power distribution subsystem does not support maintenance on a set of 6.9 kV/480 V SDBDs.
* The proposed license amendment request (LAR) will extend the completion time from eight hours to the most limiting Completion Time of the associated required features when maintenance is performed on a set of 6.9 kV/480 V SDBDs with one unit in operation.
l 3


Shutters Breaker position and interface measurements and adjustmentsBus Inspection and Tests8 hours As-found and as-left megger
Scope of 6.9 kV GE Metal Clad Switchgear Maintenance ACTIVITIES                                                                                                          DURATION Clearance placement and removal (including load alignment)                                                          12 hours Ground placement and removal                                                                                        9 hours Compartment Inspections (21 compartments)                                                                            42 hours E-16 light resistor replacements Pull-out fuse block tension Relay and Instrument PT drawer operation Circuit Breaker Interface Inspections and adjustments (17 breakers)                                                  34 hours Primary/Secondary disconnects Shutters Breaker position and interface measurements and adjustments Bus Inspection and Tests                                                                                            8 hours As-found and as-left megger DLRO Torque checks Note: The preventive maintenance activities for the 6.9 kV switchgear has the longest duration. The associated 480 V SDBDs and 1E MCCs will also be de-energized during this period. Preventive maintenance inspections for these boards is normally performed during the same outage window to minimize impact to the operating unit and to increase outage schedule efficiency.
l 4


DLRO Torque checksNote: The preventive maintenance activities for the 6.9 kV switchgear has the longest duration. The associated 480 V SDBDs and 1E MCCs will also be de-energized during this period. Preventive maintenance inspections for these boards is normally performed during the same outage window to minimize impact to the operating unit and to increase outage schedule efficiency.
System Overview
System Overview*The onsite Class 1E AC electrical distribution system supplies electrical power to two power trains shared between the two units.*Some safety-related systems (e.g., Essential Raw Cooling Water (ERCW), Component Cooling (CCS), Emergency Gas Treatment (EGTS), Auxiliary Building Gas Treatment (ABGTS), Control Room Emergency Ventilation (CREVS),
* The onsite Class 1E AC electrical distribution system supplies electrical power to two power trains shared between the two units.
and Control Room HVAC (CRACS)) are shared between the  
* Some safety-related systems (e.g., Essential Raw Cooling Water (ERCW), Component Cooling (CCS), Emergency Gas Treatment (EGTS), Auxiliary Building Gas Treatment (ABGTS), Control Room Emergency Ventilation (CREVS),
and Control Room HVAC (CRACS)) are shared between the units.
* Shared loads are distributed across both units AC electrical power distribution subsystems.
l 5


units.*Shared loads are distributed across both unit's AC electrical power distribution subsystems.
System Overview
l  5 System Overview*The core cooling and containment cooling system loads (e.g., Safety Injection (SI) pumps, Auxiliary Feedwater(AFW) pumps, Residual Heat Removal (RHR) pumps, Centrifugal Charging pumps, Containment Spray (CS) pumps, and Air Return System (ARS) fans) are unitized to the respective  
* The core cooling and containment cooling system loads (e.g.,
Safety Injection (SI) pumps, Auxiliary Feedwater (AFW) pumps, Residual Heat Removal (RHR) pumps, Centrifugal Charging pumps, Containment Spray (CS) pumps, and Air Return System (ARS) fans) are unitized to the respective unit's 6.9 kV/480 V SDBDs.
* The impacts of an inoperable offsite power source or diesel generator (DG) on an opposite unit's SDBD differ from the impacts of an inoperable offsite power source or DG on an associated unit's SDBD, due to the loads powered from the respective board.
l 6


unit's 6.9 kV/480 V SDBDs.*The impacts of an inoperable offsite power source or diesel generator (DG) on an opposite unit's SDBD differ from the impacts of an inoperable offsite power source or DG on an associated unit's SDBD, due to the loads powered from the
Watts Bar Electrical Design - Both Units in Operation l 7


respective board.
Watts Bar Electrical Design - 6.9 kV SDBD 1A-A De-energized l 8
l  6 Watts Bar Electrical Design -Both Units in Operation l  7 Watts Bar Electrical Design -6.9 kV SDBD 1A-A De-energized l 8 Safety Related Load Distribution -Both Units in Operation l  9 Example Effects of De-energized 6.9 kV SDBD(For 6.9 kV SDBD 1A-A, Assuming Unit 1 in Mode 6 or defueled, Unit 2 in Mode 1)l  10Unit 1 SystemsRequired ModesU1 / U2 TS Allowed Outage Time (AOT)SI pump 1A-A1, 2, 3, 4NA / NAAFW pump 1A-A1, 2, 3, 4NA / NARHR pump 1A-A1, 2, 3, 4, 5NA / NACharging pump 1A-A 1, 2, 3, 4NA / NACS pump 1A-A1, 2, 3, 4NA / NAARS fan 1A-A1, 2, 3, 4NA / NAPressurizer (Przr) HtrGrps1A-A, 1D1, 2, 3NA / NAShared SystemsRequired ModesU1 / U2 TS AOTERCW pumps J-A, Q-A1, 2, 3, 4, 5NA / 72 hoursCCS pump 1A-A1, 2, 3, 4, 5NA / NA*CCS pump C-S (Alt. Feeder)1, 2, 3, 4, 5NA / NA*EGTS fan A-A1, 2, 3, 4NA / 7 daysControl Room (CR) Air Handling Unit (AHU) A-A1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement7 days / 7 days125 V Vital Battery Charger I1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 2 hours120 V Vital Inverters: 1-I, 2-I1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 24 hoursAC electrical power distribution1, 2, 3, 4, 5, 6, During Irradiated Fuel MovementNA* / 8 hoursDG 1A-A1, 2, 3, 4, 5, 6, During Irradiated Fuel MovementNA* / 10 daysOne offsite circuit1, 2, 3, 4, 5, 6, During Irradiated Fuel MovementNA* / 72 hoursDG 1A-A & one offsite circuit1, 2, 3, 4, 5, 6, During Irradiated Fuel MovementNA* / 12 hours* With appropriate system lineup.
Proposed TS Changes to Facilitate SDBD Maintenancel  11 TSCurrentProposed NoteLCO 3.8.1, AC Sources -
72 hoursNew Condition CWhen due to inoperable powerOperating, Condition A7 dayssource to opposite unit shutdown board.LCO 3.8.1, AC Sources -
12 hoursConditions B and CEnter Condition for inoperable DGOperating, Condition E10 days / 7 daysand Condition for inoperable offsite circuit due to inoperable power source to opposite unit shutdown


board.LCO 3.8.7, Inverters -Operating 24 hoursNARemove AC power supply to inverterCondition Arequirement.LCO 3.8.9, Distribution Systems 8 hoursNew Condition D When due to opposite unit AC-Operating, Condition Ato declare affected shutdown board inoperable.
Safety Related Load Distribution - Both Units in Operation l 9
features inoperableLCO 3.7.8, ERCW, 72 hours7 daysSeparate LAR to extend AOTCondition Afor planned SDBD maintenance LCO 3.8.4, DC Sources -
2 hours7 daysSeparate LAR to Adopt TSTF-500Operating, Condition A Proposed WBN 1 TS 3.8.1 Changes (same for WBN 2)l  12 Proposed WBN 1 TS 3.8.1 Changes (Continued) (same for WBN 2)l  13 Proposed WBN 1 TS 3.8.7 Changes (same for WBN 2)l  14 Proposed WBN 1 TS 3.8.8 Changes (same for WBN 2)l  15 Proposed WBN 1 TS 3.8.9 Changes (same for WBN 2)l 16 Regulatory Precedent*The proposed changes are consistent with the changes made to the Sequoyah (SQN) TS during the ITS conversion (ML15238B460, ML15236A351, ML15258A511, ML15254A509, and ML15258A516).l  17 Schedule for Submittal*September 2018 -Pre-submittal meeting with NRC*October 2018 -Submit  LAR to NRC
*Request NRC approval by October 2019 with a 90-day implementation period to support the WBN Unit 1 outage scheduled for Spring 2020 (U1R16).*December 2018 -Telecon or meeting to discuss any NRC questionsl  18 Summaryl  19The proposed TS completion times for in-operable 6.9 kV and associated 480 V SDBDs considers the impact of shared loads required for an operating unit while providing a window for maximizing maintenance for the opposite unit


when under outage conditions.
Example Effects of De-energized 6.9 kV SDBD (For 6.9 kV SDBD 1A-A, Assuming Unit 1 in Mode 6 or defueled, Unit 2 in Mode 1)
Closing Remarks*Proposed LAR is needed to support a two-unit operating site at WBN.*Due to the commonality of the AC electrical power systems, performing maintenance on 6.9 kV (and associated 480 V) SDBDs for a shutdown unit affects operability on the operating unit.*The LAR will extend the completion times for inoperable AC electrical power systems when maintenance is performed on a
Unit 1 Systems                      Required Modes                                    U1 / U2 TS Allowed Outage Time (AOT)
SI pump 1A-A                        1, 2, 3, 4                                        NA / NA AFW pump 1A-A                        1, 2, 3, 4                                        NA / NA RHR pump 1A-A                        1, 2, 3, 4, 5                                    NA / NA Charging pump 1A-A                  1, 2, 3, 4                                        NA / NA CS pump 1A-A                        1, 2, 3, 4                                        NA / NA ARS fan 1A-A                        1, 2, 3, 4                                        NA / NA Pressurizer (Przr) Htr Grps 1A-A, 1D 1, 2, 3                                          NA / NA Shared Systems                      Required Modes                                    U1 / U2 TS AOT ERCW pumps J-A, Q-A                  1, 2, 3, 4, 5                                    NA / 72 hours CCS pump 1A-A                        1, 2, 3, 4, 5                                    NA / NA*
CCS pump C-S (Alt. Feeder)          1, 2, 3, 4, 5                                    NA / NA*
EGTS fan A-A                        1, 2, 3, 4                                        NA / 7 days Control Room (CR)
Air Handling Unit (AHU) A-A          1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement 7 days / 7 days 125 V Vital Battery Charger I        1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 2 hours 120 V Vital Inverters: 1-I, 2-I      1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 24 hours AC electrical power distribution    1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 8 hours DG 1A-A                              1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 10 days One offsite circuit                  1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 72 hours DG 1A-A & one offsite circuit        1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 12 hours
* With appropriate system lineup.
l 10


shutdown unit when the opposite unit is in operation.*This LAR is needed to support the WBN Unit 1 outage scheduled for Spring 2020.l 20}}
Proposed TS Changes to Facilitate SDBD Maintenance TS                              Current  Proposed            Note LCO 3.8.1, AC Sources -          72 hours New Condition C    When due to inoperable power Operating, Condition A                    7 days              source to opposite unit shutdown board.
LCO 3.8.1, AC Sources -          12 hours Conditions B and C  Enter Condition for inoperable DG Operating, Condition E                    10 days / 7 days    and Condition for inoperable offsite circuit due to inoperable power source to opposite unit shutdown board.
LCO 3.8.7, Inverters - Operating 24 hours NA                  Remove AC power supply to inverter Condition A                                                  requirement.
LCO 3.8.9, Distribution Systems 8 hours  New Condition D    When due to opposite unit AC
- Operating, Condition A                  to declare affected shutdown board inoperable.
features inoperable LCO 3.7.8, ERCW,                72 hours 7 days              Separate LAR to extend AOT Condition A                                                  for planned SDBD maintenance LCO 3.8.4, DC Sources -          2 hours  7 days              Separate LAR to Adopt TSTF-500 Operating, Condition A                                                                            l 11
 
Proposed WBN 1 TS 3.8.1 Changes (same for WBN 2) l 12
 
Proposed WBN 1 TS 3.8.1 Changes (Continued) (same for WBN 2) l 13
 
Proposed WBN 1 TS 3.8.7 Changes (same for WBN 2) l 14
 
Proposed WBN 1 TS 3.8.8 Changes (same for WBN 2) l 15
 
Proposed WBN 1 TS 3.8.9 Changes (same for WBN 2) l 16
 
Regulatory Precedent
* The proposed changes are consistent with the changes made to the Sequoyah (SQN) TS during the ITS conversion (ML15238B460, ML15236A351, ML15258A511, ML15254A509, and ML15258A516).
l 17
 
Schedule for Submittal
* September 2018 - Pre-submittal meeting with NRC
* October 2018 - Submit LAR to NRC
* Request NRC approval by October 2019 with a 90-day implementation period to support the WBN Unit 1 outage scheduled for Spring 2020 (U1R16).
* December 2018 - Telecon or meeting to discuss any NRC questions l 18
 
Summary The proposed TS completion times for in-operable 6.9 kV and associated 480 V SDBDs considers the impact of shared loads required for an operating unit while providing a window for maximizing maintenance for the opposite unit when under outage conditions.
l 19
 
Closing Remarks
* Proposed LAR is needed to support a two-unit operating site at WBN.
* Due to the commonality of the AC electrical power systems, performing maintenance on 6.9 kV (and associated 480 V) SDBDs for a shutdown unit affects operability on the operating unit.
* The LAR will extend the completion times for inoperable AC electrical power systems when maintenance is performed on a shutdown unit when the opposite unit is in operation.
* This LAR is needed to support the WBN Unit 1 outage scheduled for Spring 2020.
l 20}}

Latest revision as of 16:05, 20 October 2019

Presentation Slides - Watts Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning - September 6, 2018
ML18248A102
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/05/2018
From:
Tennessee Valley Authority
To: James Shea, Skaggs M
Office of Nuclear Reactor Regulation
Jordan N
References
Download: ML18248A102 (21)


Text

Watts Bar Nuclear Plant (WBN)

Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning September 6, 2018

Agenda

  • Opening Remarks
  • Scope of 6.9 kilovolt (kV) General Electric (GE) Metal Clad Switchgear Maintenance
  • System Overview
  • WBN Electrical Design
  • Safety Related Load Distribution
  • Effects of De-energized 6.9 kV Shutdown Board (SDBD)
  • Proposed Technical Specification (TS) Changes
  • Regulatory Precedent
  • Schedule for Submittal
  • Summary and Closing Remarks l 2

Opening Remarks

  • Due to WBN Unit 1 and Unit 2 sharing the alternating current (AC) electrical power distribution system and sharing several other systems, performing maintenance on a AC electrical power distribution subsystem (6.9 kV SDBD and associated 480 V SDBDs) for a shutdown unit also affects the operating unit.
  • The current eight-hour completion time for a de-energized AC electrical power distribution subsystem does not support maintenance on a set of 6.9 kV/480 V SDBDs.
  • The proposed license amendment request (LAR) will extend the completion time from eight hours to the most limiting Completion Time of the associated required features when maintenance is performed on a set of 6.9 kV/480 V SDBDs with one unit in operation.

l 3

Scope of 6.9 kV GE Metal Clad Switchgear Maintenance ACTIVITIES DURATION Clearance placement and removal (including load alignment) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Ground placement and removal 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> Compartment Inspections (21 compartments) 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> E-16 light resistor replacements Pull-out fuse block tension Relay and Instrument PT drawer operation Circuit Breaker Interface Inspections and adjustments (17 breakers) 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> Primary/Secondary disconnects Shutters Breaker position and interface measurements and adjustments Bus Inspection and Tests 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> As-found and as-left megger DLRO Torque checks Note: The preventive maintenance activities for the 6.9 kV switchgear has the longest duration. The associated 480 V SDBDs and 1E MCCs will also be de-energized during this period. Preventive maintenance inspections for these boards is normally performed during the same outage window to minimize impact to the operating unit and to increase outage schedule efficiency.

l 4

System Overview

  • The onsite Class 1E AC electrical distribution system supplies electrical power to two power trains shared between the two units.

and Control Room HVAC (CRACS)) are shared between the units.

  • Shared loads are distributed across both units AC electrical power distribution subsystems.

l 5

System Overview

  • The core cooling and containment cooling system loads (e.g.,

Safety Injection (SI) pumps, Auxiliary Feedwater (AFW) pumps, Residual Heat Removal (RHR) pumps, Centrifugal Charging pumps, Containment Spray (CS) pumps, and Air Return System (ARS) fans) are unitized to the respective unit's 6.9 kV/480 V SDBDs.

  • The impacts of an inoperable offsite power source or diesel generator (DG) on an opposite unit's SDBD differ from the impacts of an inoperable offsite power source or DG on an associated unit's SDBD, due to the loads powered from the respective board.

l 6

Watts Bar Electrical Design - Both Units in Operation l 7

Watts Bar Electrical Design - 6.9 kV SDBD 1A-A De-energized l 8

Safety Related Load Distribution - Both Units in Operation l 9

Example Effects of De-energized 6.9 kV SDBD (For 6.9 kV SDBD 1A-A, Assuming Unit 1 in Mode 6 or defueled, Unit 2 in Mode 1)

Unit 1 Systems Required Modes U1 / U2 TS Allowed Outage Time (AOT)

SI pump 1A-A 1, 2, 3, 4 NA / NA AFW pump 1A-A 1, 2, 3, 4 NA / NA RHR pump 1A-A 1, 2, 3, 4, 5 NA / NA Charging pump 1A-A 1, 2, 3, 4 NA / NA CS pump 1A-A 1, 2, 3, 4 NA / NA ARS fan 1A-A 1, 2, 3, 4 NA / NA Pressurizer (Przr) Htr Grps 1A-A, 1D 1, 2, 3 NA / NA Shared Systems Required Modes U1 / U2 TS AOT ERCW pumps J-A, Q-A 1, 2, 3, 4, 5 NA / 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CCS pump 1A-A 1, 2, 3, 4, 5 NA / NA*

CCS pump C-S (Alt. Feeder) 1, 2, 3, 4, 5 NA / NA*

EGTS fan A-A 1, 2, 3, 4 NA / 7 days Control Room (CR)

Air Handling Unit (AHU) A-A 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement 7 days / 7 days 125 V Vital Battery Charger I 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 120 V Vital Inverters: 1-I, 2-I 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AC electrical power distribution 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> DG 1A-A 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 10 days One offsite circuit 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> DG 1A-A & one offsite circuit 1, 2, 3, 4, 5, 6, During Irradiated Fuel Movement NA* / 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • With appropriate system lineup.

l 10

Proposed TS Changes to Facilitate SDBD Maintenance TS Current Proposed Note LCO 3.8.1, AC Sources - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> New Condition C When due to inoperable power Operating, Condition A 7 days source to opposite unit shutdown board.

LCO 3.8.1, AC Sources - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Conditions B and C Enter Condition for inoperable DG Operating, Condition E 10 days / 7 days and Condition for inoperable offsite circuit due to inoperable power source to opposite unit shutdown board.

LCO 3.8.7, Inverters - Operating 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> NA Remove AC power supply to inverter Condition A requirement.

LCO 3.8.9, Distribution Systems 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> New Condition D When due to opposite unit AC

- Operating, Condition A to declare affected shutdown board inoperable.

features inoperable LCO 3.7.8, ERCW, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 7 days Separate LAR to extend AOT Condition A for planned SDBD maintenance LCO 3.8.4, DC Sources - 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 7 days Separate LAR to Adopt TSTF-500 Operating, Condition A l 11

Proposed WBN 1 TS 3.8.1 Changes (same for WBN 2) l 12

Proposed WBN 1 TS 3.8.1 Changes (Continued) (same for WBN 2) l 13

Proposed WBN 1 TS 3.8.7 Changes (same for WBN 2) l 14

Proposed WBN 1 TS 3.8.8 Changes (same for WBN 2) l 15

Proposed WBN 1 TS 3.8.9 Changes (same for WBN 2) l 16

Regulatory Precedent

l 17

Schedule for Submittal

  • September 2018 - Pre-submittal meeting with NRC
  • October 2018 - Submit LAR to NRC
  • Request NRC approval by October 2019 with a 90-day implementation period to support the WBN Unit 1 outage scheduled for Spring 2020 (U1R16).
  • December 2018 - Telecon or meeting to discuss any NRC questions l 18

Summary The proposed TS completion times for in-operable 6.9 kV and associated 480 V SDBDs considers the impact of shared loads required for an operating unit while providing a window for maximizing maintenance for the opposite unit when under outage conditions.

l 19

Closing Remarks

  • Proposed LAR is needed to support a two-unit operating site at WBN.
  • Due to the commonality of the AC electrical power systems, performing maintenance on 6.9 kV (and associated 480 V) SDBDs for a shutdown unit affects operability on the operating unit.
  • The LAR will extend the completion times for inoperable AC electrical power systems when maintenance is performed on a shutdown unit when the opposite unit is in operation.
  • This LAR is needed to support the WBN Unit 1 outage scheduled for Spring 2020.

l 20