MONTHYEARML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities Project stage: Meeting ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities Project stage: Meeting 2013-04-17
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 2023-06-26
[Table view] |
Text
~jIo.!I REGII( UNITED STATES
~",v" "9"'01' NUCLEAR REGULATORY COMMISSION
! . ~0 WASHINGTON, D.C. 20555-0001
<t
~
~
~ ~
"'". ****'" ",0 June 12, 2013 LICENSEE: Duke Energy, Inc.
FACILITY: Brunswick Steam Electric Plant, Units 1 and 2; H.B. Robinson Steam Electric Plant, Unit 2; and Shearon Harris Nuclear Power Plant, Unit 1
SUBJECT:
SUMMARY
OF MAY 2,2013, MEETING WITH DUKE ENERGY CONCERNING THE RELOCATION OF THE EMERGENCY OPERATING FACILITIES (TAC NOS. MF1447, MF1448, MF1449 AND MF1450)
On May 2,2013, the Nuclear Regulatory Commission (NRC) staff conducted a Category 1 public meeting via teleconference call with Duke Energy Inc., which is representing Carolina Power & Light Company, the licensee for Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick); H.B. Robinson Steam Electric Plant, Unit No.2 (HBRSEP) and Shearon Harris Nuclear Power Plant, Unit 1 (Harris); at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for Duke Energy to discuss its proposed license amendment request (LAR) for the relocation of the emergency operations facilities (EOFs) for Brunswick, HBRSEP and Harris. The meeting notice was publicly available on the NRC's website and is documented in the NRC's Agencywide Documents Access and Management System at Accession No. ML13106A337. The list of participants for the meeting are provided in the enclosure to the meeting summary.
During the conference call, the licensee indicated its plans to merge the EOFs for Brunswick, HBRSEP and Harris to Charlotte, North Carolina, where the licensee's headquarters are located. The licensee stated that the purpose for the relocation of the EOFs would be to provide move continuity during emergency response events and to increase the efficiency of common site procedures.
During the conference call, the NRC staff discussed its overall expectation of the LAR, scheduling, and asked a few clarification questions. The NRC staff discussed with the licensee, that the LAR review process includes the acceptance review, requests for additional information, Commission approval, and the development of the safety evaluation.
Specifically, the NRC staff indicated that Title 10 of the Code of Federal Regulations (10 CFR)
Part 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," specifies the requirements for emergency facilities and equipment. The NRC staff indicated that a licensee desiring to locate an EOF more than 25 miles from a nuclear power reactor site(s) must request Commission prior approval. The NRC staff also indicated to the licensee that the proposed LAR should provide a justification for: (1) the changes to the emergency plan according to the requirements of 10 CFR 50.47; (2) the approval from the Federal Emergency Management Agency and State officials; (3) and single unit and multi-unit emergency event scenarios.
In terms of scheduling, the licensee is planning to submit the LAR for Brunswick, HBRSEP and Harris for NRC staff review by December 2013 or January 2014. The NRC staff also indicated to
-2 the licensee that the overall review of the LARs could take more than 1 year, which includes an NRC-observed, performance-based, verification and validation exercise of the new EOF.
Members of the public were invited and two participated in the meeting through a conference call. Public Meeting Feedback forms were not received.
Please contact me at (301) 415-3302 if you have any questions.
Sincerely, Araceli T. Billoch Colon, Project Manager Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-324, 50-325, 50-261, and 50-400
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES U. S. NUCLEAR REGULATORY COMMISSION PUBLIC MEETING WITH DUKE ENERGY BRUNSWICK STEAM ELECTRIC PLANT. UNITS 1 AND 2; H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2; AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 MAY 2, 2013 U. S. NRC M. Norris D.Johnson J. Andersen A. Billoch DUKE ENERGY M. Kirk A. Smith M. Austin M. Leisure T. LeRoy L. Hentz S. Connelly K. Crocker D. Alexander PUBLIC A. Manzano - Brunswick County Emergency Services Manager J. Costello - Emergency Prepraredness Specialist, Dominion Resources Services, Inc.
Enclosure
- 2 the licensee that the overall review of the LARs could take more than 1 year, which includes an NRC-observed, performance-based, verification and validation exercise of the new EOF.
Members of the public were invited and two participated in the meeting through a conference call. Public Meeting Feedback forms were not received.
Please contact me at (301) 415-3302 if you have any questions.
Sincerely, IRA!
Araceli T. Billoch Colon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-324, 50-325, 50-261, and 50-400
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 Reading RidsNrrDorlLpl2-2 Resource RidsAcrsAcnw_MailCTR Resource DJohnson, NSIR RidsNrrPMRobinson Resource RidsNrrPMShearonHarris Resource MNorris, NSIR RidsNrrPMBrunswick Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsNsirDprDdep Resource lWertz, NRR DHuyck, EDO JAndersen, NSIR ADAMS Accession Nos.: Package ML13155A083 Notice ML13106A337 S urnmary ML13155A105 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-2/PM NAME ABillochColon BClayton CGratton for JQuichocho ABiliochColon DATE 06/12/13 06112113 06/12/13 06/12/13 OFFICIAL RECORD COpy