ML103190511
From kanterella
Revision as of 20:14, 18 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML103190511 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 11/12/2010 |
From: | Johnson R W Detroit Edison |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
NRC-10-0080 | |
Download: ML103190511 (25) | |
Similar Documents at Fermi | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARNRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023
[Table view]Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-22-0006, Transmittal of the Core Operating Limits Report for Cycle 222022-03-0808 March 2022 Transmittal of the Core Operating Limits Report for Cycle 22 NRC-20-0011, Transmittal of the Core Operating Limits Report for Cycle 212020-04-16016 April 2020 Transmittal of the Core Operating Limits Report for Cycle 21 NRC-19-0085, DTE Energy Company Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 202019-12-20020 December 2019 DTE Energy Company Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 20 NRC-18-0050, Transmittal of Core Operating Limits Report for Cycle 202018-10-15015 October 2018 Transmittal of Core Operating Limits Report for Cycle 20 NRC-17-0032, Transmittal of Core Operating Limits Report for Cycle 192017-04-0505 April 2017 Transmittal of Core Operating Limits Report for Cycle 19 NRC-15-0098, Transmittal of Revision 1 of Core Operating Limits Report for Cycle 182015-11-12012 November 2015 Transmittal of Revision 1 of Core Operating Limits Report for Cycle 18 NRC-15-0096, Transmittal of Core Operating Limits Report (Colr), Cycle 18, Revision 02015-10-15015 October 2015 Transmittal of Core Operating Limits Report (Colr), Cycle 18, Revision 0 NRC-14-0020, Transmittal of Core Operating Limits Report for Cycle 172014-03-13013 March 2014 Transmittal of Core Operating Limits Report for Cycle 17 NRC-12-0070, Transmittal of Core Operating Limits Report, Cycle 16, Revision 12012-10-0404 October 2012 Transmittal of Core Operating Limits Report, Cycle 16, Revision 1 NRC-12-0030, Transmittal of Core Operating Limits Report Cycle 16 Revision 02012-04-13013 April 2012 Transmittal of Core Operating Limits Report Cycle 16 Revision 0 NRC-11-0025, Transmittal of Cycle 15 Core Operating Limits Report, Revision 12011-05-0505 May 2011 Transmittal of Cycle 15 Core Operating Limits Report, Revision 1 ML11168A1322011-05-0202 May 2011 Revision 101 to Technical Requirements Manual, Volume I and Revision 1 to Core Operating Limits Report, Cycle 15 NRC-11-0010, Submittal of 2010 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2011-04-29029 April 2011 Submittal of 2010 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-10-0080, Transmittal of Cycle 15 Core Operating Limits Report2010-11-12012 November 2010 Transmittal of Cycle 15 Core Operating Limits Report ML0912701872009-04-27027 April 2009 Technical Requirements Manual - Volume I NRC-09-0027, Transmittal of Cycle 14 Core Operating Limits Report2009-04-16016 April 2009 Transmittal of Cycle 14 Core Operating Limits Report ML0823408572008-08-0404 August 2008 Revision to Technical Requirements Manual, Volume 1 NRC-06-0043, 2,Transmittal of Cycle 12 Core Operating Limits Report, Revision 12006-06-0808 June 2006 2,Transmittal of Cycle 12 Core Operating Limits Report, Revision 1 NRC-04-0065, Transmittal of Cycle 10 Core Operating Limits Report. Revision 12004-08-30030 August 2004 Transmittal of Cycle 10 Core Operating Limits Report. Revision 1 NRC-03-0038, Transmittal of Cycle 10 Core Operating Limits Report2003-04-28028 April 2003 Transmittal of Cycle 10 Core Operating Limits Report 2023-12-14 Category:Letter MONTHYEARIR 05000341/20230042024-02-0505 February 2024
[Table view]Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML103190511&oldid=1367918"