Letter log

From kanterella
Revision as of 23:18, 16 March 2021 by StriderTol (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Page to give a coordinated letter log for recent events

07-19-2022

... further results

 SiteFromIssue dateTitleTopic
NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump InoperableHatchSouthern Nuclear
Gayheart C
30 November 2022Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump InoperableSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Time Critical Operator Action
Maintenance Rule Program
Fuel cladding
ML22028A18427 January 2022
28 January 2022
30 October 2022
Framatome, Inc., Submittal of Model No. TN-B1 Transport Package, License Amendment Request
ML22028A19107109372John Mckirgan
Office of Nuclear Material Safety and Safeguards
30 October 2022Attachment 6: Proposed Changes to CoC
ML22210A14707201032Holtec29 September 2022Attachment 1: HI-STORM FW Amendment 7 RAI Responses Part 2 (non-proprietary)Tornado Missile
Probabilistic Risk Assessment
Earthquake
ML22132A083Steven Garry
NRC/NRR/DRA/ARCB
31 August 2022Rev 1 Monitoring Criteria and Methods to Calculate Occupational Radiation DosesHigh Radiation Area
Anticipated operational occurrence
Exemption Request
Tritium
ML22152A114Ahsan Sallman
NRC/NRR/DSS
31 August 2022Rev. 5 Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant AccidentShutdown Margin
Mission time
Fire Barrier
Coatings
Incorporated by reference
Foreign Material Exclusion
Earthquake
Fuel cladding
ML22178A05105007513Office of Nuclear Material Safety and Safeguards31 August 2022Scoping Summary Report for the Kairos Hermes Construction Permit Environmental ReviewProbabilistic Risk Assessment
Chernobyl
NUREG-0090 Volume 44, Report to Congress on Abnormal Occurrences Fiscal Year 2021Kerstun Norman
Office of Nuclear Regulatory Research
31 August 2022NUREG-0090, Vol 44, Report to Congress on Abnormal Occurrences Fiscal Year 2021Cyber Security
Deep Dose Equivalent
Brachytherapy
Stolen
ML22216A198Bernard Litkett
NRC/NRR/DRO/IOLB
31 August 2022OLMC-320, Iolb Review of Initial Licensing ExaminationsJob Performance Measure
ML22210A061Yuken Wong
Thomas Scarbrough
NRC/NRR/DEX/EMIB
31 August 2022NRC Staff Presentation at the Air-Operated Valve Users' Group Annual Conference - August 9 - 11, 2022Stroke time
Squib
Incorporated by reference
Earthquake
Power-Operated Valves
COVID-19
Grace period
ML22213A120MillstoneDominion Energy Nuclear Connecticut
Armstrong L
19 August 2022Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 21
ML22220A119Cindy Bladey
NRC/NMSS/DREFS/RASB
17 August 2022August 17 Cost-Benefit Public Meeting Presentation
ML22195A262NRC/OCIO12 August 2022OMB 3150-XXXX, Final Supporting Statement - Nrcareers (Monster Government Solutions)
ML22199A245NRC/OCIO12 August 2022OMB 3150-0209 Final Supporting Statement for 10 CFR Part 5
IR 05000334/2022002Beaver ValleyMatt Young
NRC/RGN-I/DORS
12 August 2022Integrated Inspection Report 05000334/2022002 and 05000412/2022002High Radiation Area
Ultimate heat sink
Stroke time
Internal Flooding
Temporary Modification
Cyber Security
Zebra Mussel
Functionality Assessment
FLEX
Fire Protection Program
ML22223A159NRC/RES/DE
Dinesh Taneja
12 August 2022Draft Regulatory Guide 1.250, Rev. 0, Dedication of Commercial-Grade Digital Instrumentation & Control Item for Use in Nuclear Power Plants (for ACRS on 9-7-22)Commercial Grade Dedication
Incorporated by reference
IR 05000334/2022402Beaver ValleyMatt Young
NRC/RGN-I/DORS
12 August 2022Cyber Security Problem Identification and Resolution Inspection Report 05000334/2022402 and 05000412/2022402 (Cover Letter Only)Cyber Security
ML22224A016NRC/OE
Sandra Mendez
12 August 2022Reactor Allegations Substantiated with Regulatory Response - January 2018 - July 2022
ML22224A018NRC/OE
Sandra Mendez
12 August 2022Reactor Open Allegations by Cy Received - January 2018 - July 2022
ML22224A020NRC/OE
Sandra Mendez
12 August 2022Reactor Allegations Substantiated by Cy Received - January 2018 - July 2022
ML22224A023NRC/OE
Sandra Mendez
12 August 2022Discrimination Allegations Received July 22
ML22224A025NRC/OE
Sandra Mendez
12 August 2022Allegations Received from Onsite Sources - January 2018 - July 2022
ML22224A026NRC/OE
Sandra Mendez
12 August 2022Allegations Received from All Sources External to the NRC July 22
ML22224A035SequoyahPerry Buckberg
Plant Licensing Branch II
12 August 2022Regulatory Audit Questions - Request for Alternative to ASME Operation and Maintenance Code Subsection ISTC-3630
ML22224A092Office of Nuclear Reactor Regulation12 August 2022Adv. Rx Int. Schedule 8-11-2022 Stakeholder Meeting
ML22224A127VogtleJames Gaslevic
NRC/NRR/VPOB
12 August 2022Dashboard Report 8-12-2022
ML22224A128VogtleJames Gaslevic
NRC/NRR/VPOB
12 August 2022ITAAC Review Status Report 8-12-2022
PMNS20220806, Public Meeting to Present the Nuclear Regulatory Commission (NRC) Recently Completed and near-term Actions Related to the February 3, 2021, Event at the National Institute of Standards and Technology (NIST) Test ReactorNational Bureau of Standards ReactorOffice of Nuclear Reactor Regulation12 August 2022Public Meeting to Present the Nuclear Regulatory Commission (NRC) Recently Completed and near-term Actions Related to the February 3, 2021, Event at the National Institute of Standards and Technology (NIST) Test Reactor
PMNS20220808, 2022 NRC Standards Forum (Virtual Meeting)Office of Nuclear Regulatory Research12 August 20222022 NRC Standards Forum (Virtual Meeting)
PMNS20220822, Test Ticket Please IgnorsOffice of Nuclear Reactor Regulation12 August 2022Test Ticket Please Ignors
ML22174A408Kenneth Kolaczyk
NRC/NRR/DRO/IRAB
11 August 2022IMC 1245 Appendix D1 Maintaining QualificationsNon-Destructive Examination
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Power Operated Valves
COVID-19
Inspection Manual Change Notice 22-017,NRC/NRR/DRO/IRIB
Madeleine Arel
11 August 2022Inspection Manual Change Notice 22-017
IR 05000346/2022002Davis BesseNRC/RGN-III/DRP/B2
Eve E
11 August 2022Integrated Inspection Report 05000346/2022002Boric Acid
Packing leak
Grab sample
Stroke time
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
Significance Determination Process
Liquid penetrant
Fire Protection Program
Power change
SECY-22-0077, Weekly Information Report Week Ending August 5, 2022Marissa Bailey
NRC/EDO/AO
11 August 2022SECY-22-0077: Weekly Information Report Week Ending August 5, 2022
IR 05000443/2022002SeabrookMatt Young
NRC/RGN-I/DORS
11 August 2022Integrated Inspection Report 05000443/2022002High Radiation Area
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Fire Protection Program
Power change
IR 05000282/2022002Prairie IslandHironori Peterson
Region 3 Branch 3
11 August 2022Integrated Inspection Report 05000282/2022002 and 05000306/2022002Offsite Dose Calculation Manual
Temporary Modification
Functionality Assessment
Significance Determination Process
Fire Protection Program
IR 05000387/2022010SusquehannaJonathan Greives
NRC/RGN-I/DORS
11 August 2022Biennial Problem Identification and Resolution Inspection Report 05000387/2022010 and 05000388/2022010Reactor Vessel Water Level
Half scram
Enforcement Discretion
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Fast acting solenoid valve
IR 05000336/2022002MillstoneMatt Young
NRC/RGN-I/DORS
11 August 2022Integrated Inspection Report 05000336/2022002 and 05000423/2022002Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Moisture barrier
Fire Protection Program
Power change
PMNS20220801, Public Meeting to Discuss Source Terms and Radiological Consequence AnalysesOffice of Nuclear Reactor Regulation11 August 2022Public Meeting to Discuss Source Terms and Radiological Consequence AnalysesCOVID-19
ML22223A117NRC/RES/DRA
Joseph Kanney
11 August 2022NRC Form 390 for Sources of Uncertainty in Probabilistic Flood Hazard Assessment (PFHA)
ML22223A126SequoyahOffice of Public Affairs Region II11 August 2022News Release-II-22-022: NRC Names New Resident Inspector at Sequoyah Nuclear Power PlantNew Resident Inspector
PMNS20220814, Periodic Advanced Reactor Stakeholder MeetingOffice of Nuclear Reactor Regulation11 August 2022Periodic Advanced Reactor Stakeholder Meeting
ML22224A144SurryJohn Klos
NRC/NRR/DORL/LPL2-1
11 August 2022Acceptance Email TS Change AFW Cross Connect AOT LAR
ML22117A049Steven Garry
NRC/NRR/DRA/ARCB
10 August 2022DG-8060 (Rg 8.34 Rev 1) Public Comment Response Matrix
... further results