| Site | Start date | Title |
---|
05000461/LER-1999-007, Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed | Clinton | 12 June 1999 | Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed |
05000461/LER-1998-026, Forwards LER 98-026-00 Re Incorrect Supplier Design,Iaw 10CFR50.73.Commitment Made by Util Listed | Clinton | 18 December 1998 | Forwards LER 98-026-00 Re Incorrect Supplier Design,Iaw 10CFR50.73.Commitment Made by Util Listed |
05000461/LER-1998-027, Forwards LER 98-027-00,re Failure to Perform Surveillance Testing on Div II 4.16 Kv Bus Undervoltage Relay within Specified Frequency.Commitments Listed | Clinton | 19 October 1998 | Forwards LER 98-027-00,re Failure to Perform Surveillance Testing on Div II 4.16 Kv Bus Undervoltage Relay within Specified Frequency.Commitments Listed |
05000461/LER-1998-032, Forwards LER 98-032-00 Re Excessive Voltage Drop in Control Circuit for Division 3 Diesel Output Circuit Breaker. Commitments Made by Util,Listed | Clinton | 1 October 1998 | Forwards LER 98-032-00 Re Excessive Voltage Drop in Control Circuit for Division 3 Diesel Output Circuit Breaker. Commitments Made by Util,Listed |
05000461/LER-1998-030, Forwards LER 98-030-00,re Insufficient Suppression Pool Makeup Volume to Meet Design Basis.Commitments Made by Util, Listed | Clinton | 28 September 1998 | Forwards LER 98-030-00,re Insufficient Suppression Pool Makeup Volume to Meet Design Basis.Commitments Made by Util, Listed |
05000461/LER-1998-031, Forwards LER 98-031-00 Re Surveillance Procedures Which Do Not Adequately Consider Accuracy of Installed Instrumentation in Meeting TS Requirements for DG Loading. Commitments,Listed | Clinton | 28 September 1998 | Forwards LER 98-031-00 Re Surveillance Procedures Which Do Not Adequately Consider Accuracy of Installed Instrumentation in Meeting TS Requirements for DG Loading. Commitments,Listed |
05000461/LER-1998-021, Forwards LER 98-021-00,re Cracks in Medium & High Density Silicone Penetration Seals Not Per Design Basis.Commitments Made within Ltr,Listed | Clinton | 18 August 1998 | Forwards LER 98-021-00,re Cracks in Medium & High Density Silicone Penetration Seals Not Per Design Basis.Commitments Made within Ltr,Listed |
05000461/LER-1998-020, Forwards LER 98-020-00 Re Inadequate Flow Balancing of Shutdown SWS Which Resulted in Less than Required Flow to SWS Loads.Commitment Made by Util,Listed | Clinton | 8 July 1998 | Forwards LER 98-020-00 Re Inadequate Flow Balancing of Shutdown SWS Which Resulted in Less than Required Flow to SWS Loads.Commitment Made by Util,Listed |
05000461/LER-1998-019, Forwards LER 98-019-00 Re Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Commitments Made by Util,Listed | Clinton | 19 May 1998 | Forwards LER 98-019-00 Re Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Commitments Made by Util,Listed |
05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl | Zion | 8 May 1998 | Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl |
05000295/LER-1997-017, Forwards LER 97-017-01,which Clarifies Info on Event Description,Root Causes & Analysis.Cas Have Been Updated. Attachment a Provides Commitments Associated W/ Correspondence | Zion | 10 April 1998 | Forwards LER 97-017-01,which Clarifies Info on Event Description,Root Causes & Analysis.Cas Have Been Updated. Attachment a Provides Commitments Associated W/ Correspondence |
05000295/LER-1997-018, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl | Zion | 10 April 1998 | Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl |
05000461/LER-1998-010, Forwards LER 98-010-00 & 10CFR21 Rept 21-97-060 Re Inoperable Divisions 1 & 2 Hydrogen & Oxygen Analyzers Due to Inadequate Commercial Grade Dedication of safety-related Replacement Parts.Commitments,Listed | Clinton | 10 April 1998 | Forwards LER 98-010-00 & 10CFR21 Rept 21-97-060 Re Inoperable Divisions 1 & 2 Hydrogen & Oxygen Analyzers Due to Inadequate Commercial Grade Dedication of safety-related Replacement Parts.Commitments,Listed |
05000461/LER-1998-008, Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed | Clinton | 8 April 1998 | Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed |
05000295/LER-1997-004, Forwards LER 97-004-01,which Clarifies Info on Event Description,Root Cause & Safety Analysis.Cas Have Been Updated.No Commitments Have Been Made | Zion | 20 March 1998 | Forwards LER 97-004-01,which Clarifies Info on Event Description,Root Cause & Safety Analysis.Cas Have Been Updated.No Commitments Have Been Made |
05000461/LER-1997-035, Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed | Clinton | 19 March 1998 | Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed |
05000295/LER-1997-015, Forwards LER 97-015-01,per 10CFR50.73(a)(2)(iv),which Requires Written Rept When Any Event Occurs That Resulted in Manual or Automatic Actuation of Any Esg.No Commitments Were Made within Rept | Zion | 4 March 1998 | Forwards LER 97-015-01,per 10CFR50.73(a)(2)(iv),which Requires Written Rept When Any Event Occurs That Resulted in Manual or Automatic Actuation of Any Esg.No Commitments Were Made within Rept |
05000461/LER-1998-009, Forwards LER 98-009-00,re Failure to Adequately Account for Design Basis Sys Pressures & Voltages for EDG Air Start Sys. Commitments Made within Ltr,Listed | Clinton | 4 March 1998 | Forwards LER 98-009-00,re Failure to Adequately Account for Design Basis Sys Pressures & Voltages for EDG Air Start Sys. Commitments Made within Ltr,Listed |
05000295/LER-1997-005, Forwards LER 97-005-01,which Requires Thirty Day Written Rept Following Any Operation Prohibited by Plants Tss. Attachment a Provides Commitments Associated with Correspondence | Zion | 2 March 1998 | Forwards LER 97-005-01,which Requires Thirty Day Written Rept Following Any Operation Prohibited by Plants Tss. Attachment a Provides Commitments Associated with Correspondence |
05000295/LER-1997-011, Forwards LER 97-011-02,re Two Supplements Mistakenly Sent to Nrc.Questions or Comments Should Be Addressed to R Godley.Commitments Listed | Zion | 2 March 1998 | Forwards LER 97-011-02,re Two Supplements Mistakenly Sent to Nrc.Questions or Comments Should Be Addressed to R Godley.Commitments Listed |
05000295/LER-1994-005, Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl | Zion | 16 January 1998 | Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl |
05000461/LER-1997-033, Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments | Clinton | 16 January 1998 | Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments |
05000295/LER-1997-026, Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl | Zion | 8 January 1998 | Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl |
05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence | Zion | 22 December 1997 | Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence |
05000295/LER-1997-025, Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl | Zion | 19 December 1997 | Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl |
05000461/LER-1997-023, Forwards LER 97-023-00,re Inadequate Work Instruction Which Led to Potential Overgreasing of Motor Bearings Causing Potential Failure of Various Motors.Commitments Made within Ltr,Listed | Clinton | 5 December 1997 | Forwards LER 97-023-00,re Inadequate Work Instruction Which Led to Potential Overgreasing of Motor Bearings Causing Potential Failure of Various Motors.Commitments Made within Ltr,Listed |
05000461/LER-1997-027, Forwards LER 97-027-00 Re Misinterpretation of 10CFR50.59 Which Resulted in Installation of Mod of RHR That Is Outside Design Basis,Per 10CFR50.73.Commitment Made within Ltr, Listed | Clinton | 4 December 1997 | Forwards LER 97-027-00 Re Misinterpretation of 10CFR50.59 Which Resulted in Installation of Mod of RHR That Is Outside Design Basis,Per 10CFR50.73.Commitment Made within Ltr, Listed |
05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach | Zion | 1 December 1997 | Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attached |
05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl | Zion | 21 November 1997 | Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl |
05000295/LER-1997-022, Forwards LER 97-022-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr,Encl | Zion | 21 November 1997 | Forwards LER 97-022-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr,Encl |
05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl | Zion | 14 November 1997 | Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl |
05000295/LER-1997-001, Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items | Zion | 14 November 1997 | Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items |
05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) | Zion | 13 November 1997 | Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) |
05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl | Zion | 11 November 1997 | Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl |
05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr | Zion | 1 October 1997 | Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr |
05000461/LER-1996-014, Forwards LER 96-014-01,containing Cause for Event & Corrective Actions to Prevent Recurrence Re Inadequately Tested Auxiliary Bldg Roof Plug.Commitments,Listed | Clinton | 1 October 1997 | Forwards LER 96-014-01,containing Cause for Event & Corrective Actions to Prevent Recurrence Re Inadequately Tested Auxiliary Bldg Roof Plug.Commitments,Listed |
05000461/LER-1997-022, Forwards LER 97-022-00 Re Design of DG Ventilation Subsystems Being Outside of Design Basis.Ler Also Contains 10CFR21 Rept.Commitments Made by Util,Listed | Clinton | 22 September 1997 | Forwards LER 97-022-00 Re Design of DG Ventilation Subsystems Being Outside of Design Basis.Ler Also Contains 10CFR21 Rept.Commitments Made by Util,Listed |
05000461/LER-1997-018, Forwards LER 97-018-00 Re Inadequate Preventive Maint Which Led to Possible Failure of W Dhp Circuit Breakers to Open on Demand.Commitments,Listed | Clinton | 19 September 1997 | Forwards LER 97-018-00 Re Inadequate Preventive Maint Which Led to Possible Failure of W Dhp Circuit Breakers to Open on Demand.Commitments,Listed |
05000295/LER-1997-019, Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence | Zion | 18 September 1997 | Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence |
05000304/LER-1996-004, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a | Zion | 5 September 1997 | Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a |
05000461/LER-1997-021, Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error | Clinton | 25 August 1997 | Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error |
05000461/LER-1997-020, Forwards LER 97-020-00 Re Failure to Document Effect of Degraded Coatings in Containment on Eccs.Commitments Made by Util,Listed | Clinton | 13 August 1997 | Forwards LER 97-020-00 Re Failure to Document Effect of Degraded Coatings in Containment on Eccs.Commitments Made by Util,Listed |
05000461/LER-1997-017, Forwards LER 97-017-00 Re Failure to Properly Calibrate MSL Radiation Monitors.List of Commitments Provided | Clinton | 7 August 1997 | Forwards LER 97-017-00 Re Failure to Properly Calibrate MSL Radiation Monitors.List of Commitments Provided |
05000295/LER-1997-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed | Zion | 23 May 1997 | Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed |
05000295/LER-1997-009, Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions | Zion | 14 May 1997 | Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions |
05000295/LER-1997-010, Forwards LER 97-010-00 IAW 10CFR50.73(a)(2)(i)(B).Corrective Actions Listed | Zion | 5 May 1997 | Forwards LER 97-010-00 IAW 10CFR50.73(a)(2)(i)(B).Corrective Actions Listed |
05000295/LER-1997-008, Forwards LER 97-008-00 Which Repts Condition That Resulted in Condition of Npp.Listed Commitments Included in Rept | Zion | 21 April 1997 | Forwards LER 97-008-00 Which Repts Condition That Resulted in Condition of Npp.Listed Commitments Included in Rept |
05000295/LER-1997-007, Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util | Zion | 10 April 1997 | Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util |
05000461/LER-1996-016, Forwards LER 96-016-01:re Residual Water Covering Portion of Disc/Seat Area During Testing Due to Design Not Allowing Complete Draining Results in Invalid Local Leak Rate Testing of Feedwater Containment Isolation | Clinton | 27 March 1997 | Forwards LER 96-016-01:re Residual Water Covering Portion of Disc/Seat Area During Testing Due to Design Not Allowing Complete Draining Results in Invalid Local Leak Rate Testing of Feedwater Containment Isolation |
05000295/LER-1997-002, Forwards LER 97-002-00.Commitments Made by Util Listed | Zion | 18 February 1997 | Forwards LER 97-002-00.Commitments Made by Util Listed |