IR 05000318/1989015

From kanterella
Revision as of 22:20, 18 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violatons Noted in Insp Rept 50-318/89-15
ML20246C910
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/14/1989
From: Boger B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8908250176
Download: ML20246C910 (3)


Text

m, '[;g' t =--x--

. , , . .

. c ) ':

..,

41 .

, .

, ,

_ .

, ,

,

l

.

s 4 M.:

Dy[ , a ;- >>j .

N;m,'

'

'

7 '

- gg- j 4.1989 W.., .

,

l% ;-!$,f

'

, j[ , , DockstfNo.50-318L License No.-DPR-69.,

< ;. ?

Qh

Baltimore Gas and-Electric Compan P

ATTN: Mr. George C. Creel .

'

~Vice President >

?

'

. Nuclear Energy

,

.Calvert Cliffs Nuclear Power Plant-'

cMD.Rts 2 &'4,;P.O. Box 1535 j4 '

Lusby, Maryland '20657 <

.: '

'Gentiemen:

Subjecti 1 Inspection.No.:50-318/89-15

.. 'This. refers.to'yourflet.ter dated July 10, 1989, in response to our. letter

{ dated June 9,~193 .Thank you forl informing us of the corrective and preventive' actions documented

.

.in your letter. These. actions:will be examined during a future-inspection of yourulicensed program.

..

EYour cooperation with.us isl appreciated.

g

Sincerely, Origimi Sisned Brt Jacque P. Nrr Bruce A.'Boger, Acting Director Division of Reactor Safet cc w/encli W. J. Lippold, General Su'pervisor,' Technical Services Engineering T. Magette, Administrator, Nuclear Evaluations

'Public Document Room (PDR)

-Local Public Document Room (LPDR)

' Nuclear Safety Information Center (NSIC)

'

NRC Resident Inspector State of Maryland (2)

.

,

OFFICIAL RECORD COPY RL CC 89-15 - 0001.0.0 ff ;ge2%h390si40500Q8 08/02/89 Q-GE:0 _ _:_____

_

- _ _ - -

p

> s.

L .

,

, k* AUG 141989

-

...

bec w/ enc 1:

Region I Docket Room (with concurrences)

enoscu ent Assisumt, DRMA (w/o enc 1)

J. Wiggins, DRP L. Tripp, DRP D. Limroth, DRP S. McNeil, NRR PA0 (14) SALP Reports Only J. Dyer, EDG i

RI:DRS 'I:DRS RI:DRS rs/pmb ('Strosnider Durr kI:D)d Bhlger p i 8/ 7 /89 8/8 /89 8//4/89 ) 9 0FFICIAL RECORD COPY RL CC 89-15 - 0002. /02/89

_ _ _ _ - _ _ . _ - _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ - _ _ _ _ _ _ -

..q. Y

-

>

<

't ,

,w.s < . p'

-f'

- fEgi

'

. i

'*

BALTIMORE

, , GAS.AND s ELECTRIC-CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 Gromoc C. CattL Vice Passiosur NucLEAn Ewanov (ace roo-ames July 10,1989

.

  • U. S. Nuclear Regulatory Commission J Washington, DC 20555 1

' ATTENTION: Document Control Desk SUBJECT: Calvert Cliffs Nuclear Power Plant Unit Nos.1~ & 2; Docket Nos. 50-317 & 50-318 Combined Insoection Reoort No. 50-318/89-15 REFERENCE: (a) Letter from M ' R. Strosnider (NRC) to Mr. . G.' C. Creel (BGAE), dated June 9,.1989, same subject -

Gentlemen:

- This transmitsI our response to Appendix, A of Reference (a), which cites a violation of NRC ' requirements with! respect to . the certification of personnel ' responsible for Non-Destructive' Examinations - at Calvert Cliffs. Enclosure (1) provides out. response to the Notice of Violation, as require Should .' you have any further questions regarding this matter, . we will . be pleased to discuss' them with yo Very truly yours, L

l /

l- -

..

As GCC/CDS/ dim

}

Enclosure .

cc: D. A. Brune, Esquire J. E. Silberg, Esquire R. A.Capm,NRC S. A.McNeil,NRC W. T. Russell, NRC .

H. Eichenholz/V. L. Pritchett, NRC o T. Magette. DNR

!

IbMoff+@70 V _ _

_ .

- _ -

.

, .. . s

.

-

ENCT_OSURE (1)

REPLY TO NRC INSPECTION REPORT 50-318/89-15

[

Appendix A of NRC Inspection Report 50-318/89-15 cites four examples of non-compliance in the area of Non-Destructive Examination (NDE) Personnel Certification records. Examples cited are:

o Absence of records indicating that required annual training was given to two individuals for liquid penetrant testin o Absence of some required Lesson Plan Records for documenting NDE trainin .

o Failure to make one visual NDE examiner aware that his certification had-expire o Failure to clearly and specifically address NDE certification of visual examination personnel for visual examination types VT-1, VT-2, VT-3, and VT- We fully recognize the importance of utilizing - qualified and certified NDE examination personnel and plan to rectify the current problemr with the fcilo' wing corrective action . The inspections performed by the NDE examiner during the period his certification was expired will be evaluated. If found to be unacceptable, the inspections will be repeate . We have arranged for additional resources to provide the recordkeeping and

,

clerical support required by our NDE program. These additional resources will enable us to properly maintain our NDE record . NDE Control Procedure 5.002, " Qualification and Certification of Non-Destructive Examination Personnel," will be revised to; specifically address each type of visual examination defined i.n the 1983 ASME Section XI through Summer 1983 Addenda (VT-1, VT- VT-3, and VT-4). ,

I address annual training requirements of unlimited NDE examiners,  !

and; provide a certification summary sheet for each NDE examiner so that they are aware of their certification statu J Corrective actions (2) and (3) have been initiated through the use of contracter personnel for other routine NDE work so BG&E personnel can concentrate on these particular problem areas. We feel confident that the corrective actions cited above will assure that the qualification and certification of NDE personnel is performed in accordance with our procedures and applicable National Standards. We believe that the i corrective actions described herein will preclude additional violations in this are We expect that all the corrective actions will be complete by October 1969, at which time we will be in fu!! complianc l l

- - - _ . _ -. _ _ i