MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000313/20223012022-06-15015 June 2022 NRC Examination Report 05000313/2022301 IR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20183012018-04-0404 April 2018 NRC Examination Report 05000313/2018301 IR 05000368/20173012017-03-22022 March 2017 NRC Examination Report 05000368/2017301 ML16011A1792016-01-11011 January 2016 Notification of NRC Initial Operator Licensing Examination 05000313/2016301 IR 05000368/20153012015-09-24024 September 2015 Er 05000368/2015301; 08/24/2015 - 09/15/2015; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000368/20143022014-09-0404 September 2014 Er 050003682014302; on 07/30/2014 - 08/21/2014; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Retake Examination Report IR 05000368/20143012014-04-17017 April 2014 Er 05000368-14-301, on February 10 - March 19, 2014, Arkansas Nuclear One, Unit 2, Initial Operator Licensing Examination Report IR 05000313/20133012013-03-29029 March 2013 Er 05000313-13-301; February 22 - March 18, 2013; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML12054A1172012-02-23023 February 2012 Notification of NRC Initial Operator Licensing Examination 05000368/12-301 IR 05000313/20113022011-10-26026 October 2011 Er 05000313-11-302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report IR 05000368/20113012011-03-17017 March 2011 Er 05000368-11-301 on 01/28/2011 - 02/17/2011, Arkansas Nuclear One, Unit 2 IR 05000313/20103012010-04-12012 April 2010 Er 05000313-10-301, on 03/08/2010 to 3/16/2010, Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination Report IR 05000368/20093022009-10-0505 October 2009 Er 05000368-09-302; on 08/07/2009, Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20093012009-02-20020 February 2009 Er 50-313/09-301, 50-368/09-301 on 01/26/09 - 02/03/09 for Arkansas Nuclear One, Unit 1 ML0828001112008-10-0606 October 2008 2008 -09 - Examination Report ML0824801592008-09-0303 September 2008 Er 05000313-08-301, on 09/08/2008, Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Examination Approval IR 05000368/20083012008-03-14014 March 2008 Er 05000368-08-301, on February 25-28, 2008; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20073012007-04-25025 April 2007 Er 05000313-07-301, on 03/5-8/2007, Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000313/20043012004-02-0909 February 2004 Er 05000313-04-301 on 01/12/2004 - 01/15/2004; Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination IR 05000368/20033012003-08-27027 August 2003 Er 05000368-03-301, on 07/11/03 - 07/18/03; Entergy Operations, Inc., Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination IR 05000368/20023012002-03-0505 March 2002 IR 05000368/2002-301, on 2/11-15/2002, Entergy Operations, Inc., Arkansas Nuclear One, Unit 2, Initial Examination of Applicants for Operator Licenses. Fifteen of Sixteen Applicants Satisfied the Requirements of 10 CFR Part 55 2022-06-15
[Table view] |
Text
February 20, 2009
Timothy G. Mitchell, Vice President, Operations Entergy Operations, Inc. Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1, NRC EXAMINATION REPORT 50-313; 2009-301/50-368;2009-301
Dear Mr. Mitchell:
On February 2, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a retake examination at Arkansas Nuclear One, Unit 1 Station. The enclosed report documents the examination findings, which were discussed on February 3, 2009, with Mr. Randall Martin, Unit 1 Operations Training Supervisor.
The retake examination included the reevaluation of one applicant for instant senior operator license for the Senior Reactor Operator written portion of the written examination. The examination was developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiner determined that the applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued.
No findings of significance were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Bernard W. Stapleton for Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6 UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc. - 2 -
Senior Vice President Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995 Senior Vice President & Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995
Manager, Licensing Entergy Operations, Inc. Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995 Chief, Radiation Control Section Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Section Chief, Division of Health Emergency Management Section Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Entergy Operations, Inc. - 3 -
David E. Maxwell, Director Arkansas Department of Emergency Management Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199 Pope County Judge Pope County Courthouse 100 West Main Street Russellville, AR 72801 Entergy Operations, Inc. - 4 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Jeffrey.Josey@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) ANO Site Secretary (Vicki.High@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
K. S. Fuller, RC OEMail Resource Senior Enforcement Specialist (Mark.Haire@nrc.gov) DRS STA (Dale.Powers@nrc.gov) OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)
OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)
ROPreports
File located: SUNSI Rev Compl. x Yes No ADAMS x Yes No Reviewer Initials TOMPublicly Avail x Yes No Sensitive Yes x No Sens. Type Initials TOM SOE OBC TOMcKernon/dch RELantz /RA/ /RA/ BSW for 2/20/09 2/20/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 - Enclosure EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION IV Dockets: 50-313, 50-368 Licenses: DPR-51, NPF-6 Report: 05000313/2009301, 05000368/2009301 Licensee: Entergy Operations, Inc.
Facility: Arkansas Nuclear One, Units 1 and 2 Location: Junction of Hwy. 64W and Hwy. 333 South Russellville, Arkansas Dates: January 26 through February 3, 2009 Inspectors: T. O. McKernon, Senior Operations Engineer, Operations Branch Approved By: Ryan E. Lantz, Chief, Operations Branch, Division of Reactor Safety
- 2 - Enclosure
SUMMARY OF FINDINGS
ER2009-301; January 26 - February 3, 2009; Arkansas Nuclear One, Unit 1 Station; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of one applicant for instant senior operator license at Arkansas Nuclear One, Unit 1 Station. The licensee developed the examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The facility proctors administered the retake written examination on January 27, 2009. The chief examiner determined that the applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued.
A. NRC-Identified and Self-Revealing Findings
No findings of significance were identified.
B. Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The NRC examiner reviewed the license application submitted to ensure the application reflected that the applicant satisfied relevant license eligibility requirements. The application was submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee." The chief examiner also audited the license application in detail to confirm that it accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings of significance were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
The facility proctors administered the retake written examination to the applicant on January 27, 2009. The applicant seeking an instant senior operator license participated in a written retake examination consisting of 25 SRO questions.
b. Findings
The applicant passed the examination. The text of the examination, the licensee's examination analysis, and the licensee's post-examination comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
.3 Initial Licensing Examination Development
a. Examination Scope
The licensee developed the examination in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were on a security agreement. The licensee submitted the outline for the examination on November 17, 2008. The NRC reviewed the outline against the requirements and provided comments to the licensee. The licensee also submitted the draft examination package on November 17, 2008. The NRC reviewed the draft examination package against the requirements and provided comments to the licensee on the examination on December 21, 2008. The licensee satisfactorily completed comment resolution on January 20, 2009.
b. Findings
The NRC approved the initial examination outlines and advised the licensee to proceed with development of the SRO portion of the written examination. All other portions of the examination had been waived since the applicant had passed these portions in the 2008 initial license examination.
The chief examiner determined that the examination initially submitted by the licensee was within the range of acceptability expected for a proposed examination.
No findings of significance were identified.
.4 Examination Security
a. Examination Scope
The NRC examiner reviewed examination security for examination development and during the examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings of significance were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. R. Martin, Unit 1, Operations Training Supervisor, on February 3, 2009. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Martin, Unit 1, Operations Training Supervisor
- D. Thompson, Training Instructor
ADAMS DOCUMENTS REFERENCED