MONTHYEARIR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) ML23090A1242023-04-0505 April 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000220/2023011 and 05000410/2023011 IR 05000220/20220062023-03-0101 March 2023 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) IR 05000220/20220052022-08-31031 August 2022 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) IR 05000220/20210062022-03-0202 March 2022 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) IR 05000220/20210052021-09-0101 September 2021 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000220/20200062021-03-0303 March 2021 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) IR 05000220/20190062020-03-0303 March 2020 Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2019006 and 05000410/2019006) ML19344D0232019-12-0909 December 2019 Ti 2515/194 Inspection Documentation Request IR 05000220/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000220/2019005 and 05000410/2019005) IR 05000220/20180062019-03-0404 March 2019 Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2018006 and 05000410/2018006) ML18348A5322018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000220/2019403 and 05000410/2019403 IR 05000220/20180052018-08-28028 August 2018 LLC, Units 1 and 2 Updated Inspection Plan: Inspection Report 05000220/2018005 and 05000410/2018005 IR 05000220/20170062018-02-28028 February 2018 Annual Assessment Letter for Nine Mile Point Nuclear Station LLC, Units 1 and 2 (Report 05000220/2017006 and 05000410/2017006, Report 05000220/2017402 and 05000410/2017402, and Report 05000220/2017501 and 05000410/2017501) IR 05000220/20170052017-08-28028 August 2017 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 - Inspection Report 05000220/2017005 and 05000410/2017005 IR 05000220/20160062017-03-0101 March 2017 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2016006 and 05000410/2016006) IR 05000220/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, Report 05000220/2016005 and 05000410/2016005 IR 05000220/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2015006 and 05000410/2015006) IR 05000220/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220/2015005 and 05000410/2015005) ML15084A3432015-03-25025 March 2015 Notification of Conduct Triennial Fire Protection Baseline Inspection IR 05000220/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220/2014001 and 05000410/2014001)(w/Inspection Plan) IR 05000220/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220-14-006 and 05000410-14-006) IR 05000220/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220/2013001 and 05000410/2013001)(w/Inspection Plan) IR 05000220/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220-13-006 and 05000410-13-006) IR 05000220/20120012013-03-0404 March 2013 Annual Assessment Letter for Nine Mile Point Nuclear Station Units 1 & 2 (Report 05000220/2012001 and 05000410/2012001) ML12244A3272012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Nine Mile Point Nuclear Station Units 1 and 2 IR 05000220/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000220/2011001 and 05000440/2011001) ML1124207972011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Nine Mile Point Nuclear Station Units 1 and 2 IR 05000220/20100012011-03-0404 March 2011 Annual Assessment Letter for Nine Mile Point Nuclear Station (Report 05000220/2010001 and 05000410/2010001 ML1024401282010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Nine Mile Point Nuclear Station ML1006205312010-03-0303 March 2010 Annual Assessment Letter - Nine Mile Point IR 05000220-10-001 & 050004110-10-001) IR 05000041/20100102010-03-0303 March 2010 Annual Assessment Letter - Nine Mile Point IR 05000220-10-001 & 050004110-10-001) ML0924403112009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station, Dated 09/01/09 IR 05000220/20090012009-03-0404 March 2009 IR 05000220-09-001 and 05000410-09-001, Nine Mile Point Nuclear Station, LLC, Annual Assessment Letter, Dated March 4, 2009 IR 05000220/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Nine Mile Point, (IR 050000220-08-001 and 05000410-08-001) ML0806100122008-03-0303 March 2008 2007 Annual Assessment Letter EOC 2007 ROP8 - Nine Mile Point (05000220-08-001, 05000410-08-001) ML0734709612007-12-13013 December 2007 ROP8 - Nine Mile Point - Change to Inspection Plan, 12/13/07 ML0724309152007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station IR 05000220/20070012007-03-0202 March 2007 Annual Assessment Letter - Nine Mile Point Nuclear Station (Report 05000220-07-001 and 05000410-07-001) ML0624305022006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station ML0606202732006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Nine Mile Point Nuclear Station (Report 05-220/2006001 and 05-410/2006001) ML0524206882005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station IR 05000220/20050012005-03-0202 March 2005 Annual Assessment Letter - Nine Mile Point (Report 05000220/2005001 and 05000410/2005001)) ML0424406052004-08-30030 August 2004 2004 Nine Mile Point Mid-Cycle Performance Review and Inspection Plan ML0306202032003-03-0303 March 2003 2003 Annual Assessment Letter - Nine Mile Point Nuclear Station ML0223501892002-08-23023 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station IR 05000220/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Nine Mile Point Nuclear Station (Report 50-220/02-01 and 50-410/02-01) 2023-08-31
[Table view] Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] |
Text
August 28, 2018
SUBJECT:
NINE MILE POINT NUCLEAR STATION LLC, UNITS 1 AND 2 UPDATED INSPECTION PLAN:
INSPECTION REPORT 05000220/2018005 AND 05000410/2018005
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Nine Mile Point Nuclear Station LLC Unit s 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 71003, "Post Approval Site Inspection For License Renewal," for Nine Mile Point Unit 1 and IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," at your facilit y. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room
). Please contact me at 610-337-5108 with any questions you have regarding this letter.
Sincerely,
/RA/ Christopher G.
Cahill , Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.
50-220 and 50-410 License Nos.
DPR-6 3 and NPF-69 Enclosure:
Inspection Plan cc: Distribution via ListServ SUBJECT: NINE MILE POINT NUCLEAR STATION LLC, UNITS 1 AND 2 UPDATED INSPECTION PLAN:
INSPECTION REPORT 05000220/2018005 AND 05000410/2018005 DATED AUGUST 28, 2018 DISTRIBUTION
- DLew, RA (R1ORAMAIL RESOURCE)
JGiessner, DRA (R1ORAMAIL RESOURCE)
RLorson, DRP (R1DRPMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
MFerdas, DRP CCahill, DRP ARosebrook, DRP SObadina, DRP EMiller, DRP, SRI BSienel, DRP, RI ATrudell, DRP, AA JBowen, RI OEDO RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1 Resource ROPReports Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-19 Second Quarter Process
\BRANCH 1\Nine Mile Point 2nd Quarter ASM letter.docx ADAMS ACCESSION NUMBER:
ML18221A250 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook CCahill DATE 8/8/18 8/8/18 OFFICIAL RECORD CO PY Nine Mile Point07/01/2018 - 06/30/2020UnitStart EndActivityCACTitleStaff CountEP PROGRAM INSPECTION 11, 207/16/201807/20/2018IP 71114.02 000717Alert and Notification System Testing1, 207/16/201807/20/2018IP 71114.03 000718Emergency Response Organization Staffing and Augmentation System1, 207/16/201807/20/2018IP 71114.05 000720Correction of Emergency Preparedness Weaknesses and Deficiencies1, 207/16/201807/20/2018IP 71151 001397Performance Indicator VerificationRADWASTE 11, 207/23/201807/27/2018IP 71124.08 000732Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and TransportationRAD INSTRUNMENTATION 11, 208/06/201808/10/2018IP 71124.05 000729Radiation Monitoring InstrumentationTRIENNIAL FIRE PROTECTION 6 109/10/201809/14/2018IP 71111.05T 000696Fire Protection (Triennial)
209/10/201809/14/2018IP 71111.05XT 000697Fire Protection - NFPA 805 (Triennial)
109/24/201809/28/2018IP 71111.05T 000696Fire Protection (Triennial)
209/24/201809/28/2018IP 71111.05XT 000697Fire Protection - NFPA 805 (Triennial)RAD SAFETY INSPECTION 11, 210/15/201810/19/2018IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 210/15/201810/19/2018IP 71124.02 000726Occupational ALARA Planning and Controls1, 210/15/201810/19/2018IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 210/15/201810/19/2018IP 71124.04 000728Occupational Dose Assessment1, 210/15/201810/19/2018IP 71151 000746Performance Indicator VerificationACCESS CONTROL, EQUIP PERF, TRAINING 31, 210/15/201810/19/2018IP 71130.02 000734Access Control1, 210/15/201810/19/2018IP 71130.04 000736Equipment Performance, Testing, and Maintenance1, 210/15/201810/19/2018IP 71130.07 000739Security Training1, 210/15/201810/19/2018IP 71151 001338Performance Indicator VerificationNMP1 REQUAL INSP W/ P/F RESULTS 2 110/29/201811/02/2018IP 71111.11A 000703Licensed Operator Requalification Program and Licensed Operator Performance (Annual)8/7/2018 3:11:31 PMPage 1 of 4This report does not include INPO and OUTAGE activities.This report shows only on-site and announced inspection procedures.IP 22 Inspection Activity Plan Report Nine Mile Point07/01/2018 - 06/30/2020UnitStart EndActivityCACTitleStaff CountNMP1 REQUAL INSP W/ P/F RESULTS 2 110/29/201811/02/2018IP 71111.11B 000704Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)NMP1 INITIAL OL EXAM 4 111/05/201811/09/2018 OV 000956VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
112/03/201812/14/2018EXAD 000500LICENSE EXAM ADMINISTRATION (EXAD)NMP UNIT 1 - LICENSE RENEWAL PHASE 4 2 102/25/201903/01/2019IP 71003 000687Post-Approval Site Inspection for License RenewalINSERVICE INSPECTION - UNIT 1 1 103/25/201903/29/2019IP 71111.08G 000701Inservice Inspection Activities (BWR)RAD SAFETY OUT 11, 204/01/201904/05/2019IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 204/01/201904/05/2019IP 71124.02 000726Occupational ALARA Planning and Controls1, 204/01/201904/05/2019IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 204/01/201904/05/2019IP 71124.04 000729Occupational Dose Assessment50.59 PROCESS 31, 204/22/201904/26/2019IP 71111.17T 000709Evaluations of Changes, Tests, and ExperimentsRAD SAFETY 01,02,03,04 11, 205/20/201905/24/2019IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 205/20/201905/24/2019IP 71124.02 000726Occupational ALARA Planning and Controls1, 205/20/201905/24/2019IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 205/20/201905/24/2019IP 71124.04 000729Occupational Dose AssessmentACCESS CONTROL, PROTECTIVE STRATEGY, TSR 41, 205/20/201905/24/2019IP 71130.02 000734Access Control1, 205/20/201905/24/2019IP 71130.05 000737Protective Strategy Evaluation1, 205/20/201905/24/2019IP 71130.14 000743Review of Power Reactor Target Sets1, 205/20/201905/24/2019IP 71151 001338Performance Indicator Verification8/7/2018 3:11:31 PMPage 2 of 4This report does not include INPO and OUTAGE activities.This report shows only on-site and announced inspection procedures.IP 22 Inspection Activity Plan Report Nine Mile Point07/01/2018 - 06/30/2020UnitStart EndActivityCACTitleStaff CountCYBER FULL IMP 21, 206/03/201906/07/2019IP 71130.10P 000741Cyber Security1, 206/17/201906/21/2019IP 71130.10P 000741Cyber SecurityISFSI Loading Campaign Inspection 21, 207/22/201907/26/2019IP 60855 001001Operation Of An ISFSI1, 207/22/201907/26/2019IP 60855.1 000590Operation of an Independent Spent Fuel Storage Installation at Operating PlantsRAD SAFETY 01,02,03,04 11, 207/22/201907/26/2019IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 207/22/201907/26/2019IP 71124.02 000726Occupational ALARA Planning and Controls1, 207/22/201907/26/2019IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 207/22/201907/26/2019IP 71124.04 000729Occupational Dose Assessment1, 207/22/201907/26/2019IP 71151 000746Performance Indicator VerificationNMP EP EXERCISE INSPECTION 51, 207/29/201908/02/2019IP 71114.01 000716Exercise EvaluationHeat Sink 11, 208/05/201908/09/2019IP 71111.07T 000700Heat Sink Performance -TriennialPI&R BIENNIAL 41, 208/12/201908/16/2019IP 71152B 000747Problem Identification and Resolution1, 208/26/201908/30/2019IP 71152B 000747Problem Identification and ResolutionRAD SAFETY REMP 11, 209/09/201909/13/2019IP 71124.07 000731Radiological Environmental Monitoring Program1, 209/09/201909/13/2019IP 71151 000746Performance Indicator VerificationNMP2 REQUAL INSP W/ P/F RESULTS 2 210/21/201910/25/2019IP 71111.11A 000703Licensed Operator Requalification Program and Licensed Operator Performance (Annual)210/21/201910/25/2019IP 71111.11B 000704Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)8/7/2018 3:11:31 PMPage 3 of 4This report does not include INPO and OUTAGE activities.This report shows only on-site and announced inspection procedures.IP 22 Inspection Activity Plan Report Nine Mile Point07/01/2018 - 06/30/2020UnitStart EndActivityCACTitleStaff CountEQ PROGRAM 31, 210/21/201910/25/2019IP 71111.21N 000714Design Bases Assurance Inspection (Programs)1, 211/04/201911/08/2019IP 71111.21N 000714Design Bases Assurance Inspection (Programs)NMP2 INITIAL OL EXAM 4 211/11/201912/06/2019 OV 000956VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
212/09/201912/20/2019EXAD 000500LICENSE EXAM ADMINISTRATION (EXAD)Rad Safety Refuel 11, 203/02/202003/06/2020IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 203/02/202003/06/2020IP 71124.02 000726Occupational ALARA Planning and Controls1, 203/02/202003/06/2020IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 203/02/202003/06/2020IP 71124.04 000729Occupational Dose AssessmentISI - UNIT 2 1 203/09/202003/13/2020IP 71111.08G 000701Inservice Inspection Activities (BWR)Rad Safety RETS 11, 205/18/202005/22/2020IP 71124.06 000730Radioactive Gaseous and Liquid Effluent Treatment1, 205/18/202005/22/2020IP 71151 000746Performance Indicator VerificationAccess Control, Equipment Testing and Maintenance, Training 31, 206/01/202006/05/2020IP 71130.02 000734Access Control1, 206/01/202006/05/2020IP 71130.04 000736Equipment Performance, Testing, and Maintenance1, 206/01/202006/05/2020IP 71130.07 000739Security Training1, 206/01/202006/05/2020IP 71151 001338Performance Indicator VerificationRad Safety Inspection 11, 206/08/202006/12/2020IP 71124.01 000725Radiological Hazard Assessment and Exposure Controls1, 206/08/202006/12/2020IP 71124.02 000726Occupational ALARA Planning and Controls1, 206/08/202006/12/2020IP 71124.03 000727In-Plant Airborne Radioactivity Control and Mitigation1, 206/08/202006/12/2020IP 71124.04 000729Occupational Dose Assessment8/7/2018 3:11:31 PMPage 4 of 4This report does not include INPO and OUTAGE activities.This report shows only on-site and announced inspection procedures.IP 22 Inspection Activity Plan Report