ENS 54870
ENS Event | |
---|---|
13:56 Jul 23, 2020 | |
Title | 60-Day Optional Telephonic Notification for Two Invalid Containment Ventilation Isolation Actuations |
Event Description | This 60-day telephone notification is being submitted in accordance with paragraphs 10 CFR 50.73(a)(1) and 50.73(a)(2)(iv)(A) to report two invalid Containment Ventilation Isolation (CVI) actuations at Watts Bar Nuclear Plant (WBN) Unit 1.
On July 23, 2020, at 0956 Eastern Daylight Time (EDT), the Train A CVI actuated due to an invalid high radiation signal from 1-RM-90-130, Containment Purge Air Exhaust Monitor. Upon investigation, the high radiation signal was caused by a failed power supply. Corrective action included replacing the power supply, 1-RM-90-130 detector, and restoring the system to service. On August 7, 2020, at 2017 EDT, the Train A CVI actuated due to an invalid high radiation signal from 1-RM-90-130, Containment Purge Air Exhaust Monitor. Upon investigation, a small tear was identified in the foil covering the scintillation detector. This defect caused erratic indication and the system actuation. The foil was replaced and the system was restored to service. Prior to and following the invalid high radiation alarms, all radiation monitors except 1-RM-90-130 were stable at their normal values; therefore, the CVI was invalid. Control room operators performed appropriate checks and confirmed that all required automatic actuations occurred as designed. These events were entered into the corrective action program as CR 1625135 and CR 1628904. The NRC Resident Inspector was notified. |
Where | |
---|---|
Watts Bar Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+937.57 h39.065 days <br />5.581 weeks <br />1.284 months <br />) | |
Opened: | Mike Bruchey 15:30 Aug 31, 2020 |
NRC Officer: | Brian Lin |
Last Updated: | Aug 31, 2020 |
54870 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 562742022-11-24T21:21:00024 November 2022 21:21:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-DAY Optional Telephonic Notification of Invalid Actuation of Containment Ventilation Isolation Valves ENS 548702020-07-23T13:56:00023 July 2020 13:56:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for Two Invalid Containment Ventilation Isolation Actuations ENS 542202019-07-26T14:03:00026 July 2019 14:03:00 10 CFR 50.73(a)(1), Submit an LER Invalid Containment Ventilation Isolation Actuation ENS 538402018-12-02T05:28:0002 December 2018 05:28:00 10 CFR 50.73(a)(1), Submit an LER Invalid Containment Ventilation Isolation Actuation ENS 527902017-04-28T09:00:00028 April 2017 09:00:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Auxiliary Feedwater Actuation ENS 525392016-12-15T18:32:00015 December 2016 18:32:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Optional Telephonic Notification for an Invalid Containment Ventilation Isolation Actuation ENS 520012016-04-14T18:06:00014 April 2016 18:06:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Containment Vent Isolation Actuation ENS 511522015-04-15T16:07:00015 April 2015 16:07:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuations of the Containment Ventilation Isolation System ENS 510792015-03-17T17:06:00017 March 2015 17:06:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Auxiliary Feedwater System During Electrical Testing ENS 501332014-04-16T05:48:00016 April 2014 05:48:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for Inadvertent Fast Start of Diesel Generator During Testing ENS 482042012-06-19T03:49:00019 June 2012 03:49:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Containment Ventilation Isolation ENS 441602008-02-23T04:00:00023 February 2008 04:00:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Verbal Notification of Invalid Specified System Actuation ENS 411832004-09-15T14:14:00015 September 2004 14:14:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Containment Vent Isolation Valve 2022-11-24T21:21:00 | |