| event date = 03/28/2016 13:22 PDT
| event date = 03/28/2016 13:22 PDT
| last update date = 03/28/2016
| last update date = 03/28/2016
| title = Manual Scram Following Loss Of Reactor Closed Cooling
| title = Manual Scram Following Loss of Reactor Closed Cooling
| event text = At 1322 PDT on Monday, March 28, 2016, Columbia Generating Station was manually scrammed from 100% thermal power due to the loss of Reactor Closed Cooling (RCC). Manual scram of the unit is procedurally required upon loss of RCC. The cause of the loss of RCC is being investigated.
| event text = At 1322 PDT on Monday, March 28, 2016, Columbia Generating Station was manually scrammed from 100% thermal power due to the loss of Reactor Closed Cooling (RCC). Manual scram of the unit is procedurally required upon loss of RCC. The cause of the loss of RCC is being investigated.
Regulation 10 CFR 50.72(b)(2)(iv)(B) requires reporting within 4 hours of any event or condition that results in actuation of the Reactor Protection System (RPS) when the reactor is critical.
Regulation 10 CFR 50.72(b)(2)(iv)(B) requires reporting within 4 hours of any event or condition that results in actuation of the Reactor Protection System (RPS) when the reactor is critical.

Latest revision as of 21:45, 1 March 2018

ENS 51826 +/-
Where
Columbia Generating Station Energy Northwest icon.png
Washington (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
LER: 05000397/LER-2016-001
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />)
Opened: Tracy Howard
19:44 Mar 28, 2016
NRC Officer: Donald Norwood
Last Updated: Mar 28, 2016