ENS 51762

From kanterella
Revision as of 21:45, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 51762 +/-
Where
Seabrook NextEra Energy icon.png
New Hampshire (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000443/LER-2016-001
Time - Person (Reporting Time:+-3.43 h-0.143 days <br />-0.0204 weeks <br />-0.0047 months <br />)
Opened: Andy Caramihalis
04:27 Mar 2, 2016
NRC Officer: Mark Abramovitz
Last Updated: Mar 2, 2016
51762 - NRC Website