ENS 48778

From kanterella
Revision as of 22:01, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 48778 +/-
Where
Sequoyah Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.75 h-0.0729 days <br />-0.0104 weeks <br />-0.0024 months <br />)
Opened: Matthew Leenerts
15:20 Feb 24, 2013
NRC Officer: Vince Klco
Last Updated: Feb 24, 2013
48778 - NRC Website