| title = Two Out | | title = Two Out of Three Auxiliary Feedwater Pumps Out of Service | ||
| event text = A pinhole leak was discovered on B train Essential Service Water (ESW) system piping while preparing the pipe surface for non-destructive examination. Control room personnel were notified of the leak at 1435. B ESW was immediately declared inoperable. At the time of control room notification, surveillance testing on the Turbine Driven Auxiliary Feedwater Pump (TDAFP) was in progress. This surveillance testing made the TDAFP inoperable and non-functional. The surveillance activities were terminated and the TDAFP was returned to operable status at 1438. | | event text = A pinhole leak was discovered on B train Essential Service Water (ESW) system piping while preparing the pipe surface for non-destructive examination. Control room personnel were notified of the leak at 1435. B ESW was immediately declared inoperable. At the time of control room notification, surveillance testing on the Turbine Driven Auxiliary Feedwater Pump (TDAFP) was in progress. This surveillance testing made the TDAFP inoperable and non-functional. The surveillance activities were terminated and the TDAFP was returned to operable status at 1438. | ||
B ESW is the safety related water source for B train of auxiliary feedwater (AFW). For the three minute period between notification of the pinhole leak until the TDAFP was restored to operable status, there were two auxiliary feed pumps inoperable. This met the conditions for entry into T/S LCO Action 3.7.5.D which requires a plant shut down to Hot Standby within 6 hours. This action was exited when the TDAFP surveillance testing was terminated. Additionally, with 2 of 3 auxiliary feedwater pumps non-functional for 3 minutes, there was a condition which could have prevented fulfillment of a safety function for those 3 minutes. | B ESW is the safety related water source for B train of auxiliary feedwater (AFW). For the three minute period between notification of the pinhole leak until the TDAFP was restored to operable status, there were two auxiliary feed pumps inoperable. This met the conditions for entry into T/S LCO Action 3.7.5.D which requires a plant shut down to Hot Standby within 6 hours. This action was exited when the TDAFP surveillance testing was terminated. Additionally, with 2 of 3 auxiliary feedwater pumps non-functional for 3 minutes, there was a condition which could have prevented fulfillment of a safety function for those 3 minutes. |
Latest revision as of 22:16, 1 March 2018
Where | |
---|---|
Callaway Missouri (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+2.78 h0.116 days <br />0.0165 weeks <br />0.00381 months <br />) | |
Opened: | Mark Covey 22:22 Mar 14, 2007 |
NRC Officer: | Jason Kozal |
Last Updated: | May 4, 2007 |