Control Room Emergency Filtration System
From kanterella
Revision as of 22:12, 25 March 2017 by
StriderTol
(
talk
|
contribs
)
(Created page with " {{System-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Initiation and Control
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Mechanical Pressure Regulator
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
Qualified Safety Parameter Display System
Reactor Building Closed Loop Cooling
Reactor Building Ventilation
Reactor Coolant System
Reactor Core Isolation Cooling
Reactor Enclosure Recirculation System
Reactor Pressure Vessel
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
ML23313A165
16 November 2023
Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 28, 2023
IR 05000354/2023003
Hope Creek
7 November 2023
Integrated Inspection Report 05000354/2023003
ML23319A073
Farley
31 October 2023
1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23263A985
Vogtle
12 October 2023
Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing
ML23082A309
10 October 2023
DG-1389 (RG 1.183 Rev 1) Public Comment Resolution Table
ML23243B014
31 August 2023
Rev. 1 Public Comment Resolution (Pre-decisional) ACRS Version
IR 05000424/2023011
Vogtle
11 August 2023
Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011
IR 05000397/2023002
Columbia
1 August 2023
Integrated Inspection Report 05000397/2023002
ML23158A018
Vogtle
31 July 2023
Issuance of Amendments Nos. 219 and 202, Regarding Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490
IR 05000400/2023002
Harris
24 July 2023
Integrated Inspection Report 05000400/2023002
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties