Clinton: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 6: | Line 6: | ||
|state=Illinois | |state=Illinois | ||
|town=Clinton | |town=Clinton | ||
|ISFSI docket=07201046 | |||
|mapping location=40° 10' 22.30" N, 88° 49' 59.52" W | |mapping location=40° 10' 22.30" N, 88° 49' 59.52" W | ||
|company=Exelon | |company=Exelon |
Revision as of 11:32, 11 January 2019
Plant | |
---|---|
Company | Exelon |
Where | Clinton, Illinois |
Regulatory | |
Region | NRC Region 3 |
ISFSI docket | 07201046 |
wikipedia link | |
Docket | 05000461 |
---|---|
Licensed Power Level (Thermal) | 3,473 MWt |
Unit type | GE-6 |
Containment | Mark III |
Status | |
NRC Website | |