10 CFR 50.23, Construction Permits

From kanterella
Revision as of 11:18, 9 December 2016 by StriderTol (talk | contribs) (Reverted edits by 157.55.39.207 (talk) to last revision by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Construction permits A construction permit for the construction of a production or utilization facility will be issued before the issuance of a license if the application is otherwise acceptable, and will be converted upon completion of the facility and Commission action, into a license as provided in § 50.56. However, if a combined license for a nuclear power reactor is issued under part 52 of this chapter, the construction permit and operating license are deemed to be combined in a single license. A construction permit for the alteration of a production or utilization facility will be issued before the issuance of an amendment of a license, if the application for amendment is otherwise acceptable, as provided in § 50.91.

Federal Register

, as amended at 35 FR 11461, July 17, 1970; 72 FR 49490, Aug. 28, 2007]


External Links

NRC website 10 CFR 50.23