05000400/FIN-2018001-01

From kanterella
Revision as of 08:59, 30 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Harris Duke energy icon.png
Report IR 05000400/2018001 Section 1R05
Date counted Mar 31, 2018 (2018Q1)
Type: URI:
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.05
Inspectors (proximate) J Zeiler
A Patz
J Dodson
S Rose
INPO aspect
'