05000336/FIN-2018003-01
Jump to navigation
Jump to search
Site: | Millstone |
---|---|
Report | IR 05000336/2018003 Section 1R15 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | J Fuller L Mckown C Highley K Mangan H Anagnostopoulos L Dumont B Haagensen D Schroeder |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion VII, Control of Purchased Material, Equipment, and Services |
INPO aspect | |
' | |