05000313/FIN-2018003-01
Jump to navigation
Jump to search
Site: | Arkansas Nuclear |
---|---|
Report | IR 05000313/2018003 Section 1R04 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | C Henderson M Tobin T Sullivan S Bussey R Deese P Elkmann M Hayes N Hernandez J Kirkland C Osterholtz G Pick N O'Keefe |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |