05000298/FIN-2018011-04

From kanterella
Revision as of 18:35, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
04
Site: Cooper Entergy icon.png
Report IR 05000298/2018011 Section 1R21
Date counted Jun 30, 2018 (2018Q2)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21M
Inspectors (proximate) G George
W Cullum
R Deese
S Hedger
M Riley
J Leivo
M Yeminy
T Farnholtz
Violation of: 10 CFR 50 Appendix B

10 CFR 50 Appendix B Criterion III, Design Control
INPO aspect
'