05000293/FIN-2018003-01

From kanterella
Revision as of 01:29, 4 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Pilgrim
Report IR 05000293/2018003 Section 1R19
Date counted Sep 30, 2018 (2018Q3)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: NRC identified
Inspection Procedure: IP 71111.19
Inspectors (proximate) E Carfang
B Pinson
P Boguszewski
B Deboer
O Masnyk-Bailey
K Mangan
S Wilson
M Hardgrove
Z Hollcraft
J Dolecki
A Dimitriadis
Violation of: Technical Specification
CCA H.9, Training
INPO aspect CL.4
'