05000272/FIN-2018003-03
From kanterella
Revision as of 01:29, 4 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | This violation of very low safety significant was identified by PSEG, has been entered into PSEGs CAP, and is being treated as a Green NCV, consistent with Section 2.3.2 of the Enforcement Policy. Violation: 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires activities affecting quality shall be prescribed by procedures, and shall be accomplished in accordance with these procedures. PSEG procedure MA-AA-716-011, Work Execution and Closeout, Revision 17, step 4.13.5, required order operations to be completed after the preventive maintenance WO was taken Technically Complete, or TECOd. Contrary to the above, preventive maintenance WOs 30319825 and 30320738 were TECOd by mechanical maintenance, on March 2 and April 9, 2018, respectively, without completing all of the WO operations. Specifically, maintenance technicians performed the monthly thermography on the 22 chiller evaporator divider plate gasket and took the preventive maintenance work order TECO and did not perform MA-AA-716-011, step 4.13.5to complete operation 0020 by notifying engineering that the thermography results were available for review. Consequently, leakage past the divider plate gasket went undetected from March 2 to April 30, 2018, until quarterly compressor thermography detected crankcase temperature above the action level on April 30, 2018. Maintenance immediately notified Operations of the elevated compressor temperature, and the 22 chiller was declared inoperable and removed from service emergently on April 30, 2018. Subsequent disassembly and inspection revealed internal compressor damage and pieces of the evaporator divider plate gasket in the compressor filter housing. PSEG replaced the compressor and restored the 22 chiller to OPERABLE on May 4, 2018 |
Site: | Salem |
---|---|
Report | IR 05000272/2018003 Section 4OA2 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | P Finney A Ziedonis J Furia F Bower |
Violation of: | 10 CFR 50 Appendix B Criterion V |
INPO aspect | |
' | |
Finding - Salem - IR 05000272/2018003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Salem) @ 2018Q3
Self-Identified List (Salem)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||