05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement

From kanterella
Revision as of 01:48, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirements
ML20134J865
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/01/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129H354 List:
References
B15977, NUDOCS 9611180108
Download: ML20134J865 (2)


LER-2096-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirements
Event date:
Report date:
2452096053R00 - NRC Website

text

.

I l

'i

  • Northeast etaae omcc. . nope rerry na., weierfora, er

," l Utilities System 3 o m,,128

. i Waterford. Cr 06385-0128 l

(203) 447-1791 1

- November 1,1996 _

pocket No. 50445 m j

    • SP336 l 50-423 j B15977 l 4

Re: 10CFR50.73(a)(2)(i)  ;

U.S. Nuclear Regulatory Commission )

3 Document Control Desk l Washington, DC 20555 I 1

1

! This letter forwards Licensee Event Report (LER) 96-053-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on October 2,1996. This event is l reportable for all three Millstone units and this LER is submitted pursuant to 10CFR50.73(a)(2)(i).

! The following is Northeast Nuclear Energy Company's (NNECO's) commitment made within this letter. All other statements made within this letter are for information only.

B15977-1 NNECO will develop necessary procedures to perform monthly source checks for these monitors or properly document an appropriate alternative method of satisfying the surveillance requirement prior to April 1,1997. The instrument calibrations will be performed monthly to satisfy Technical Specification source  ;

check requirements until adequate procedures for source checks are developed. l l

B15977-2 NNECO will review the applicability of this event at the other Millstone units to )

ensure that Technical Specification source check requirements are properly met by l December 10,1996. l Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY j -

P. D. Hinnenkamp Director, Unit Operations Q

Attachment:

LER 96-053-00

' T 'i *J . 1 i

9611100108 961101 1 PDR ADOCK 05000245 l 6 PDR l OS3422-# Ri n IN, 050038

= .. - _ .

l [7. _ . _ - .

[s- -

i t

s i U.S. Nuclear Regulatory Commission i B15977\Page 2 of 2' o  !

cc: H. J. Miller, Region I Administrator i T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 J. W. Andersen, NRC Project Manager, Millstone Unit No.1 D. P. Beaulieu, Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3  !