W3F1-2020-0006, Re-Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 22 / Refuel 22

From kanterella
Jump to navigation Jump to search
Re-Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 22 / Refuel 22
ML20034G722
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/03/2020
From: Wood P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2020-0006
Download: ML20034G722 (5)


Text

  • Ente,gy Entergy Operations, Inc.

17265 River Road Kill on a, LA 70057 -3093 Tel 504 464 3786 Paul Wood Manager - Regulatory Assurance Waterford 3 W3F1 -2020-0006 February 3, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Re-Submittal of Owner's Activity Report Form for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 Renewed Facility Operating License No. NPF-38

Reference:

Entergy Operations, Inc. Letter to U.S. Nuclear Regulatory Commission, "Submittal of Owner's Activity Report Form for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22", (ADAMS Accession No. ML19165A083), dated June 13, 2019)

Attached is a revised report which covers the Owner's Activity Report Form, OAR-1, for Waterford 3 Operating Cycle 22 / Refuel 22, enclosed as Attachment 1. This report is being re-submitted due to an Authorized Nuclear lnservice Inspector (ANII) audit that disclosed minor errors within inspection interval and period, date and revision of inspection plans, and code cases not documented on this report. The revised OAR-1 form is enclosed. A copy of this letter and the attached revised report is also being submitted to the office of the Louisiana State Fire Marshall.

There are no new commitments contained in this submittal.

Please contact Paul Wood, Regulatory Assurance Manager, at (504) 464-3786 should you have any questions regarding this submittal.

Respectfully,

~.uJ~

PW/lib

Attachment:

Revised Owner's Activity Report for lnservice Inspection Performed During Operating Cycle 22/ Refuel 22 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford 3 NRC Project Manager -Waterford 3 Mr. H. "Butch" Browning, Jr.

Office of the State Fire Marshall 8181 Independence Blvd.

Baton Rouge, LA 70806

ATTACHMENT 1 To W3F1 -2020-0006 Revised Owner's Activity Report for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22

REVISED FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _c_y_c_le_22_1_R_e_fu_e_1_2_2_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Plant _ _ _ _ _ _ _ _ _ _ _ _ w_a_t_e_rfo_r_d_S_t_e_am_E_l_e_ct_ri_c_S_ta_t_io_n_,_1_72_6_5_R_iv_e_r_R_o_a_d_,K_i_llo_n_a_,_L_A_7_0_0_5_7_ _ _ _ _ _ _ _ _ __

Unit No. _ _ _ _ _ _ _3_ _ _ _ _ _ _ Commercial service date _ _ _ _ 09/24/1985

_ _ _ _ _ _ _ Refueling outage no. _ _ _ 22 (if applicable)

Applicable inspection interval _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _4_t_h_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(1st, 2nd, 3rd, 4th, other)

Applicable inspection period _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1_st_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(1st. 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans _ _ _2_0_01_Ed_it_io_n_T_hr_ou_g_h_2_00_3_A_d_de_n_d_a._2_oo_?_E_d_iti_on_T_h_ro_u_g_h_2o_o_a_A_dd_e_n_da_ __

Date and revision of inspection plans _ _ _ _ _ _ _ _ _ _ _ 1 _11_30_l_2_01_7_R_ev_is_io_n_00_7_S_E_P_-_1S_l_-1_0_4_ _ _ _ _ _ _ _ _ __

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and evaluation: _ _ _ _ _ _ _ _ _N_-5_3_2_-_s._N_-_6_3_8_-6_._N_-_6_5_3_-1_,_N_-_7_4_0-_2_._N_-_7_70_-_2_ _ _ _ _ _ _ __

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of ______R_e_f_u_el_2_2_ _ _ _ _ _ conform (refueling outage number) to the requirements of the ASME Code, Section XI.

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT by have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal r property damage r lo s of any kind arising from or connected with this inspection.

~~~~~~ Commission_____.__~_°{_7~_:.L_W _ _ _ _ _ __

(National Board Number and Endorsement)

(07/15)

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Date Repair/Replacement Code Class Item Description Work Completed Plan Number Perform weld overlay in accordance with 1 1RC2-46RL 1A 5/23/2019 19-RR-07 EC-81233 and WSI traveler Perform weld overlay in accordance with 1 1RC2-48RL2A 5/23/2019 19-RR-08 EC-81233 and WSI traveler 3CC1 1/2-17 A1 (RCP 1A SEAL COOLER INLET Repair Pipe Leak 3 FAIL SAFE TUBING.) CR-WF3-2019-5316 6/11/2019 19-RR-02