Text

Union Electric PO Box 620 Callaway Plant Fulton, MO 65251 December 9, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-05237 wAmereU Ladies and Gentlemen:

U1E DOCKET NUMBER 50483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 SPECIAL REPORT Inoperable Channel 5 of the Loose Parts Detection System (LPDS)

Attached please find a Special Report for the inoperability of Channel 5 of the Loose Parts Detection System (LPDS) in accordance with Final Safety Analysis Report Section 16.3.3.5 Action 'a'.

New commitments are identified in this correspondence. None of the material in this response is considered proprietary by Union Electric.

If you have any questions or require additional information, please contact Mr. Mark Reidmeyer, Supervisor, Regional Regulatory Affairs at 573/676-4306.

g0, ChrisR/ ne Manager, Callaway Plant Enclosure Enclosures 1) Special Report a subsidiary ofAmeren Corporation

f

  • v'7 ULNRC-05237 December 9, 2005 Page 2 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Ron Reynolds Director Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102

ULNRC-05237 December 9, 2005 Page 3 bcc: C. D. Naslund C. R. Younie K. D. Young G. A. Hughes D. E. Shafer (470) (2 copies)

S. L. Gallagher (100)

S. L. KMang (NSRB)

M. A. Reidmeyer E. W. Henson A 160.0761 Ms. Diane M. Hooper Mr. Dennis Buschbaum Supervisor, Licensing TXU Power WCNOC Comanche Peak SES P.O. Box 411 P.O. Box 1002 Burlington, KS 66839 Glen Rose, TX 76043 Mr. Scott Bauer Mr. Stan Ketelsen Regulatory Affairs Manager, Regulatory Services Palo Verde NGS Pacific Gas & Electric P.O. Box 52034, Mail Stop 104/5/536 Mail Station 7636 P.O. Box 56 Phoenix, AZ 85072-2034 Avila Beach, CA 93424 Mr. Scott Head Certrec Corporation Supervisor, Licensing 4200 South Hulen, Suite 630 South Texas Project NOC Fort Worth, TX 76109 Mail Code N5014 P.O. Box 289 (Certrec receives ALL Wadsworth, TX 77483 attachments as long as they are non-safeguards and public disclosed).

Mr. John ONeill Shaw, Pittman 2300 N. Street N.W.

Washington, DC 20037

ULNRC-05237 December 9, 2005 Page 4 LIST OF COMMITMENTS The following table identifies those actions committed to by AmerenUE in this document. Any other statements in this document are provided for information purposes and are not considered commitments. Please direct questions regarding these commitments to:

COMMITMENT Due Date/Event Restoration of Loose Parts Monitoring System Channel 5 to Prior to restart Operable status from Refuel 15 Note: Refuel 15 is currently scheduled to start March 30, 2007.

ENCLOSURE Special Report The Loose-Part Detection System Limiting Condition for Operation (LCO) (Section 16.3.3.5 of the Final Safety Analysis Report) requires the loose-part detection system to be operable in Modes 1 and 2. With one or more Loose-Part Detection System channels inoperable for more than 30 days, LCO Action 'a' requires a Special Report to be submitted to the Commission within the next 10 days outlining the cause of the malfunction and the plans for restoring the channel(s) to operable status.

On November 16, 2005, with the Unit in Mode 3, Channel 5 of the Loose-Part Detection System (LPDS) was declared inoperable. This is one of the two sensors that mounted on the inlet plenum side of Steam Generator "A".

Cause of the malfunction:

The initial investigation has concluded that the channel degradation is likely associated with the channel accelerometer, hard-line cable, or connectors located inside the primary containment, as indicated by its signal drifting and low responses.

Plans for restoring the channel to Operable status:

The capability to detect loose metallic parts in the Reactor Coolant System has been retained with the remaining 11 operable channels. The redundant sensor on the Steam Generator "A" is operable. Therefore continued operation to Refuel 15 is acceptable.

A station Work Request has been written to repair Channel 5 of the LPDS. The repair and testing to return the channel to operable status will be scheduled for the next refueling outage (RF015), due to limited accessibility resulting from high radiation dose rates during normal plant operation. Refuel 15 is currently scheduled to begin on March 30, 2007.

Repairs will be completed prior to restart from Refuel 15.