| Start date | Site | Title |
---|
ENS 57032 | 16 March 2024 19:49:00 | Waterford | Manual Reactor Trip Due to Main Feedwater and Main Steam Isolations |
ENS 57021 | 11 March 2024 17:37:00 | Hatch | Manual Reactor Trip |
ENS 57004 | 4 March 2024 00:42:00 | Nine Mile Point | Automatic Reactor Scram Due to Main Turbine Trip on LOW Condenser Vacuum |
ENS 56995 | 28 February 2024 14:39:00 | Monticello | Automatic Reactor Scram |
ENS 56991 | 24 February 2024 20:46:00 | Calvert Cliffs | Manual Reactor Trip Due to Steam Generator 22 Feed Pump Trip |
NUREG-2194 Volume 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | 31 January 2024 | | NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases |
ENS 56936 | 29 January 2024 17:02:00 | Peach Bottom | Automatic Reactor Scram |
ML24026A301 | 26 January 2024 | 05000611 05000612 | Kairos Power, LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 7 |
ML24003A767 | 3 January 2024 | 05000611 05000612 | Kairos Power LLC, Changes to Hermes 2 Construction Permit Application (PSAR) Chapters 4, 5, 7, and 13 |
ENS 56894 | 16 December 2023 09:50:00 | Grand Gulf | Automatic Scram Due to Turbine Trip |