Technical Specifications Task Force (TSTF) is an industry group responsible for developing standard changes to the Technical Specifications which individual licensees may request adoption from the NRC.
- docket = PROJ0753
Start date | Title | TSTF | Topic | |
---|---|---|---|---|
ML24032A469 | 1 February 2024 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML24029A147 | 31 January 2024 | TSTF-592 Cover Letter for Final SE of TSTF-592 | TSTF-592 | |
ML24029A148 | 31 January 2024 | Final Traveler SE of TSTF-592 | TSTF-592 | |
ML24009A262 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency | TSTF-600 | |
ML24009A263 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators | TSTF-599 | |
ML23321A125 | 18 December 2023 | Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-505 TSTF-14 TSTF-592 | Reactor Vessel Water Level |
ML23325A213 | 18 December 2023 | Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | TSTF-591 | |
ML23325A214 | 18 December 2023 | Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | TSTF-591 | Probabilistic Risk Assessment |
ML24016A270 | 12 December 2023 | TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk | TSTF-585 | |
ML23299A250 | 26 October 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML23269A151 | 26 September 2023 | Draft Model SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-591 | Probabilistic Risk Assessment |
ML23262B229 | 21 September 2023 | Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-591 | |
ML23262B230 | 21 September 2023 | Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-505 TSTF-591 | Probabilistic Risk Assessment |
ML23257A158 | 18 September 2023 | NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23 | TSTF-601 | |
ML23124A221 | 11 September 2023 | Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown | TSTF-589 | |
ML23153A144 | 11 September 2023 | Draft SE of Traveler TSTF-591, Revise Risk-Informed Completion Time (RICT) Program | TSTF-505 TSTF-591 | Probabilistic Risk Assessment |
ML23241B039 | 11 September 2023 | Final Model SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | TSTF-589 | |
ML23241B040 | 11 September 2023 | Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | TSTF-589 | Safe Shutdown Recently irradiated fuel Offsite Circuit |
ML23250A067 | 7 September 2023 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling | TSTF-601 | |
ML23243B034 | 31 August 2023 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After Refueling | TSTF-601 | |
ML23234A174 | 22 August 2023 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-593, Revise Design Features | TSTF-593 | |
ML23222A188 | 10 August 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML23222A227 | 10 August 2023 | Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-505 TSTF-592 | |
ML23205A214 | 10 August 2023 | Acceptance for Review Regarding Traveler TSTF-596, Revision 0, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) | TSTF-596 | Surveillance Frequency Control Program |
ML23206A124 | 31 July 2023 | TSTF-584 Cover Letter for Final SE | TSTF-584 | |
ML23206A076 | 31 July 2023 | Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | TSTF-584 | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML23206A075 | 31 July 2023 | Final Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | TSTF-584 | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML23209A044 | 25 July 2023 | Email Concurrence for DSS Log 2188 (TSTF-584) | TSTF-584 | |
ML23205A234 | 6 July 2023 | Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' | TSTF-426 TSTF-422 TSTF-432 TSTF-601 | Surveillance Frequency Control Program |
ML23157A206 | 5 July 2023 | Acceptance for Review and Revised Schedule Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements | TSTF-576 | |
ML23124A220 | 30 June 2023 | Draft Model SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | TSTF-589 | |
ML23124A222 | 30 June 2023 | Draft Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | TSTF-589 | Safe Shutdown Recently irradiated fuel Offsite Circuit |
ML23145A282 | 2 June 2023 | Acceptance for Review Regarding Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One Hour Preparation Time | TSTF-585 | |
EPID:L-2023-PMP-0000 | 2 June 2023 | TSTF-585 | ||
ML23117A351 | 27 April 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML23107A259 | 17 April 2023 | Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) | TSTF-585 | |
ML23075A318 | 16 March 2023 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-596, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) | TSTF-596 | Surveillance Frequency Control Program |
ML23012A281 | 13 March 2023 | Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | TSTF-584 | |
ML23012A282 | 13 March 2023 | Draft Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | TSTF-584 | Reactor Vessel Water Level Anticipated operational occurrence Power change |
ML23012A284 | 13 March 2023 | Draft Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | TSTF-584 | Reactor Vessel Water Level Anticipated operational occurrence Power change |
ML23059A334 | 28 February 2023 | TSTF-576 Open Issues Letter | TSTF-576 | |
ML23040A090 | 9 February 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML23033A384 | 2 February 2023 | February 9, 2023, Meeting Handout: NRC Staff Comments on TSTF-576 Revision 2 (Draft), SRV Requirements | TSTF-576 | |
ML23033A538 | 2 February 2023 | Forthcoming Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | TSTF-576 | |
ML23010A259 | 11 January 2023 | Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-1 TSTF-592 | |
... further results |