05000313/FIN-2018003-06 | 30 September 2018 23:59:59 | Arkansas Nuclear | Reactor Power Transient Caused by the Turbine Bypass Valve Failing Open |
05000440/FIN-2017002-01 | 30 June 2017 23:59:59 | Perry | Failure to Notify the NRC within Eight Hours of a Non -Emergency Event that Could Have Prevented the Fulfillment of Multiple Safety Functions |
05000461/FIN-2016003-03 | 30 September 2016 23:59:59 | Clinton | Failure to Perform a 50.59 Screening for Changing the Frequency of Exercising the Turbine Bypass Valves |
05000461/FIN-2016003-02 | 30 September 2016 23:59:59 | Clinton | Exceeded Technical Specification Allowed Outage Time for Main Turbine Bypass System |
05000341/FIN-2016001-02 | 31 March 2016 23:59:59 | Fermi | Failure to Correctly Interpret and Implement TS Requirements for RPS Trip Functions |
05000341/FIN-2016001-03 | 31 March 2016 23:59:59 | Fermi | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Loss of RPS Trip Safety Functions |
05000289/FIN-2015002-01 | 30 June 2015 23:59:59 | Three Mile Island | Failure to Maintain Turbine Bypass Valve Simulator Modeling |
05000374/FIN-2015002-04 | 30 June 2015 23:59:59 | LaSalle | Failure to Include Limiting Conditions for Operation in the Technical Specifications |
05000374/FIN-2015001-03 | 31 March 2015 23:59:59 | LaSalle | COLR Revision Potentially Created Non-Conservative Technical Specificat |
05000354/FIN-2014002-06 | 31 March 2014 23:59:59 | Hope Creek | Failure to Use Approved Method of Post-Scram Reactor Pressure Control |
05000259/FIN-2013003-02 | 30 June 2013 23:59:59 | Browns Ferry | LER 05000296/2013-003-00 and 05000259/2013-002-00 |
05000458/FIN-2012009-03 | 30 September 2012 23:59:59 | River Bend | Implementation of the Procedure for Infrequently Performed Tests or Evolutions |
05000254/FIN-2012003-03 | 30 June 2012 23:59:59 | Quad Cities | Failure to Identify Design Deficiency in Vendor Product |
05000416/FIN-2012002-02 | 31 March 2012 23:59:59 | Grand Gulf | Manual Reactor Scram Caused by Failure to Ensure the Main Steam Supply Valve to Reactor Feed Pump Turbine B was Full Open |
05000458/FIN-2010004-06 | 30 September 2010 23:59:59 | River Bend | Inadequate Maintenance Results in Unplanned Opening of Main Turbine Bypass Valve |
05000317/FIN-2010003-02 | 30 June 2010 23:59:59 | Calvert Cliffs | Inadequate Design Control Reviews of the Turbine Control System and the Nuclear Steam Supply System |
05000352/FIN-2009004-03 | 30 September 2009 23:59:59 | Limerick | Licensee-Identified Violation |
05000255/FIN-2008009-03 | 31 December 2008 23:59:59 | Palisades | Non-Safety-Related Components Creditied in Steam Generator Tube Rupture Acident Analysis |
05000352/FIN-2008002-02 | 31 March 2008 23:59:59 | Limerick | Failure to Correct Main Turbine Bypass Valve Adverse Condition |
05000416/FIN-2008002-10 | 31 March 2008 23:59:59 | Grand Gulf | Licensee-Identified Violation |
05000318/FIN-2004008-01 | 30 June 2004 23:59:59 | Calvert Cliffs | Failure to Adequately Implement Modification Design Review of the Reactor Regulating System Quick Open Circuit |