Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23135A204 | 9 November 2022 | E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation |
ML22152A200 | 18 May 2022 | E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation |
ML21168A165 | 7 June 2021 | Fire Hazards Analysis, E-1F9915, Rev 14, Design Basis Document for Procedure Ofn RP-017 |
IR 05000482/2020002 | 12 August 2020 | Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 |
ML20290A612 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, E-1F9915, Rev. 13, Design Basis Document for Ofn RP-017, Control Room Evacuation |
ML20055F291 | 24 March 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
IR 05000482/2019004 | 3 February 2020 | Integrated Inspection Report 05000482/2019004 |
ML20007E442 | 14 December 2019 | 10-WC-2019-12 Post-Exam Comments |
ML19092A149 | 11 March 2019 | Fire Protection Evaluations for Unique and Unbounded Fire Barrier Configurations - E-1F9915 Rev 10, Design Basis Document for Ofn RP-017, Control Room Evacuation |
IR 05000482/2018004 | 11 February 2019 | NRC Integrated Inspection Report 05000482/2018004 |
ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | 19 June 2018 | Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term |
ML18094A115 | 28 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection. |
WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... | 15 January 2018 | Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... |
ML17331A178 | 4 December 2017 | Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) |
05000482/LER-2017-003 | 2 November 2017 | ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition LER 17-003-00 for Wolf Creek Generating Station Regarding ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition |
IR 05000482/2017002 | 10 August 2017 | NRC Integrated Inspection Report 05000482/2017002 and Exercise of Enforcement Discretion |
ML18093B002 | 27 June 2017 | Design Basis Document for Ofn RP-017, Control Room Evacuation, E-1F9915, Rev 9 |
ML16204A114 | 31 May 2016 | Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evacuation |
WM 16-0008, Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evacuation | 31 May 2016 | Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evacuation |
ML16076A357 | 10 March 2016 | Changes to Technical Specification Bases - Revisions 67 Through 73 |
ML17151B039 | 26 October 2015 | E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation |
ET 16-0003, Flood Hazard Reevaluation Report, Revision 1 | 21 October 2015 | Flood Hazard Reevaluation Report, Revision 1 |
ML15105A346 | 23 March 2015 | NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event |
IR 05000482/2014008 | 18 December 2014 | IR 05000482-14-008; 10/20/2014 - 11/06/2014; Wolf Creek Generating Station; Triennial Fire Protection Team Inspection |
ML14136A171 | 30 May 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14034A054 | 12 February 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14077A281 | 10 February 2014 | Operating Corporation Flood Hazard Reevaluation Report,Revision 0 |
ET 13-0035, Fire Protection Program Re Alternative Shutdown Capability | 21 November 2013 | Fire Protection Program Re Alternative Shutdown Capability |
ML13177A284 | 30 June 2013 | WCAP-17678-NP, Supplement 1, Revision 1, Wolf Creek Generating Station Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Part 1 of 3 |
ET 12-0033, License Amendment Request (LAR) for Deviation from Fire Protection Requirements | 20 December 2012 | License Amendment Request (LAR) for Deviation from Fire Protection Requirements |
ML12342A253 | 30 November 2012 | WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Cover Through Appendix a, Seismic Walkdown Checklists (Swcs) Page A-112 |
ML12340A398 | 30 November 2012 | PEUS-WR-12-5, Revision 1, Wolf Creek Nuclear Operating Corporation Post Fukushima Flooding Walkdown Report |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
IR 05000482/2011007 | 27 December 2011 | IR 05000482-11-007; Wolf Creek Generating Station; 10/17/2011 - 12/12/2011; Wolf Creek Generating Station, NRC Triennial Fire Inspection Report |
IR 05000482/2011004 | 10 November 2011 | IR 05000482-11-004, 07/01/2011 9/30/2011; Wolf Creek Generating Station, Integrated Resident Report, Equipment Alignment, Fire Protection, Surveillance Testing, and Event Followup |
IR 05000482/2010005 | 11 February 2011 | IR 05000482-10-005; Wolf Creek Nuclear Operating Corporation; 10/01/2010 - 12/31/2010; Wolf Creek Generating Station, NRC Integrated Inspection Report |
IR 05000482/2010007 | 10 January 2011 | IR 05000482-10-007, on 11/18/10, Wolf Creek, Component Design Bases Inspection |
ML102560258 | 13 September 2010 | IR 05000482-10-006; February 16, 2008, Through July 30, 2010: Wolf Creek Generating Station, Biennial Baseline Inspection of the Identification and Resolution of Problems |
ML100630900 | 4 March 2010 | Response to Disputed Non-Cited Violations in NRC Inspection Report 05000482-09-004 and Withdrawal of Non-Cited Violation |
WM 09-0065, Response to NRC Integrated Inspection Report 05000482/2009004 | 9 December 2009 | Response to NRC Integrated Inspection Report 05000482/2009004 |
ML093200399 | 16 November 2009 | 2009-08-DRAFT Written Exam |
ML093140803 | 10 November 2009 | IR 05000482-09-004, 7/1/2009 - 9/30/2009; Wolf Creek Generating Station, Integrated Resident and Regional Report; Operability Evaluations; Post Maintenance Testing; Plant Modifications; Maintenance Risk Assessments and Emergent Work Control |
ML092860234 | 13 October 2009 | 2009-09 - Final Written Examination |
IR 05000482/2008002 | 24 July 2008 | IR 05000482-08-002, on 05/21/2008, for Wolf Creek |
ML081430159 | 21 May 2008 | IR 05000482-08-002, on 1/01 - 4/07/08, Wolf Creek Generating Station, Fire Protection, Maintenance Risk Assessments and Emergent Work Control, Access Control to Radiologically Significant Areas, Event Followup and Other Activities |
IR 05000482/2006003 | 21 August 2006 | IR 05000482-06-003; on 04/08/2006 - 07/7/2006 for Wolf Creek; Identification and Resolution of Problems, and Event Follow-up |
ML020790619 | 11 March 2002 | Annual 10 CFR 50.59 Evaluation Report |
IR 05000482/1999013 | 20 September 1999 | Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support |