 Issue dateTitle
IR 05000244/202100420 January 2022R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2021004
ML21055A02019 February 2021Transmittal of 2020 Owner'S Activity Report
ML20339A02520 November 20209 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5
ML20339A22120 November 2020Technical Specifications Bases, Rev 101
ML19150A47810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5
ML19150A51110 May 2019Revision 90 to Technical Specification Bases
ML18043B16026 March 2018R. E. Ginna Nuclear Power Plant - Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML20311A5506 November 20172017 Q1-Q4 ROP Inspection Findings
ML16278A0777 November 2016Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
ML16279A3815 October 2016NRR E-mail Capture - Ginna Nuclear Power Plant - Request for Additional Information Regarding: Deletion of E BAR Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
ML16180A44828 June 2016Supplement to Response to Request for Additional Information for the Review of TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec
ML16180A1645 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML16075A11917 March 2016Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
IR 05000244/201500817 November 2015IR 05000244/2015008; 09/14/2015 - 10/01/2015; R.E. Ginna Nuclear Power Plant; Triennial Fire Protection Inspection
ML15105A34623 March 2015NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event
IR 05000244/20140043 November 2014IR 05000244-14-004; 07/01/2014 - 09/30/2014; R.E. Ginna Nuclear Power Plant, LLC; Follow-Up of Events and Notices of Enforcement Discretion
IR 05000244/201401030 September 2014
ML14191A25510 July 2014Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process
ML14170B02226 June 2014Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident
ML14134A1332 June 2014Constellation Plants Seismic Walkdown - Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2 and Ginna Nuclear Power Plant.(Tac MF0104, MF0105, MF0127, MF0145 and MF0146)
ML14099A19631 March 2014Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.
IR 05000244/201300514 February 2014IR 05000244-13-005; 10/01/2013 - 12/31/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Adverse Weather Protection and Maintenance Effectiveness
IR 05000244/201300412 November 2013IR 05000244-13-004; 07/01/2013 - 09/30/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Maintenance Risk Assessments and Emergent Work Control; Follow-Up of Events and Notices of Enforcement Discretion
ML13210A03425 July 2013Supplemental Response to 10 CFR 50.54(f) Request for Recommendation 2.3, Seismic Information
ML12362A45121 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90
ML12335A02927 November 2012R. E. Ginna - Response to 10CFR50.54(f) Request for Information, Recommendation 2.3 Flooding
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML11186A90430 June 2011Notification of Potential Part 21 Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus
ML11129A0133 May 2011Update to License Amendment Request: Improvement to the Definition of Operations Involving Positive Reactivity Changes (TSTF-286)
ML10232040825 May 2010Final Operating Exam (Sections a, B, and C) (Folder 3)
ML10232037325 May 2010Final Outlines (Folder 3)
IR 05000244/200900413 November 2009IR 05000244-09-004 on 07/01/09 - 09/30/09 for R.E. Ginna Station
ML09210030210 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 7, Instrumentation and Controls Through Chapter 10, Steam and Power Conversion System
IR 05000244/200600615 October 2006IR 05000244-06-006, on 08/14-31/2006, R.E. Ginna Nuclear Power Plant, LLC
IR 05000244/20060073 August 2006IR 05000244-06-007; on 06/05 - 23/2006; Ginna Nuclear Power Plant; Triennial Fire Protection Team Inspection, Fire Protection
ML0612805491 May 2006License Amendment Request: Technical Specification Improvement Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process
ML0533903529 January 2006FRN: All Nuclear Power Plants That Use Hemyc/Mt Fire Barriers Notice of Issuance of Director'S Decision Under 10 CFR 2.206
ML0533903119 January 2006G20050379 - Mr. Paul Gunter Ltr. Re. 2.206 - Inoperable Hemyc/Mt Fire Protection Systems
ML05263041120 October 2005G20050379 - Paul Gunter Ltr 2.206 Inoperable Hemyc/Mt Fire Protection Systems, Proposed Directors Decision
ML05174056227 June 2005G20050379 - Paul Gunter Ltr. 2.206 Inoperable Hemyc/Mt Fire Protection System
ML05130033029 April 2005License Amendment Request Regarding Adoption of Relaxed Axial Offset Control (RAOC)
ML0411902082 April 2004Final RO & SRO Written W/References Provided to Applicants
ML04133014823 January 2004Issuance of Renewed Facility Operating License No. DPR-18 for R. E. Ginna Nuclear Power Plant, Technical Specification (Appendix a)
ML02221040930 July 2002R. E. Ginna Nuclear Power Plant Application for Renewed Operating License, Volume 1, Table of Contents - Section 2.0, Table 2.3.3.9
ML17265A64112 May 1999Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630
ML17265A64312 May 1999LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed
ML17265A29421 May 1998Tech Specs Consisting of Submittal Changes for 1998
ML17265A21230 March 1998Discusses Licensing Rept Appended to 970331 Lar,Revising Configuration of Certain Spent Fuel Pool Storage Racks. Recent Testing Performed on Boraflex Panels Indicates That Assumptions Are Not Conservative for Certain Region 2 Cells
ML17265A19011 March 1998Forwards LER 98-001-00 IAW 10CFR50.73(a)(2)(ii)(A) & 10CFR50.21.Event Has No Way Affected Public Health & Safety