Semantic search

Jump to navigation Jump to search
 Issue dateTitle
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
ML20137S23331 December 1994Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994
ML20086S25630 March 1994Forwards Summary of Radiation Exposures Received for 1993
NRC Generic Letter 1992-026 March 1992NRC Generic Letter 1992-002: Resolution of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown.
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping13 June 1991Thermal Stratification in Feedwater System Piping
ML20072V52912 April 1991Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization
Information Notice 1989-55, Degradation of Containment Isolation Capability by a High-Energy Line Break30 June 1989Degradation of Containment Isolation Capability by a High-Energy Line Break
IR 05000267/198900512 April 1989Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling
ML20151B00331 March 1988Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-1131 December 1987Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-11
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-1131 December 1987Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-11
ML20235R41631 October 1987Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station
ML20235V88731 October 1987Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept
NRC Generic Letter 1987-129 July 1987NRC Generic Letter 1987-012: Loss of Residual Heat Removal (RHR) While the Reactor Coolant System (RCS) Is Partially Filled
ML20214H16720 May 1987Forwards AEOD LER Quality Evaluation for Fort St Vrain During Period from 860401-870507
Information Notice 1987-05, Miswiring in a Westinghouse Rod Control System2 February 1987Miswiring in a Westinghouse Rod Control System
Information Notice 1986-53, Improper Installation of Heat Shrinkable Tubing26 June 1986Improper Installation of Heat Shrinkable Tubing
ML20100G29522 March 1985Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 4 to RERP-CR Re Control Room Procedure & Issue 5 to RERP Section 10.B Re Radiological Emergency Response Plan
ML20102A67421 January 1985Forwards Revised Radiological Emergency Response Plan (RERP) Procedures,Including RERP Section 5,Issue 7 Re Organizational Control of Emergencies & RERP Section 6,Issue 8 Re Emergency Measures
ML20101D4534 December 1984Forwards Revised Radiological Emergency Response Plan Implementing procedures,RERP-CR, Control Room Procedure & RERP-DOSE, Offsite Dose Calculations Methodology
ML20099H7476 August 1984Books 1-4 of Emergency Implementing Procedures,Including Control Room Alert,Site Emergency,General Emergency Procedure, Control Room Procedure, Offsite Dose Calculation Methodology & Executive Command Post ..
NRC Generic Letter 1983-4319 December 1983NRC Generic Letter 1983-043: Reporting Requirements of 10 CFR Part 50, Sections 50.72 & 50.73 & Standard Technical Specifications