Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
ML20137S233 | 31 December 1994 | Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 |
ML20086S256 | 30 March 1994 | Forwards Summary of Radiation Exposures Received for 1993 |
NRC Generic Letter 1992-02 | 6 March 1992 | NRC Generic Letter 1992-002: Resolution of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown. |
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability |
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping | 13 June 1991 | Thermal Stratification in Feedwater System Piping |
ML20072V529 | 12 April 1991 | Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization |
Information Notice 1989-55, Degradation of Containment Isolation Capability by a High-Energy Line Break | 30 June 1989 | Degradation of Containment Isolation Capability by a High-Energy Line Break |
IR 05000267/1989005 | 12 April 1989 | Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling |
ML20151B003 | 31 March 1988 | Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept |
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-11 | 31 December 1987 | Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-11 |
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-11 | 31 December 1987 | Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-11 |
ML20235R416 | 31 October 1987 | Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station |
ML20235V887 | 31 October 1987 | Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept |
NRC Generic Letter 1987-12 | 9 July 1987 | NRC Generic Letter 1987-012: Loss of Residual Heat Removal (RHR) While the Reactor Coolant System (RCS) Is Partially Filled |
ML20214H167 | 20 May 1987 | Forwards AEOD LER Quality Evaluation for Fort St Vrain During Period from 860401-870507 |
Information Notice 1987-05, Miswiring in a Westinghouse Rod Control System | 2 February 1987 | Miswiring in a Westinghouse Rod Control System |
Information Notice 1986-53, Improper Installation of Heat Shrinkable Tubing | 26 June 1986 | Improper Installation of Heat Shrinkable Tubing |
ML20100G295 | 22 March 1985 | Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 4 to RERP-CR Re Control Room Procedure & Issue 5 to RERP Section 10.B Re Radiological Emergency Response Plan |
ML20102A674 | 21 January 1985 | Forwards Revised Radiological Emergency Response Plan (RERP) Procedures,Including RERP Section 5,Issue 7 Re Organizational Control of Emergencies & RERP Section 6,Issue 8 Re Emergency Measures |
ML20101D453 | 4 December 1984 | Forwards Revised Radiological Emergency Response Plan Implementing procedures,RERP-CR, Control Room Procedure & RERP-DOSE, Offsite Dose Calculations Methodology |
ML20099H747 | 6 August 1984 | Books 1-4 of Emergency Implementing Procedures,Including Control Room Alert,Site Emergency,General Emergency Procedure, Control Room Procedure, Offsite Dose Calculation Methodology & Executive Command Post .. |
NRC Generic Letter 1983-43 | 19 December 1983 | NRC Generic Letter 1983-043: Reporting Requirements of 10 CFR Part 50, Sections 50.72 & 50.73 & Standard Technical Specifications |