Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20093B632 | 5 May 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time | 14 September 2017 | License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time |
ML17241A228 | 29 August 2017 | 301 ADAMS2D Page 1 Exam Admin Items Immediate Release |
IR 05000413/2016003 | 16 February 2017 | Errata for Catawba Nuclear Station - NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion |
IR 05000413/2016004 | 31 January 2017 | NRC Integrated Inspection Report 05000413/2016004 and 05000414/2016004 |
ML16307A004 | 2 November 2016 | NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion |
CNS-15-062, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2) | 16 July 2015 | Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2) |
ML15105A346 | 23 March 2015 | NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event |
ML15082A074 | 19 March 2015 | Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Stem System Braided Flex-Hose |
ML14153A662 | 11 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident |
ML14107A300 | 16 May 2014 | (Cns), Unit 2 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14108A201 | 16 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
CNS-14-002, Response to NRC Request for Information Pursuant to Title 10 Code of Federal Regulations 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 14 January 2014 | Response to NRC Request for Information Pursuant to Title 10 Code of Federal Regulations 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns |
ML14041A295 | 2 December 2013 | Document No. 1457690303-R-M-00005-0, Revision 0, NTTF 2.3 Seismic Peer Review Supplementary Report, Catawba Nuclear Station Unit 2. |
ML13162A092 | 28 March 2013 | Response to NRC Request for Information Pursuant to Title 10 Code of Federal Regulations 50.54(f) Regarding Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident |
ML13162A070 | 14 March 2013 | 1457690303-R-M-00004-0, NTTF 2.3 Seismic Peer Review Supplementary Report |
ML12356A448 | 17 December 2012 | 301 Draft SRO Written Exam |
ML12334A444 | 27 November 2012 | Flooding Walkdown Information Requested by NRC Letter, Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident.` |
ML13162A072 | 18 November 2012 | 1457690303-R-M-00003-0, NTTF 2.3 Seismic Peer Review Report |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML111540489 | 2 February 2011 | Initial Exam 2010-301 Draft RO Written Exam |
ML110280015 | 24 January 2011 | Notification of Potential Part 21 - Bus Disconnect Stab Assembly - 600V Essential Motor Control Centers |
ML100470564 | 2 February 2010 | Initial Exam 2009-301 Final Simulator Scenarios |
ML100470442 | 2 February 2010 | Initial Exam 2009-301 Draft Administrative JPMs |
ML100070550 | 7 January 2010 | Initial Exam 2009-301 Post Exam Comments |
ML083540469 | 18 December 2008 | Duke Energy Carolinas, Llc., Deficiency Report on Defective Digital Optical Isolators |
ML102000378 | 15 May 2008 | E-mail from Gepford to Bonser, Catawba Sump W/Identified SR-89 Activity |
IR 05000413/2007007 | 14 September 2007 | IR 05000413-07-007 and 050000414-07-007, on 07/16 -20/2007 and 07/30 - 08/03/2007, Catawba Nuclear Station, Units 1 and 2, Fire Protection |
ML053390352 | 9 January 2006 | FRN: All Nuclear Power Plants That Use Hemyc/Mt Fire Barriers Notice of Issuance of Director'S Decision Under 10 CFR 2.206 |
ML053390311 | 9 January 2006 | G20050379 - Mr. Paul Gunter Ltr. Re. 2.206 - Inoperable Hemyc/Mt Fire Protection Systems |
ML052630411 | 20 October 2005 | G20050379 - Paul Gunter Ltr 2.206 Inoperable Hemyc/Mt Fire Protection Systems, Proposed Directors Decision |
ML051740562 | 27 June 2005 | G20050379 - Paul Gunter Ltr. 2.206 Inoperable Hemyc/Mt Fire Protection System |
ML051440209 | 12 May 2005 | G20050379 - Paul Gunter Ltr Re 2.206 - Inoperable Hemyc/Mt Fire Protection Systems |
IR 05000413/2004007 | 30 July 2004 | IR 05000413-04-007, IR 05000414-04-007, on 06/07 - 11/2004 & 06/21 - 25/2004, Catawba Nuclear Station, Units 1 and 2; Triennial Fire Protection |
ML040650308 | 4 March 2004 | Technical Specifications, Amd 212 and 206 |
ML040300275 | 15 January 2004 | Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 Proposed Technical Specification Amendment TS 3.4.3 - Reactor Coolant System (RCS) Pressure and Temperature (P/T) Limits, TS 3.4.6, RCS Loops - Mode 4, TS 3.4.7, RCS Loops - Mod |
ML031671347 | 9 June 2003 | Proposed Technical Specifications (TS) Amendments Revision to Steam Generator TS |
ML033510578 | 15 May 2003 | April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Combined Written Exam (Part 2 of 3) |
ML030900037 | 20 March 2003 | Proposed TS Amendment TS 3.4.3 - Reactor Coolant System Pressure & Temperature Limits |
IR 05000413/2002002 | 17 July 2002 | IR 05000413-02-002 & IR 05000414-02-002 on 03/23 - 06/22/2002, Catawba, Units 1 & 2. Areas Inspected: Heat Sink Performance, Inservice Inspection & Surveillance Testing. Three non-cited Violations Noted |
ML020640192 | 19 February 2002 | Emergency Plan Implementing Procedures |
IR 05000413/1999005 | 24 September 1999 | Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support |
05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed | 15 July 1999 | Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed |
ML20209E283 | 1 July 1999 | Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support |
ML20217G577 | 9 June 1999 | Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 |
IR 05000413/1999001 | 6 April 1999 | Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000413/1998016 | 4 December 1998 | Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser |