ML20204A8074 June 2020AN1-2020-04 Final Written Exam
IR 05000313/201800423 January 2019NRC Integrated Inspection Report 05000313/2018004 and 05000368/2018004
ML18163A41811 July 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
0CAN031802, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,...19 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,...
IR 05000313/201700325 October 2017NRC Integrated Inspection Report 05000313/2017003 and 05000368/2017003
05000313/LER-2016-0039 June 2017Tornado Missile Vulnerabilities Resulting in Unanalyzed Condition
LER 16-003-01 for Arkansas Nuclear One, Unit 1 Regarding Tornado Missile Vulnerabilities Resulting in Unanalyzed Condition
05000368/LER-2017-00130 May 2017Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
LER 17-001-00 for Arkansas Nuclear One, Unit 2, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions
ML16259A3791 September 20162016-09-FINAL Operating Test
ML16260A1901 September 20162016-09-DRAFT Operating Test
05000313/LER-2016-00118 May 2016Non-Functional External Penetration Flood Seals
LER 16-001-00 for Arkansas Nuclear One, Unit 1, Regarding Non-Functional External Penetration Flood Seals
ML15264A6819 September 20152015-09-FINAL-WRITTEN Exam
ML15265A3139 September 20152015-09-DRAFT Written Exam
ML14336A37621 November 20142014-11 Final Operating Test
IR 05000313/201400412 November 2014IR 05000313/2014004; 05000368/2014004; on 07/01/2014 - 09/30/2014; Arkansas Nuclear One, Units 1 and 2; Maintenance Effectiveness, Post-Maintenance Testing, Follow-up of Events
ML14218A48830 July 2014FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety)
ML14178A82127 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident
ML14051A18818 March 2014Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0090-MF0091)
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns
2CAN091302, Updated Seismic Walkdown Report30 September 2013Updated Seismic Walkdown Report
1CAN091301, Updated Seismic Walkdown Report30 September 2013Updated Seismic Walkdown Report
IR 05000313/20130117 June 2013IR 05000313-13-011, 05000368-13-011, 04/05/2013 - 05/09/2013; Arkansas Nuclear One, Augmented Inspection Team
ML12342A22016 November 2012Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 331
1CAN111201, Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 33116 November 2012Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 331
ML12342A05216 November 2012Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, and Attach. 2, List of Regulatory Commitments, Cover -
IR 05000313/20120072 May 2012IR 05000313-12-007 & 05000368-12-007; Entergy Operations Inc; 02/13/2012 - 03/16/2012; Arkansas Nuclear One, Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
IR 05000313/20100035 August 2010IR 05000313-10-003, 05000368-10-003 on 04/01/2010 - 06/30/2010 for Arkansas Nuclear One, Integrated Resident and Regional Report; Adverse Weather Protection, Refueling Activities, Radiological Hazard Assessment and Exposure Control, & Occup
IR 05000313/200900511 February 2010IR 05000313-09-005, 05000368-09-005, on 09/24/2009 - 12/31/2009; Arkansas Nuclear One, Integrated Resident Report; Operability Evaluations, Identification and Resolution of Problems, Event Follow-up
ML0533903529 January 2006FRN: All Nuclear Power Plants That Use Hemyc/Mt Fire Barriers Notice of Issuance of Director'S Decision Under 10 CFR 2.206
ML0533903119 January 2006G20050379 - Mr. Paul Gunter Ltr. Re. 2.206 - Inoperable Hemyc/Mt Fire Protection Systems
2CAN110502, CFR 50.59 Summary Report21 November 2005CFR 50.59 Summary Report
ML05263041120 October 2005G20050379 - Paul Gunter Ltr 2.206 Inoperable Hemyc/Mt Fire Protection Systems, Proposed Directors Decision
2CAN070502, License Amendment Request Pre-Application Review for License Amendment Request Regarding ANO-2 Cask Loading Pit Criticality Analysis Arkansas Nuclear One, Unit 27 July 2005License Amendment Request Pre-Application Review for License Amendment Request Regarding ANO-2 Cask Loading Pit Criticality Analysis Arkansas Nuclear One, Unit 2
ML05174056227 June 2005G20050379 - Paul Gunter Ltr. 2.206 Inoperable Hemyc/Mt Fire Protection System
ML05139023917 May 2005Part 21 Report 41702 Re Flex-Wedge Disc Fabricated by Crane- Aloyco
ML05144020912 May 2005G20050379 - Paul Gunter Ltr Re 2.206 - Inoperable Hemyc/Mt Fire Protection Systems
ML05069040027 January 200501-2005 - Draft Written Exam
ML05049038914 January 200501-2005 - Final Written Reference Exam
1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl19 August 1999Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
ML07104001728 April 199459 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
ML20058L0098 December 1993Forwards NRR 931102 Response to Region IV 930413 Request for Interpretation of Reporting Requirements Re Multiple Failures of safety-related Components Identified During Performance of Surveillance Testing
NRC Generic Letter 1992-026 March 1992NRC Generic Letter 1992-002: Resolution of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown.
0CAN079211, 1991 Annual 10CFR50.59 Rept,Arkansas Nuclear One31 December 19911991 Annual 10CFR50.59 Rept,Arkansas Nuclear One
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping13 June 1991Thermal Stratification in Feedwater System Piping
ML20073K84531 March 1991Entergy Nuclear Performance Rept,Mar 1991
Information Notice 1989-55, Degradation of Containment Isolation Capability by a High-Energy Line Break30 June 1989Degradation of Containment Isolation Capability by a High-Energy Line Break