Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML16340A0099 March 2017Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
CNL-15-175, Fifth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML15033A4303 March 2015Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
ML13330A95322 November 2013Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On..
ML11237A00725 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/1125 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML10124130728 April 2010Facility No. 0-330628 - Update to Cleanup of Diesel Spill Associated with Underground Storage Tanks (Usts) Identified June 26, 2009
ML07152021122 May 2007Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity
IR 05000327/19930492 November 1993Insp Repts 50-327/93-49 & 50-328/93-49 on 930929-1004.No Violations Noted.Major Areas Inspected:Civil/Structural Items Which Will Remain Open After Restart
IR 05000327/198704830 October 1987Insp Repts 50-327/87-48 & 50-328/87-48 on 870708-0911. Deficiencies & Unresolved Items Noted.Major Areas Inspected: Quality of Design Activities,Including Mechanical Sys & Components & Civil/Structural & Electrical Power Designs
ML20236E17714 September 1987Confirms Notification That on 870911,fire Suppression Sys Declared Inoperable as Result of All Four Emergency Diesel Generators Being Declared Inoperable.Missile Shield for Opening in Manhole Put in Place
ML20214M99326 May 1987Forwards Addl Background Info Concerning Rev 1 to Vol 2 to Section 15.5 of SQN Nuclear Performance Plan Re Platform & Miscellaneous Steel Thermal Growth,Per 870422 Telcon W/Nrc. W/Six Oversize Drawings
ML20052E8025 May 1982Requests Approval of Temporary Change Re Installation of Five Sewage Treatment Facility Lines Across & 8 Ft Above Essential Raw Cooling Water Supply Headers Requiring Temporary Removal of Tornado Missile Barrier
ML20049J3285 March 1982Forwards Response to Rl Tedesco 811110 Ltr to Hg Parris Re Tornado Missile Protection for 480-volt Transformers. Positive Protection from 1-inch Diameter Missile for Intake & Exhaust Openings Over Transformers Will Be Provided
ML19346A1231 June 1981Forwards Assessment of Potential for Damage to 480-volt Shutdown Transformers from Tornado Missiles Per Request. Probability of Event Extremely Low & Not Worthy of Further Study