Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20015A2695 February 2020December 17, 2019, Summary of Meeting with Entergy Operations, Inc. on Planned License Amendment Request to Incorporate the Tornado Missile Risk Evaluator Methodology at River Bend Station, Unit 1
ML19346C90417 December 2019Pre-Submittal Meeting - Proposed License Amendment Request - Incorporate Tornado Missile Risk Evaluator (TMRE) Into the River Bend Licensing Basis December 17, 2019
IR 05000458/20190115 April 2019NRC Problem Identification and Resolution Inspection Report 05000458/2019011
IR 05000458/20180038 November 2018NRC Integrated Inspection Report 05000458/2018003
IR 05000458/201800225 July 2018NRC Integrated Inspection Report 05000458/2018002 and Exercise of Enforcement Discretion
ML18152A8766 June 2018Enforcement Discretion Per Egm 15-002
RBG-47869, Supplement to Request Extension of Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Miss31 May 2018Supplement to Request Extension of Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missi
RBG-47865, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06 ...10 May 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06 ...
ML17226A14428 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 8, Section 8.1 Through 8.3
ML17226A12628 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 3, Section 3.1 Through Appendix 3D
ML17226A12528 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 3, Tables 3.2-1 Through 3.11-14
RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months29 October 2015License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months
RBG-47502, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14149A48429 May 2014NRR E-mail Capture - River Bend Station, Unit 1 Supplemental Information Needed for Acceptance of Req Lic Action, LAR to Rev UFSAR to Credit Ultimate Heat Sink
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases25 July 2013Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases
RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....27 July 2011Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....
RBG-47146, Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation.10 June 2011Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance for Non Technical Specification Barrier Degradation.
ML06145059226 May 2006Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report
IR 05000458/19870107 May 1987Insp Rept 50-458/87-10 on 870316-0430.No Violations or Deviations Noted.Major Areas Inspected:Previous Insp findings,LERs,10CFR21 Repts,Safety Sys Walkdown & Operational Safety Verification
RBG-18-698, Forwards Responses to Power Sys Branch Request for Addl Info Re Fsar.Closeout to Item 16 & Partial Closeouts to Item 10 of Table 1.3 & Item 51 of Table 1.4 of SER Provided21 August 1984Forwards Responses to Power Sys Branch Request for Addl Info Re Fsar.Closeout to Item 16 & Partial Closeouts to Item 10 of Table 1.3 & Item 51 of Table 1.4 of SER Provided