Issue date | Title | |
---|---|---|
ML23173A057 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted |
ML23062A419 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted) |
ML23062A215 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria, Table of Contents. (Redacted) |
IR 05000482/2020002 | 12 August 2020 | Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 |
ML20150A007 | 29 May 2020 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
ML19114A195 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns |
ML19114A172 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
ML19114A171 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix C, Table of Contents |
ML19015A422 | 11 March 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
IR 05000277/2018004 | 13 February 2019 | Integrated Inspection Report 05000277/2018004 and 05000278/2018004 and Exercise of Enforcement Discretion |
ML18157A260 | 6 June 2018 | Supplemental Information to Support Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants. |
ML17243A014 | 30 August 2017 | Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. |
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | 28 August 2017 | Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) |
IR 05000277/2017002 | 3 August 2017 | Integrated Inspection Report 05000277/2017002 and 05000278/2017002 and Exercise of Enforcement Discretion |
ML17130A306 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACR and Staff Concerns |
ML17130A279 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
05000277/LER-2017-001 | 8 March 2017 | Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 2 Regarding Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection |
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | 26 August 2016 | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) |
ML16228A062 | 15 August 2016 | Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin |
ML16099A272 | 2 August 2016 | Staff Evaluation for Phase 2 of NRC Order EA-13-109 |
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | 15 December 2015 | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | 27 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) |
ML15026A469 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) |
ML13317A950 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846 |
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 | 25 August 2011 | FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 |
ML11237A007 | 25 August 2011 | FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 |
ML20045G613 | 8 July 1993 | Responds to Unresolved Items Noted in Edsfi Repts 50-277/93-80 & 50-278/93-80.Corrective Actions:Periodic Surveillance Testing of EDG Conducted to Assure Operational Availability & Capacity to Perform Shutdown Functions |
ML20106A679 | 12 September 1984 | Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept |