ML23173A05710 April 20239 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted
ML23062A4193 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted)
ML23062A2153 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria, Table of Contents. (Redacted)
IR 05000482/202000212 August 2020Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001
ML20150A00729 May 2020License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML19114A1958 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns
ML19114A1728 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
ML19114A1718 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Table of Contents
ML19015A42211 March 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109
IR 05000277/201800413 February 2019Integrated Inspection Report 05000277/2018004 and 05000278/2018004 and Exercise of Enforcement Discretion
ML18157A2606 June 2018Supplemental Information to Support Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants.
ML17243A01430 August 2017Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors.
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)28 August 2017Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
IR 05000277/20170023 August 2017Integrated Inspection Report 05000277/2017002 and 05000278/2017002 and Exercise of Enforcement Discretion
ML17130A3066 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACR and Staff Concerns
ML17130A2796 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
05000277/LER-2017-0018 March 2017Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 2 Regarding Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)26 August 2016Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)
ML16228A06215 August 2016Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin
ML16099A2722 August 2016Staff Evaluation for Phase 2 of NRC Order EA-13-109
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
RS-15-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)
ML15026A46912 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents)
ML13317A95020 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/1125 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML11237A00725 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML20045G6138 July 1993Responds to Unresolved Items Noted in Edsfi Repts 50-277/93-80 & 50-278/93-80.Corrective Actions:Periodic Surveillance Testing of EDG Conducted to Assure Operational Availability & Capacity to Perform Shutdown Functions
ML20106A67912 September 1984Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept